Hardwiring an evse set to 48 amps and mounted inside garage. Installing 3/4" emt between the evse and the existing 100-amp non-critical loads sub-panel, which is fed by the existing 200-amp main breaker panel. Installing a 60-amp breaker in sub-panel to protec the evse. Also installing power smart load management to protect the charger from overloading the 100-amp sub panel. Evse had built-in GFCI protection.
Work at this address
62 Woodside Ave
Westport, Connecticut · Parcel B10096000
9 matched work records at this property, plus documented work nearby.
Work at this address
Recorded work history
9 matched records.
Replace (2) existing condensers.
Installation of 2 Tesla Powerwalls.
Permit upgrade to install Tesla Gateway for a future battery.
Remove existing roofing and install a new roof per the attached contract, with 6 nails per shingle and taped plywood joints.
Installation and wiring of roof mounted 14.000 kW grid tied solar PV system consisting of 40 sunpower modules and inverters, located on southwest facing roof of house and tied into existing 200a electrical service pane49000l. Structural upgrades required.*. Upgrade for tesla gateway.
See sub-permits.
Installing a Mitsubishi Hyper Heat system.
Run 2 dedicated circuits from the panel to outside condensing units.
Work near you
Providers used near 62 Woodside Ave
Showing documented work within 1 mile. Markers are work locations—not provider offices.
This map uses standard image tiles and does not require WebGL.
Open the mapProviders used nearby
0 local providers to explore
Grouped by specialty, with uncategorized work last. Within each specialty, providers are ordered by recent documented work and nearby job count.
Some nearby work records do not identify a provider, and others may still be awaiting a confident property match.
Property facts come from Connecticut’s statewide Parcel and CAMA release. Owner and mailing-address fields are not published here. This page includes work history confidently matched to this address.