1 Hospital Plaza
Stamford, CTCommercial Alteration Level II of 1,627 SF on the ground floor of the Warner building for demolition and installation of new VIR equipment and support staff spaces.
$850KLocal provider profile
Documented work across Connecticut based on attributed municipal records.
Work history
Individual records are grouped by address. Totals include only values reported in public records and may not equal final construction cost.
Commercial Alteration Level II of 1,627 SF on the ground floor of the Warner building for demolition and installation of new VIR equipment and support staff spaces.
$850KFoundation / Earthwork – Commercial
Plumbing Work
Alteration
Commercial Addition and Alterations Level 3, new elevator, structural, mechanical, electrical, plumbing, fire protection, fire alarm. Concession and lobby space in adjacent building (B-26-53 296 Bedford St.) fire separated.
$11MAlteration Electrical
$70KAlteration Electrical
$70KAlteration Electrical
$97.3KELE
Alteration
$200KPlumbing Work
Alteration
$75KAlteration
$75KAlteration
$325KPlumbing Work
Plumbing Work
PLU
This project consists of three 3 3-story additions to an existing 3-story assisted living facility seperated into 4 buildings by fire walls. Two additions will be made to Building A and one addition to Building D/E.
$14MThis project consists of three 3 3-story additions to an existing 3-story assisted living facility seperated into 4 buildings by fire walls. Two additions will be made to Building A and one addition to Building D/E.
$14MCommon area renovations: Partial renovation of the first-floor common spaces in the existing building. Selective demolition per plans to prepare for reconstruction and renovation. Most of the work involves removing or altering walls.
$1.5MPlumbing Work
Plumbing Work
Alteration
$52.5KElectrical Work
Alteration Commercial
$238KElectrical Work
Plumbing Work
Electrical Work
ELE
Plumbing Work
Plumbing Work
Electrical Work
Plumbing Work
Commercial interior renovations to an existing 37,185 SF office space on the 6th floor for Primo Brands.
$3.3MCommercial interior renovations to an existing 37,185 SF office space on the 6th floor for Primo Brands.
$3.3MCommercial business office improvement: Level 2 alteration of an existing office space on the 5th floor. Total space is 8,320 SF.
$200KRemove the existing convenience stair structure between the 6th and 7th floors. Cover the floor opening with new floor structure. No change to use, egress, or occupancy. Work area: 1,000 SF. Use Group B.
$75KPlumbing Work
Plumbing Work
Sign Work
$50Alteration Commercial
$120KPlumbing Work
Plumbing Work
Alteration
Ems bereavement rooms.
$52KCommercial: Concrete and steel repair of a five-story, approximately 212,000 SF parking garage structure attached to a hotel (also known as Armon/Crown Plaza). Permit includes special inspections and testing.
$608KInterior alterations of an existing space for a new Use Group B office tenant. Fifth floor: 5,018 SF.
$190KInterior alterations of an existing space for a new Use Group B office tenant. Fifth floor: 5,018 SF.
$190KInterior fit-out of a 1,908 SF area for Use Group B corporate office space on the third floor.
$200KFoundation only building -e.
$191KFoundation only building -e.
$191KFoundation site work.
$968KFoundation only building # -b.
$52.1KFoundation only, building # A-2.
$50.6KFoundation only, building # A1.
$49.5KFoundation only builing c.
$228KFoundation only, building F-3.
$188KFoundation only building -d.
$107KFoundation only building -f-2.
$191KFoundation only for a building. Community Center.
$59.7KLevel 2 alteration: Interior renovation of existing Use Group B office space on the second floor. Work area: 16,657 SF.
$1.2MZone
Zone
Add To & Alter
$18MAlteration Commercial Electrical
$3.6MPlumbing Work
Plumbing Work
Plumbing Work
1 Alteration
$20KElectrical Work
Interior alterations to existing meeting areas, offices, and reception on the fourth floor.
$300KInstall a 38-by-80-foot membrane structure with a noncombustible frame in the exhibition area.
$600K1 Alteration
1 Alteration
Sign Work
$50HVAC
PLU
Plumbing Work
Plumbing Work
PLU
PLU
PLU
Plumbing Work
Plumbing Work
Alteration
$309KPlumbing Work
Plumbing Work
Plumbing Work
Electrical Work
Electrical Work
Alteration
$80KAlteration
$180KZone
Zone
Zone
Zone
Plumbing Work
Structural repairs to existing wood columns.
$100KElectrical Work
New dunnage platform to relocate 2 new chillers on the fourth-floor parking deck at Freepoint Commodities, 58 Commerce Road.
$1.2M