Wire laundry area. Pull out existing single-phase washer feeds and pull in three-phase feeds. Wire only 2 additional washers not on site yet. Pull out existing single-phase dryer feeds and pull in three-phase feeds for 2 dryers. Wire only 2 additional dryers. Wire feed for ironer. Wire the inline makeup air unit in the shaft. Interlock the MUA with the wall damper and dryers. Pool Area- Flush 4-gang control timer box with sheetrock face. Install misc. GFl, plugs, and switches were previously roughed. Wire bath fans. Install 2 switch controls. Install 4 puck lights and 2 wall fixtures, pool baths. Bond and wire 1 Pool heater 20-amp 120V. Bond and wire 1 Pool pump on contractor supplied time clock. Supply and install outlet for chemical feeder. Supply and install pool panel interior. Wire and install sauna vapor light. Wire and install low voltage skylights. Wire for 2 mag locks, 2 RFID devices, drivers, 2 eyes. Wire 2 waterproof Chandeliers above pool Roof equipment install 120V waterproof outlet for existing heat wrap tape.
Work at this address
1595 Post Rd E
Westport, Connecticut · Parcel H09120000
15 matched work records at this property, plus documented work nearby.
Work at this address
Recorded work history
15 matched records.
Upgrade for additional work to the existing portion of the building in guest rooms.
Rough in and installation of 2 bathrooms in pool area. Including 2 showers, 2 lavs, 2 toilets, 1 urinal.
Supply and install all electrical work for pool bonding, pool equipment, power, and lighting for the complete pool area.
Remodel the indoor pool and provide a code-conforming enclosure.
Install hood as per plans for Delamar Hotel, according to state and municipal codes. Hoods only and ducting. Install pizza oven.
Installation of (2) UL-300-approved wet chemical fire suppression system for the kitchen hood located at Westport Inn.
Installation of new fire sprinkler piping and heads in the existing building. The existing riser and backflow device will be used.
Supply and install all fire alarm per contract drawings.
Full NFPA 13 system. Install full NFPA 13 system in new section only.
Install RTUs and room HVAC systems as specified by prints.
CRS #14989680 – Install 3000 amp service.
Supply and install all electrical work for rough and trim for 48 new construction units, to include 38 remodeled units, install new switchgear, telephone, cctv, underground conduit for service feeders all exterior site and landscaping lighting, wiring of a 130kw generator.
Complete rough-in for 48 units, including waste, water, and vents. Renovation of an existing wing of 18 units with various fixture swap-outs, plumbing re-roughing, and new installs where needed. New commercial kitchen in the existing wing.
Addition to an existing building. A 48-unit, 3-story addition to the rear building; renewed restaurant and kitchen. Delamar. Upgrade for additional work to the existing portion of the building in guest rooms.
Work near you
Providers used near 1595 Post Rd E
Showing documented work within 1 mile. Markers are work locations—not provider offices.
This map uses standard image tiles and does not require WebGL.
Open the mapProviders used nearby
0 local providers to explore
Grouped by specialty, with uncategorized work last. Within each specialty, providers are ordered by recent documented work and nearby job count.
Some nearby work records do not identify a provider, and others may still be awaiting a confident property match.
Property facts come from Connecticut’s statewide Parcel and CAMA release. Owner and mailing-address fields are not published here. This page includes work history confidently matched to this address.