Fire alarm device wiring and installation for new fit-out. Tie into the existing system.
Work at this address
518 Riverside Ave
Westport, Connecticut · Parcel B06044000
21 matched work records at this property, plus documented work nearby.
Work at this address
Recorded work history
21 matched records.
Disconnect and remove (2) existing toilets and (2) existing lavatories. Install new fixtures on existing rough plumbing.
Demolition of existing ductwork and replacement with new ductwork.
Relocate heads to accommodate the new ceiling layout.
Renovation to existing tenant space Corient Financial25 new lighting fixtures and 12 relocated lighting fixtures, 28 lighting controls, 35 receptacles, 3 backbox and conduit sleeves for t-stats wiring by others, Pull 4 single gang cat5e locations and 14 two gang cat5e locations for furniture only, terminations testing and all low voltage equipment by others. Safe off and disconnects temp lighting and power, Demo by others.
Corient westport interior office renovation. Selective renovation and demolition on second floor of 2-story building. New construction includes partitions, doors, ceilings, power, lighting, and finishes. No change in occupany classification. No change to structural elements.
Make safe demo, 12 feeds only for 4 electric locks, 4 xists and, 4 door contactors.
Construction of a new wall in the rear of the first-floor office with a door, creating a vestibule to separate the second-floor stairwell exit from the first-floor office area.
Installation of a structured cabling system for 5 wireless access points. Installation of a ladder rack in the data closet.
Transitioning the existing IT network and upgrading to the Morgan Stanley IT network on the first floor. New IT equipment at the existing data closet.
New, relocated, and demolished ductwork and rgd per new office layout. 1 new zone damper. New server room unit.
Rework existing office space for a new furniture layout.
Relocate heads.
I.
Interior renovations for existing "parametric risk advisors" (suite 1) on first floor.
Install 4, relocate 3, and cap 2 pendant fire sprinkler heads in the new office. Remove and replace all CSC-recalled fire sprinkler heads throughout the second floor only.
Install new plumbing for kitchen sink, toilet, shower, and sink.
Wire new office space on the second floor and bathroom.
Interior renovation for new office tenant "lcr" on second floor, building "a" front.
Description unavailable
Remove the inground oil tank and install a 1000-gallon underground LP tank, with exterior gas piping to the building.
Work near you
Providers used near 518 Riverside Ave
Showing documented work within 1 mile. Markers are work locations—not provider offices.
This map uses standard image tiles and does not require WebGL.
Open the mapProviders used nearby
0 local providers to explore
Grouped by specialty, with uncategorized work last. Within each specialty, providers are ordered by recent documented work and nearby job count.
Some nearby work records do not identify a provider, and others may still be awaiting a confident property match.
Property facts come from Connecticut’s statewide Parcel and CAMA release. Owner and mailing-address fields are not published here. This page includes work history confidently matched to this address.