Installing 7 lab sinks with 5 regular sinks.
Work at this address
20 Saugatuck Ave
Westport, Connecticut · Parcel B06077000
32 matched work records at this property, plus documented work nearby.
Work at this address
Recorded work history
32 matched records.
Install 3-ton hydro system for renovation.
New receptacles, relocation of existing light fixtures, and upgrades to emergency and exit lighting.
Interior renovation to second floor for new tenant salon suites.
Additions to the existing fire alarm system for interior alterations on the first floor for a new tenant.
Interior alteration on the first floor. Low-voltage wiring and devices for the Crestron control system, telephone/data, and audio-video sound system.
Two bathrooms and one kitchen with pump-on-demand electric heaters.
Design, provide, and install wet pendent, dry pendent, and dry upright sprinkler coverage, utilizing existing wet and dry system sprinkler mains per NFPA 13.
Interior alteration on first floor New lighting and receptacles. New power for 2 5-ton air conditioning units.
Install two 5-ton heat pump and central air conditioning units.
Interior alteration to first-floor tenant "2" for new office space.
Install Firestone Full Force EPDM .060-thick fire-rated self-adhesive membrane as a new roofing system.
Renovate existing bathroom and install sink in existing pantry.
Install 14 sf free-standing sign and 24 sf wall sign.
Relocating and adding vents off the existing system.
Relocate lighting, add receptacles for desks, and add fire alarm smoke detectors and devices.
Tenant fit-up, first floor, east side — Remax.
Install a new toilet on the existing rough, relocate the lavatory to conform to ADA requirements, install a new floor drain and funnel drain in the mechanical room, and install 1" RP7 for future irrigations.
Wiring for a new fire alarm system; power for the alarm panel; relocation of electric switches, receptacles, and miscellaneous items for a new tenant subdivision.
Landlord work for a sprinkler system for Building A and part of Building B.
New fire sprinkler installation.
Fire alarm system wiring and FACP for landlord and core, and for the sprinkler system with power to the fire alarm.
Tenant fit-up for a new day care facility—the Goddard School.
Install new fire sprinkler system.
Installation of 7 ducted systems and 7 fresh air intakes with motorized dampers.
Rough and finish plumbing as per plans.
Wiring of a new fire alarm system within the tenant space. Add NAC panel and devices as per submitted plans.
Wiring of new tenant space for a day care center, including telephone/data wiring, security wiring, and HVAC control wiring.
See sub permits.
Running 2 gas lines to 2 navians.
Landlord work: façade renovations and interior finish removal for future tenants.
New façade lighting, electrical demolition and clean up, new parking lot lighting (2 light poles), relocate 4 lighting bollards, install heat trace on roof.
Work near you
Providers used near 20 Saugatuck Ave
Showing documented work within 1 mile. Markers are work locations—not provider offices.
This map uses standard image tiles and does not require WebGL.
Open the mapProviders used nearby
0 local providers to explore
Grouped by specialty, with uncategorized work last. Within each specialty, providers are ordered by recent documented work and nearby job count.
Some nearby work records do not identify a provider, and others may still be awaiting a confident property match.
Property facts come from Connecticut’s statewide Parcel and CAMA release. Owner and mailing-address fields are not published here. This page includes work history confidently matched to this address.