A.P.Construction Co.

Documented work across Connecticut based on attributed municipal records.

Reported work volume$111.5MDocumented jobs
Average project$1.4MWhere values are reported
First observed2016Available dataset
Categories8Observed work types
Used for work inGreenwich85 jobs

Contact information

Details found in public records

These details have not necessarily been claimed or independently confirmed by the provider.

Phone
(203) 388-1136source record
Phone
(203) 609-2444source record

Work history

Documented work by property

Individual records are grouped by address. Totals include only values reported in public records and may not equal final construction cost.

Satellite view of 2 Greenwich Plz, Greenwich, CTSatellite view
2021

2 Greenwich Plz

Greenwich, CT
  • 2021Addition

    Third floor: New reception ceiling and lighting. State education fee: $7.28. HVAC: Replace 3 existing ceiling grills; all else to remain as-is. Electrical: NEC. Supply and install 17 new recess lights in the reception lobby of the existing office space (third floor, Cummings and Lockwood).

    $28K
  • 2021Addition

    Modifications to existing tenant space in Building 1 on the third floor, including a pantry, conference rooms, and an open area. State education fee: $117.

    $450K
  • 2020Renovation

    Lessee: AQR tenant alterations on the ground floor include new toilets, a lounge, a mailroom, and a security office. State education fee paid: $91. Plumbing, First floor: 3 water closets, 2 urinals, and 5 sinks; connect to existing sanitary vent and domestic water; new hot water heater; provide and install new piping and fixtures. Electrical: Install new receptacles, switches, lighting, air conditioning units, and new VAV units. Electrical (2): Install CAT 6 cabling for 4 WAP locations, 8 IP camera locations, 3 wall phone locations, 12 desk locations, and 6 TV locations; 60 cables in new client center on the first floor.

    $350K
  • 2016Renovation

    Lessee: AQR Capital Management. Interior alteration of existing office space with no change in use or occupancy. State education fee paid: $13.00. Electrical: 33 devices installed; relocate existing 2-by-2-foot lighting (4); install new undercabinet lighting 2 and new ceiling occupancy sensors (13); relocate exit light switches (2); install new light switches (3); relocate 2 existing receptacles; install 7 new receptacles. Plumbing: relocate heads to accommodate new walls and ceiling layout.

    $50K
Satellite view of 200 N Maple Ave, Greenwich, CTSatellite view
2020

200 N Maple Ave

Greenwich, CT
  • 2020Renovation

    Demo north wing of exist'g Performing Arts Center, approximately3786 sf to be removed. Adjacent parking lot and site improvements(such as walkways)will also be demo'd to prepare for future add'tn. State ed fee paid $7.80 Amend #1: 11.5.20 val $6,250 fee $95,415 new visual art center addition HVAC: IMC. Furnish and install 1 Mitsubishi Multi system; furnish and install 1 RTU; furnish/install 1 ERU/furnish and install radiant heating; furnish and install RGD's; furnish and install hot water unit heaters. 2015 IECC electrical: disconnect and safe off for demolition. Amendment (3/1/21): NEC. Underground conduits for fire alarm, power, security and lighting. Amendment (5/21/21): NEC. Addition to existing Visual Arts Building; 104 fire alarm devices, 5 electrical panelboards, connection to 37 mechanical units, 15 site lighting, 62 lighting controls; 27 switches, 112 outlets, and 217 light fixtures. Existing 1200-amp service electrical (2): low voltage wiring for hvac equipment electrical (3): install controls for hvac equipment; install thermostats PLUMB: furnish labor for demo of plumbing. Amendment (5/18/21): install 3 roof drains; Basement: 1 nw: water foundtain, 1 nw: floor-drn.; First floor: 1 nw: water closet, sink, water fountain; Second floor: 1 nw: water closet, water fountain, 5 nw: sinks.

    $30K
  • 2020Demolition

    Zone L-1, basement floor. Demolition of the north wing of the existing Performing Arts Center, approximately 3786 sf to be removed. The adjacent parking lot and site improvements, such as walkways, will also be demolished to prepare for a future addition. State education fee paid: $7.80. Amendment #1: 11.5.20; value: $6,250; fee: $95,415; new visual art center addition. Electrical: disconnect and make safe for demolition. Electrical (2): low-voltage wiring for HVAC equipment. Plumbing: furnish labor for demolition of plumbing.

    $30K
  • 2020Demolition

    Zone E-1: Demolish the north wing of the existing Performing Arts Center, approximately 3786 sf. The adjacent parking lot and site improvements, such as walkways, will also be demolished to prepare for a future addition. State education fee paid: $7.80. Amendment #1 dated 11.5.20: value $6,250; fee $95,415; new visual art center addition. Electrical: Disconnect and make safe for demolition. Electrical (2): Low-voltage wiring for HVAC equipment. Plumbing: Furnish labor for plumbing demolition.

    $30K
  • 2020Demolition

    ZONE 1-2 FIRST FLOOR - - Demo north wing of exist'g Performing Arts Center, approximately3786 sf to be removed. Adjacent parking lot and site improvements(such as walkways)will also be demo'd to prepare for future add'tn. State ed fee paid $7.80 Amend #1: 11.5.20 val $6,250 fee $95,415 new visual art center addition electrical: disconnect and safe off for demolition electrical (2): low voltage wiring for hvac equipment PLUMB: furnish labor for demo of plumbing.

    $30K
  • 2020Demolition

    Zone 2-1, second floor: Demolition of the north wing of the existing Performing Arts Center, approximately 3786 sf to be removed. The adjacent parking lot and site improvements, such as walkways, will also be demolished to prepare for a future addition. State education fee paid: $7.80. Amendment #1 dated 11.5.20: value $6,250; fee $95,415; new visual art center addition. Electrical: Disconnect and make safe for demolition. Electrical (2): Low-voltage wiring for HVAC equipment. Plumbing: Furnish labor for demolition of plumbing.

    $30K
  • 2020Demolition

    Zone 1-1, first floor. Demolish the north wing of the existing Performing Arts Center, approximately 3786 sf to be removed. The adjacent parking lot and site improvements, such as walkways, will also be demolished to prepare for a future addition. State education fee paid: $7.80. Amendment #1, dated 11.5.20: value $6,250; fee $95,415. New visual art center addition: Electrical–disconnect and make safe for demolition; electrical (2)–low-voltage wiring for HVAC equipment; plumbing–furnish labor for plumbing demolition.

    $30K
  • 2019New Construction

    Retaining wall at North Parking Lot. New state education fee paid: $3.90.

    $15K
Satellite view of 1 Greenwich Plaza, Greenwich, CTSatellite view
2020

1 Greenwich Plaza

Greenwich, CT
  • 2020Renovation

    Tenant fit-out on the third floor of Building #1. State education fee paid: $58.50.

    $225K
  • 2020Renovation

    Construct a demising wall on the third floor of building #1. State education fee paid: $19.50.

    $75K
Satellite view of 328 Pemberwick Rd, Greenwich, CTSatellite view
2020

328 Pemberwick Rd

Greenwich, CT
  • 2020Renovation

    Exterior renovations and mechanical/electrical upgrades. State education fee paid: $117.

    $450K
Satellite view of 2 Sound View Dr, Greenwich, CTSatellite view
2020

2 Sound View Dr

Greenwich, CT
  • 2020Renovation

    Tenant office alteration to the second floor, including new offices, a conference room, a pantry, and an open area. State education fee paid: $33.80. Plumbing: Furnish labor and material to install plumbing for the new pantry. HVAC: Demolish console heat pumps and install new ceiling-mounted heat pumps with related ductwork and piping, as per plans on file. Electrical: Install 10 2-by-2-foot lights and 10 receptacles in the SteepRock tenant space on the second floor.

    $130K
  • 2016Renovation

    Lessee: Houlihan Lawrence. Interior renovation for a tenant space on the first floor. State education fee paid: $222.30. Electrical: 30 pendant lights, 100 recessed lights, 20 switches, 12 floor boxes, and 30 wall outlets. 2011 NEC electrical (2): 75 dual category 5e cables; terminate and test. Plumbing, First floor: 2 new water closets, basins, and 1 new sink. HVAC: Furnish and install 10 water source heat pumps, associated ductwork, grills, diffusers, and controls (all indoor equipment).

    $855K
Satellite view of 340 Pemberwick Rd, Greenwich, CTSatellite view
2019

340 Pemberwick Rd

Greenwich, CT
  • 2019Mechanical

    Zone 3; third floor; 1881 building. Interior alterations to create 26 residential units. State education fee paid: $1,251.12. HVAC: Supply and install 27 hydro-air systems per plans; supply and install hydro-air piping only, with boiler by others; and supply and install 8 Mitsubishi systems per plans. Plumbing: Basement: Install 1 water closet, 2 basins, 2 floor drains, and 2 hose bibs. First floor: Install 11 water closets, 10 tubs, 16 basins, 4 showers, 11 sinks, 12 clothes washers, 12 dishwashers, 10 floor drains, and 2 hose bibs. Second floor: Install 12 water closets, 11 tubs, 20 basins, 6 showers, 11 sinks, 11 clothes washers, 11 dishwashers, and 12 floor drains. Electrical: Change service to 1600 amps. Install 1139 devices. 26 gas ranges, gas clothes dryers, dishwashers, and water heaters. Install 30 2-ton air conditioning. New wiring to receptacles, lights, panel, fire alarm, telephone, data, and cable TV. New elevator. New feeder to common area panel.

    $4.8M
  • 2019Mechanical

    International Building Code (IBC) 2015. Zone 2. Second floor, 1881 building: Interior alterations to create 26 residential units. State education fee paid: $1251.12. HVAC: Supply and install 27 hydro-air systems per plans; supply and install hydro-air piping only, with boiler by others; supply and install 8 Mitsubshi systems per plans. Plumbing: Basement: Install 1 water closet, 2 basins, 2 floor drains, and 2 hose bibs. First floor: Install 11 water closets, 10 tubs, 16 basins, 4 showers, 11 sinks, 12 clothes washers, 12 dishwashers, 10 floor drains, and 2 hose bibs. Second floor: Install 12 water closets, 11 tubs, 20 basins, 6 showers, 11 sinks, 11 clothes washers, 11 dishwashers, and 12 floor draiins. Electrical: Change service to 1600 amps. Install 1139 devices. 26 gas ranges, gas clothes dryers, dishwashers, and water heaters. Install 30 2-ton air conditioning. New wiring to receptacles, lights, panel, fire alarm, telephone, data, and cable TV. New elevator. New feeder to common area panel.

    $4.8M
  • 2019Renovation

    Interior demolition to core for structural and architectural design investigation. State education fee paid: $14.30.

    $55K
  • 2019Renovation

    Interior alterations to create 26 residential units. State education fee paid: $1251.12. HVAC: Supply and install 27 hydro-air systems per plans; supply and install hydro-air piping only, with boiler by others; and supply and install 8 Mitsubshi systems per plans. Plumbing: Basement: Install 1 water closet, 2 basins, 2 floor drains, and 2 hose bibs. First floor: Install 11 water closets, 10 tubs, 16 basins, 4 showers, 11 sinks, 12 clothes washers, 12 dishwashers, 10 floor drains, and 2 hose bibs. Second floor: Install 12 water closets, 11 tubs, 20 basins, 6 showers, 11 sinks, 11 clothes washers, 11 dishwashers, and 12 floor drains. Electrical: Change service to 1600 amps. Install 1139 devices. 26 gas ranges, gas clothes dryers, dishwashers, and water heaters. Install 30 2-ton air conditioning. New wiring to receptacles, lights, panel, fire alarm, telephone, data, cable TV, new elevator, and new feeder to common area panel. Electrical (2): Install security systems, including 4 card readers, 4 electric strikes, 5 cameras, and 2 intercom panels. Electrical (3): NEC. Low-voltage wiring for video and network.

    $4.8M
  • 2019Mechanical

    Zone 1, first floor, 1881 building. Interior alterations to create 26 residential units. State education fee paid: $1251.12. HVAC: Supply and install 27 hydro-air systems per plans; supply and install hydro-air piping only, boiler by others; supply and install 8 Mitsubshi systems per plans. Plumbing: Basement: Install 1 water closet, 2 basins, 2 floor drains, and 2 hose bibs. First floor: Install 11 water closets, 10 tubs, 16 basins, 4 showers, 11 sinks, 12 clothes washers, 12 dishwashers, 10 floor drains, and 2 hose bibs. Second floor: Install 12 water closets, 11 tubs, 20 basins, 6 showers, 11 sinks, 11 clothes washers, 11 dishwashers, and 12 floor drains. Electrical: Change service to 1600 amps. Install 1139 devices. 26 gas ranges, gas clothes dryers, dishwashers, and water heaters. Install 30 2-ton air conditioning. New wiring to receptacles, lights, panel, fire alarm, telephone, data, cable TV. New elevator. New feeder to common area panel.

    $4.8M
Satellite view of 1275 King St, Greenwich, CTSatellite view
2018

1275 King St

Greenwich, CT
  • 2018Renovation

    Zone 7. Second floor: Renovate the interior for a school and make parking lot improvements. No work in the existing kitchen to remain. State education fee paid: $520.00.

    $2M
  • 2018Renovation

    Zone 2. Lower level: Renovate the interior for a school and make parking lot improvements. No work in the existing kitchen, which is to remain. State education fee paid: $520.00.

    $2M
  • 2018Renovation

    Zone 4. First floor: Renovate the interior for a school and make parking lot improvements. No work in the existing kitchen, which is to remain. State education fee paid: $520.00.

    $2M
  • 2018Renovation

    Zone 5. First floor: Renovate the interior for a school and make parking lot improvements. No work in the existing kitchen to remain. State education fee paid: $520.00.

    $2M
  • 2018Renovation

    Zone 6, second floor: Renovate the interior for a school and make parking lot improvements. No work in the existing kitchen to remain. State education fee paid: $520.00.

    $2M
  • 2018Renovation

    Zone 3. Lower level: Renovate the interior for a school and make parking lot improvements. No work in the existing kitchen to remain. State education fee paid: $520.00.

    $2M
  • 2018Renovation

    Renovate the interior for a school; parking lot improvements. No work in the existing kitchen to remain. State education fee paid: $520.00. Amendment #1: On 6.1.18, amended for bathroom and structural changes.

    $2M
  • 2018Renovation

    Zone 8. Three-level stairwell. Renovate the interior for a school and make parking lot improvements. No work in the existing kitchen to remain. State education fee paid: $520.00.

    $2M
Satellite view of 100 W Putnam Ave, Greenwich, CTSatellite view
2018

100 W Putnam Ave

Greenwich, CT
  • 2018Renovation

    Demising wall on the third floor. State education fee paid: $2.60.

    $10K
Satellite view of 8 Sound Shore Dr, Greenwich, CTSatellite view
2017

8 Sound Shore Dr

Greenwich, CT
  • 2017Renovation

    Lessee: Brynwood Partners. Interior alteration to existing office space on the second floor. State education fee paid: $5.20.

    $20K
Satellite view of 2 Pickwick Plz, Greenwich, CTSatellite view
2016

2 Pickwick Plz

Greenwich, CT
  • 2016Demolition

    Zone G-1 - Garage Level C - Lobby, restrooms and corridors restoration. State Ed. Fee paid.: $390.00 PLUMB: first floor: replace 7 water closets, 1 nw: water closet, replace 6: basins, 1 nw basin, mop sink, replace 2: urinals, 2 floor-drns.; Second floor: replace 7 water closets, 1 nw: water closet, replace 6: basins, 1 nw: basin; mop sink, replace 2: urinals, 2: flrl-drns.; Third floor: replace 7: water closets, 1 nw: water closet; replace 6: basins, 1 nw: basin; mop sink, replace 2: urinals, 2: floor-drns.; fourth floor.: replace 7: water closets, 1 nw: water closet; replace 6: basins, 1 nw: basin, mopsink, replace 2: urinals, 2 floor-drns., core bathroom renovation, and new ADA bathroom. PLUMB (2): relocate sprinkler heads to accommodate new ceiling systems layout on multiple floors for corridors, bathrooms. And lobby areas. Prints in file BB. HVAC: replace 6 water source heat pumps and misc. Electrical. Htrs.; furnish and install registers and diffusers electrical: 606 devices installed; new elevator lobby "C " and "D" lighting; selective electrical. Demo - tmep. Lights,; relocate/rework base building fire alarm devices, new first floor. Lobby and corridor and bathroom. Lighting and services; floors 2, 3, 4 corridor and bathroom. Lighting and devices; relocate select heat pumps, ceiling mount, rework fire alarm; install remote invertors in electrical. Rooms for em lighting.

    $1.5M
  • 2016Renovation

    Zone 2. Renovation of the existing entry and landscape renovation of plantings and hardscape elements, including stairs, railings, lighting, and driveway. State education fee paid: $65.00. Amendment #1: $40 fee; back entrance, 2 sets of glass doors, carpet in the vestibule, and 2 lights.

    $250K
  • 2016Renovation

    Zone 3. Renovation of the existing entry and landscaping of plantings and hardscape elements, including stairs, railings, lighting, and driveway. State education fee paid: $65.00. Amendment #1: $40 fee; back entrance, 2 sets of glass doors, carpet in the vestibule, and 2 lights.

    $250K
  • 2016Demolition

    Second Floor - Zone 2A - Corridor - Lobby, restrooms and corridors restoration. State Ed. Fee paid.: $390.00 PLUMB: first floor: replace 7 water closets, 1 nw: water closet, replace 6: basins, 1 nw basin, mop sink, replace 2: urinals, 2 floor-drns.; Second floor: replace 7 water closets, 1 nw: water closet, replace 6: basins, 1 nw: basin; mop sink, replace 2: urinals, 2: flrl-drns.; Third floor: replace 7: water closets, 1 nw: water closet; replace 6: basins, 1 nw: basin; mop sink, replace 2: urinals, 2: floor-drns.; fourth floor.: replace 7: water closets, 1 nw: water closet; replace 6: basins, 1 nw: basin, mopsink, replace 2: urinals, 2 floor-drns., core bathroom renovation, and new ADA bathroom. HVAC: replace 6 water source heat pumps and misc. Electrical. Htrs.; furnish and install registers and diffusers electrical: 606 devices installed; new elevator lobby "C " and "D" lighting; selective electrical. Demo - tmep. Lights,; relocate/rework base building fire alarm devices, new first floor. Lobby and corridor and bathroom. Lighting and services; floors 2, 3, 4 corridor and bathroom. Lighting and devices; relocate select heat pumps, ceiling mount, rework fire alarm; install remote invertors in electrical. Rooms for em lighting.

    $1.5M
  • 2016Demolition

    Third Floor - Zone 3A - Corridor - Lobby, restrooms and corridors restoration. State Ed. Fee paid.: $390.00 PLUMB: first floor: replace 7 water closets, 1 nw: water closet, replace 6: basins, 1 nw basin, mop sink, replace 2: urinals, 2 floor-drns.; Second floor: replace 7 water closets, 1 nw: water closet, replace 6: basins, 1 nw: basin; mop sink, replace 2: urinals, 2: flrl-drns.; Third floor: replace 7: water closets, 1 nw: water closet; replace 6: basins, 1 nw: basin; mop sink, replace 2: urinals, 2: floor-drns.; fourth floor.: replace 7: water closets, 1 nw: water closet; replace 6: basins, 1 nw: basin, mopsink, replace 2: urinals, 2 floor-drns., core bathroom renovation, and new ADA bathroom. HVAC: replace 6 water source heat pumps and misc. Electrical. Htrs.; furnish and install registers and diffusers electrical: 606 devices installed; new elevator lobby "C " and "D" lighting; selective electrical. Demo - tmep. Lights,; relocate/rework base building fire alarm devices, new first floor. Lobby and corridor and bathroom. Lighting and services; floors 2, 3, 4 corridor and bathroom. Lighting and devices; relocate select heat pumps, ceiling mount, rework fire alarm; install remote invertors in electrical. Rooms for em lighting.

    $1.5M
  • 2016Demolition

    Fourth Floor - Zone 4B - Corridor - Lobby, restrooms and corridors restoration. State Ed. Fee paid.: $390.00 PLUMB: first floor: replace 7 water closets, 1 nw: water closet, replace 6: basins, 1 nw basin, mop sink, replace 2: urinals, 2 floor-drns.; Second floor: replace 7 water closets, 1 nw: water closet, replace 6: basins, 1 nw: basin; mop sink, replace 2: urinals, 2: flrl-drns.; Third floor: replace 7: water closets, 1 nw: water closet; replace 6: basins, 1 nw: basin; mop sink, replace 2: urinals, 2: floor-drns.; fourth floor.: replace 7: water closets, 1 nw: water closet; replace 6: basins, 1 nw: basin, mopsink, replace 2: urinals, 2 floor-drns., core bathroom renovation, and new ADA bathroom. HVAC: replace 6 water source heat pumps and misc. Electrical. Htrs.; furnish and install registers and diffusers electrical: 606 devices installed; new elevator lobby "C " and "D" lighting; selective electrical. Demo - tmep. Lights,; relocate/rework base building fire alarm devices, new first floor. Lobby and corridor and bathroom. Lighting and services; floors 2, 3, 4 corridor and bathroom. Lighting and devices; relocate select heat pumps, ceiling mount, rework fire alarm; install remote invertors in electrical. Rooms for em lighting.

    $1.5M
  • 2016Demolition

    Second Floor - Zone 2B - Corridor -Lobby, restrooms and corridors restoration. State Ed. Fee paid.: $390.00 PLUMB: first floor: replace 7 water closets, 1 nw: water closet, replace 6: basins, 1 nw basin, mop sink, replace 2: urinals, 2 floor-drns.; Second floor: replace 7 water closets, 1 nw: water closet, replace 6: basins, 1 nw: basin; mop sink, replace 2: urinals, 2: flrl-drns.; Third floor: replace 7: water closets, 1 nw: water closet; replace 6: basins, 1 nw: basin; mop sink, replace 2: urinals, 2: floor-drns.; fourth floor.: replace 7: water closets, 1 nw: water closet; replace 6: basins, 1 nw: basin, mopsink, replace 2: urinals, 2 floor-drns., core bathroom renovation, and new ADA bathroom. HVAC: replace 6 water source heat pumps and misc. Electrical. Htrs.; furnish and install registers and diffusers electrical: 606 devices installed; new elevator lobby "C " and "D" lighting; selective electrical. Demo - tmep. Lights,; relocate/rework base building fire alarm devices, new first floor. Lobby and corridor and bathroom. Lighting and services; floors 2, 3, 4 corridor and bathroom. Lighting and devices; relocate select heat pumps, ceiling mount, rework fire alarm; install remote invertors in electrical. Rooms for em lighting.

    $1.5M
  • 2016Renovation

    Lobby, restrooms, and corridors restoration. State education fee paid: $390.00. Amendment #1, dated 4.7.17: $40 fee; main entrance, 2 sets of new glass doors, stone panels on the exterior, and new roof drain.

    $1.5M
  • 2016Demolition

    First Floor - Zone 1C - Corridor - Lobby, restrooms and corridors restoration. State Ed. Fee paid.: $390.00 PLUMB: first floor: replace 7 water closets, 1 nw: water closet, replace 6: basins, 1 nw basin, mop sink, replace 2: urinals, 2 floor-drns.; Second floor: replace 7 water closets, 1 nw: water closet, replace 6: basins, 1 nw: basin; mop sink, replace 2: urinals, 2: flrl-drns.; Third floor: replace 7: water closets, 1 nw: water closet; replace 6: basins, 1 nw: basin; mop sink, replace 2: urinals, 2: floor-drns.; fourth floor.: replace 7: water closets, 1 nw: water closet; replace 6: basins, 1 nw: basin, mopsink, replace 2: urinals, 2 floor-drns., core bathroom renovation, and new ADA bathroom. HVAC: replace 6 water source heat pumps and misc. Electrical. Htrs.; furnish and install registers and diffusers electrical: 606 devices installed; new elevator lobby "C " and "D" lighting; selective electrical. Demo - tmep. Lights,; relocate/rework base building fire alarm devices, new first floor. Lobby and corridor and bathroom. Lighting and services; floors 2, 3, 4 corridor and bathroom. Lighting and devices; relocate select heat pumps, ceiling mount, rework fire alarm; install remote invertors in electrical. Rooms for em lighting.

    $1.5M
  • 2016Demolition

    First Floor - Zone 1D - Restrooms - Lobby, restrooms and corridors restoration. State Ed. Fee paid.: $390.00 PLUMB: first floor: replace 7 water closets, 1 nw: water closet, replace 6: basins, 1 nw basin, mop sink, replace 2: urinals, 2 floor-drns.; Second floor: replace 7 water closets, 1 nw: water closet, replace 6: basins, 1 nw: basin; mop sink, replace 2: urinals, 2: flrl-drns.; Third floor: replace 7: water closets, 1 nw: water closet; replace 6: basins, 1 nw: basin; mop sink, replace 2: urinals, 2: floor-drns.; fourth floor.: replace 7: water closets, 1 nw: water closet; replace 6: basins, 1 nw: basin, mopsink, replace 2: urinals, 2 floor-drns., core bathroom renovation, and new ADA bathroom. HVAC: replace 6 water source heat pumps and misc. Electrical. Htrs.; furnish and install registers and diffusers electrical: 606 devices installed; new elevator lobby "C " and "D" lighting; selective electrical. Demo - tmep. Lights,; relocate/rework base building fire alarm devices, new first floor. Lobby and corridor and bathroom. Lighting and services; floors 2, 3, 4 corridor and bathroom. Lighting and devices; relocate select heat pumps, ceiling mount, rework fire alarm; install remote invertors in electrical. Rooms for em lighting.

    $1.5M
  • 2016Demolition

    Third Floor - Zone 3B - Corridor - Lobby, restrooms and corridors restoration. State Ed. Fee paid.: $390.00 PLUMB: first floor: replace 7 water closets, 1 nw: water closet, replace 6: basins, 1 nw basin, mop sink, replace 2: urinals, 2 floor-drns.; Second floor: replace 7 water closets, 1 nw: water closet, replace 6: basins, 1 nw: basin; mop sink, replace 2: urinals, 2: flrl-drns.; Third floor: replace 7: water closets, 1 nw: water closet; replace 6: basins, 1 nw: basin; mop sink, replace 2: urinals, 2: floor-drns.; fourth floor.: replace 7: water closets, 1 nw: water closet; replace 6: basins, 1 nw: basin, mopsink, replace 2: urinals, 2 floor-drns., core bathroom renovation, and new ADA bathroom. HVAC: replace 6 water source heat pumps and misc. Electrical. Htrs.; furnish and install registers and diffusers electrical: 606 devices installed; new elevator lobby "C " and "D" lighting; selective electrical. Demo - tmep. Lights,; relocate/rework base building fire alarm devices, new first floor. Lobby and corridor and bathroom. Lighting and services; floors 2, 3, 4 corridor and bathroom. Lighting and devices; relocate select heat pumps, ceiling mount, rework fire alarm; install remote invertors in electrical. Rooms for em lighting.

    $1.5M
  • 2016Renovation

    Zone 1. Renovation of existing entry and landscaping, including plantings and hardscape elements (stairs, railings, lighting, and driveway). State education fee paid: $65.00. Amendment #1: $40 fee; back entrance, 2 sets of glass doors, carpet in the vestibule, and 2 lights.

    $250K
  • 2016Demolition

    First Floor - Zone 1B - Corridor - Lobby, restrooms and corridors restoration. State Ed. Fee paid.: $390.00 PLUMB: first floor: replace 7 water closets, 1 nw: water closet, replace 6: basins, 1 nw basin, mop sink, replace 2: urinals, 2 floor-drns.; Second floor: replace 7 water closets, 1 nw: water closet, replace 6: basins, 1 nw: basin; mop sink, replace 2: urinals, 2: flrl-drns.; Third floor: replace 7: water closets, 1 nw: water closet; replace 6: basins, 1 nw: basin; mop sink, replace 2: urinals, 2: floor-drns.; fourth floor.: replace 7: water closets, 1 nw: water closet; replace 6: basins, 1 nw: basin, mopsink, replace 2: urinals, 2 floor-drns., core bathroom renovation, and new ADA bathroom. HVAC: replace 6 water source heat pumps and misc. Electrical. Htrs.; furnish and install registers and diffusers electrical: 606 devices installed; new elevator lobby "C " and "D" lighting; selective electrical. Demo - tmep. Lights,; relocate/rework base building fire alarm devices, new first floor. Lobby and corridor and bathroom. Lighting and services; floors 2, 3, 4 corridor and bathroom. Lighting and devices; relocate select heat pumps, ceiling mount, rework fire alarm; install remote invertors in electrical. Rooms for em lighting.

    $1.5M
  • 2016Demolition

    First Floor - Zone 1A - Lobby Lobby, restrooms and corridors restoration. State Ed. Fee paid.: $390.00 PLUMB: first floor: replace 7 water closets, 1 nw: water closet, replace 6: basins, 1 nw basin, mop sink, replace 2: urinals, 2 floor-drns.; Second floor: replace 7 water closets, 1 nw: water closet, replace 6: basins, 1 nw: basin; mop sink, replace 2: urinals, 2: flrl-drns.; Third floor: replace 7: water closets, 1 nw: water closet; replace 6: basins, 1 nw: basin; mop sink, replace 2: urinals, 2: floor-drns.; fourth floor.: replace 7: water closets, 1 nw: water closet; replace 6: basins, 1 nw: basin, mopsink, replace 2: urinals, 2 floor-drns., core bathroom renovation, and new ADA bathroom. HVAC: replace 6 water source heat pumps and misc. Electrical. Htrs.; furnish and install registers and diffusers electrical: 606 devices installed; new elevator lobby "C " and "D" lighting; selective electrical. Demo - tmep. Lights,; relocate/rework base building fire alarm devices, new first floor. Lobby and corridor and bathroom. Lighting and services; floors 2, 3, 4 corridor and bathroom. Lighting and devices; relocate select heat pumps, ceiling mount, rework fire alarm; install remote invertors in electrical. Rooms for em lighting.

    $1.5M
  • 2016Demolition

    Fourth Floor - Zone 4C - Restrooms Lobby, restrooms and corridors restoration. State Ed. Fee paid.: $390.00 PLUMB: first floor: replace 7 water closets, 1 nw: water closet, replace 6: basins, 1 nw basin, mop sink, replace 2: urinals, 2 floor-drns.; Second floor: replace 7 water closets, 1 nw: water closet, replace 6: basins, 1 nw: basin; mop sink, replace 2: urinals, 2: flrl-drns.; Third floor: replace 7: water closets, 1 nw: water closet; replace 6: basins, 1 nw: basin; mop sink, replace 2: urinals, 2: floor-drns.; fourth floor.: replace 7: water closets, 1 nw: water closet; replace 6: basins, 1 nw: basin, mopsink, replace 2: urinals, 2 floor-drns., core bathroom renovation, and new ADA bathroom. HVAC: replace 6 water source heat pumps and misc. Electrical. Htrs.; furnish and install registers and diffusers electrical: 606 devices installed; new elevator lobby "C " and "D" lighting; selective electrical. Demo - tmep. Lights,; relocate/rework base building fire alarm devices, new first floor. Lobby and corridor and bathroom. Lighting and services; floors 2, 3, 4 corridor and bathroom. Lighting and devices; relocate select heat pumps, ceiling mount, rework fire alarm; install remote invertors in electrical. Rooms for em lighting.

    $1.5M
  • 2016Demolition

    Fourth Floor - Zone 4A - Corridor - Lobby, restrooms and corridors restoration. State Ed. Fee paid.: $390.00 PLUMB: first floor: replace 7 water closets, 1 nw: water closet, replace 6: basins, 1 nw basin, mop sink, replace 2: urinals, 2 floor-drns.; Second floor: replace 7 water closets, 1 nw: water closet, replace 6: basins, 1 nw: basin; mop sink, replace 2: urinals, 2: flrl-drns.; Third floor: replace 7: water closets, 1 nw: water closet; replace 6: basins, 1 nw: basin; mop sink, replace 2: urinals, 2: floor-drns.; fourth floor.: replace 7: water closets, 1 nw: water closet; replace 6: basins, 1 nw: basin, mopsink, replace 2: urinals, 2 floor-drns., core bathroom renovation, and new ADA bathroom. HVAC: replace 6 water source heat pumps and misc. Electrical. Htrs.; furnish and install registers and diffusers electrical: 606 devices installed; new elevator lobby "C " and "D" lighting; selective electrical. Demo - tmep. Lights,; relocate/rework base building fire alarm devices, new first floor. Lobby and corridor and bathroom. Lighting and services; floors 2, 3, 4 corridor and bathroom. Lighting and devices; relocate select heat pumps, ceiling mount, rework fire alarm; install remote invertors in electrical. Rooms for em lighting.

    $1.5M
  • 2016Demolition

    Second Floor - Zone 2C - Restrooms - Lobby, restrooms and corridors restoration. State Ed. Fee paid.: $390.00 PLUMB: first floor: replace 7 water closets, 1 nw: water closet, replace 6: basins, 1 nw basin, mop sink, replace 2: urinals, 2 floor-drns.; Second floor: replace 7 water closets, 1 nw: water closet, replace 6: basins, 1 nw: basin; mop sink, replace 2: urinals, 2: flrl-drns.; Third floor: replace 7: water closets, 1 nw: water closet; replace 6: basins, 1 nw: basin; mop sink, replace 2: urinals, 2: floor-drns.; fourth floor.: replace 7: water closets, 1 nw: water closet; replace 6: basins, 1 nw: basin, mopsink, replace 2: urinals, 2 floor-drns., core bathroom renovation, and new ADA bathroom. HVAC: replace 6 water source heat pumps and misc. Electrical. Htrs.; furnish and install registers and diffusers electrical: 606 devices installed; new elevator lobby "C " and "D" lighting; selective electrical. Demo - tmep. Lights,; relocate/rework base building fire alarm devices, new first floor. Lobby and corridor and bathroom. Lighting and services; floors 2, 3, 4 corridor and bathroom. Lighting and devices; relocate select heat pumps, ceiling mount, rework fire alarm; install remote invertors in electrical. Rooms for em lighting.

    $1.5M
  • 2016Demolition

    Third Floor - Zone 3C - Restrooms - Lobby, restrooms and corridors restoration. State Ed. Fee paid.: $390.00 PLUMB: first floor: replace 7 water closets, 1 nw: water closet, replace 6: basins, 1 nw basin, mop sink, replace 2: urinals, 2 floor-drns.; Second floor: replace 7 water closets, 1 nw: water closet, replace 6: basins, 1 nw: basin; mop sink, replace 2: urinals, 2: flrl-drns.; Third floor: replace 7: water closets, 1 nw: water closet; replace 6: basins, 1 nw: basin; mop sink, replace 2: urinals, 2: floor-drns.; fourth floor.: replace 7: water closets, 1 nw: water closet; replace 6: basins, 1 nw: basin, mopsink, replace 2: urinals, 2 floor-drns., core bathroom renovation, and new ADA bathroom. HVAC: replace 6 water source heat pumps and misc. Electrical. Htrs.; furnish and install registers and diffusers electrical: 606 devices installed; new elevator lobby "C " and "D" lighting; selective electrical. Demo - tmep. Lights,; relocate/rework base building fire alarm devices, new first floor. Lobby and corridor and bathroom. Lighting and services; floors 2, 3, 4 corridor and bathroom. Lighting and devices; relocate select heat pumps, ceiling mount, rework fire alarm; install remote invertors in electrical. Rooms for em lighting.

    $1.5M
  • 2016Demolition

    Zone G-2 - Garage Level D - Lobby, restrooms and corridors restoration. State Ed. Fee paid.: $390.00 PLUMB: first floor: replace 7 water closets, 1 nw: water closet, replace 6: basins, 1 nw basin, mop sink, replace 2: urinals, 2 floor-drns.; Second floor: replace 7 water closets, 1 nw: water closet, replace 6: basins, 1 nw: basin; mop sink, replace 2: urinals, 2: flrl-drns.; Third floor: replace 7: water closets, 1 nw: water closet; replace 6: basins, 1 nw: basin; mop sink, replace 2: urinals, 2: floor-drns.; fourth floor.: replace 7: water closets, 1 nw: water closet; replace 6: basins, 1 nw: basin, mopsink, replace 2: urinals, 2 floor-drns., core bathroom renovation, and new ADA bathroom. PLUMB (2): relocate sprinkler heads to accommodate new ceiling systems layout on multiple floors for corridors, bathrooms. And lobby areas. Prints in file BB. HVAC: replace 6 water source heat pumps and misc. Electrical. Htrs.; furnish and install registers and diffusers electrical: 606 devices installed; new elevator lobby "C " and "D" lighting; selective electrical. Demo - tmep. Lights,; relocate/rework base building fire alarm devices, new first floor. Lobby and corridor and bathroom. Lighting and services; floors 2, 3, 4 corridor and bathroom. Lighting and devices; relocate select heat pumps, ceiling mount, rework fire alarm; install remote invertors in electrical. Rooms for em lighting.

    $1.5M
Satellite view of 1 Pickwick Plz, Greenwich, CTSatellite view
2016

1 Pickwick Plz

Greenwich, CT
  • 2016Demolition

    First Floor - Zone 1B - Corridor - Lobby, restrooms and corridors renovation. State Ed. Fee paid.: $390.00 PLUMB: first floor, second floor., and third floor.: replace 7: water closets, 1 nw: water closet; replace 6 basins, 1 nw: basin; 1 sink replace 2: urinals, 2 new floor-drns.; core bathroom renovation; new ADA bathroom. Installation, mop sink. Electrical: 577 devices installed; new lobby, corridors, 1 thru 3 lighting, bathrooms., 1 thru 3 lighting; relocate existing heat pumps, relocate fire alarm devices, garage lobbies ABC and D lighting, selective electrical. Demo throughout phases, new exit signs, new fire alarm devices per plans and specs; install compact inverters in electrical. Rooms for EM lighting, relocate receptacles for new locations HVAC: replace 2 water soruce heat pump units; replace electrical. Htrs., registers and diffusers.

    $1.5M
  • 2016Demolition

    Zone G-4 - Garage Level D - Lobby, restrooms and corridors renovation. State Ed. Fee paid.: $390.00 PLUMB: first floor, second floor., and third floor.: replace 7: water closets, 1 nw: water closet; replace 6 basins, 1 nw: basin; 1 sink replace 2: urinals, 2 new floor-drns.; core bathroom renovation; new ADA bathroom. Installation, mop sink. PLUMB (2): relocate sprinkler heads to accommodate new ceiling systems layout on multiple floors for corridors, bathrooms., and lobby areas. Prints in file BB electrical: 577 devices installed; new lobby, corridors, 1 thru 3 lighting, bathrooms., 1 thru 3 lighting; relocate existing heat pumps, relocate fire alarm devices, garage lobbies ABC and D lighting, selective electrical. Demo throughout phases, new exit signs, new fire alarm devices per plans and specs; install compact inverters in electrical. Rooms for EM lighting, relocate receptacles for new locations HVAC: replace 2 water soruce heat pump units; replace electrical. Htrs., registers and diffusers.

    $1.5M
  • 2016Demolition

    Third Floor - Zone 3C - Restrooms - Lobby, restrooms and corridors renovation. State Ed. Fee paid.: $390.00 PLUMB: first floor, second floor., and third floor.: replace 7: water closets, 1 nw: water closet; replace 6 basins, 1 nw: basin; 1 sink replace 2: urinals, 2 new floor-drns.; core bathroom renovation; new ADA bathroom. Installation, mop sink. Electrical: 577 devices installed; new lobby, corridors, 1 thru 3 lighting, bathrooms., 1 thru 3 lighting; relocate existing heat pumps, relocate fire alarm devices, garage lobbies ABC and D lighting, selective electrical. Demo throughout phases, new exit signs, new fire alarm devices per plans and specs; install compact inverters in electrical. Rooms for EM lighting, relocate receptacles for new locations HVAC: replace 2 water soruce heat pump units; replace electrical. Htrs., registers and diffusers.

    $1.5M
  • 2016Demolition

    Zone G-3 - garage Level C - Lobby, restrooms and corridors renovation. State Ed. Fee paid.: $390.00 PLUMB: first floor, second floor., and third floor.: replace 7: water closets, 1 nw: water closet; replace 6 basins, 1 nw: basin; 1 sink replace 2: urinals, 2 new floor-drns.; core bathroom renovation; new ADA bathroom. Installation, mop sink. PLUMB (2): relocate sprinkler heads to accommodate new ceiling systems layout on multiple floors for corridors, bathrooms., and lobby areas. Prints in file BB electrical: 577 devices installed; new lobby, corridors, 1 thru 3 lighting, bathrooms., 1 thru 3 lighting; relocate existing heat pumps, relocate fire alarm devices, garage lobbies ABC and D lighting, selective electrical. Demo throughout phases, new exit signs, new fire alarm devices per plans and specs; install compact inverters in electrical. Rooms for EM lighting, relocate receptacles for new locations HVAC: replace 2 water soruce heat pump units; replace electrical. Htrs., registers and diffusers.

    $1.5M
  • 2016Demolition

    Third floor, Zone 3A: corridor and lobby; renovation of lobby, restrooms, and corridors. State education fee paid: $390.00. Plumbing: On the first, second, and third floors, replace 7 water closets and install 1 new water closet; replace 6 basins and install 1 new basin; install 1 sink; replace 2 urinals; install 2 new floor drains; core bathroom renovation; new ADA bathroom installation; mop sink. Electrical: 577 devices installed; new lighting in the lobby, corridors, and floors 1 through 3; bathroom lighting on floors 1 through 3; relocate existing heat pumps and fire alarm devices; lighting in garage lobbies ABC and D; selective electrical demolition throughout phases; new exit signs and fire alarm devices per plans and specifications; install compact inverters in electrical rooms for emergency lighting; relocate receptacles for new locations. HVAC: Replace 2 water source heat pump units; replace electrical heaters, registers, and diffusers.

    $1.5M
  • 2016Demolition

    Third Floor - Zone 3B - Corridor - Lobby, restrooms and corridors renovation. State Ed. Fee paid.: $390.00 PLUMB: first floor, second floor., and third floor.: replace 7: water closets, 1 nw: water closet; replace 6 basins, 1 nw: basin; 1 sink replace 2: urinals, 2 new floor-drns.; core bathroom renovation; new ADA bathroom. Installation, mop sink. Electrical: 577 devices installed; new lobby, corridors, 1 thru 3 lighting, bathrooms., 1 thru 3 lighting; relocate existing heat pumps, relocate fire alarm devices, garage lobbies ABC and D lighting, selective electrical. Demo throughout phases, new exit signs, new fire alarm devices per plans and specs; install compact inverters in electrical. Rooms for EM lighting, relocate receptacles for new locations HVAC: replace 2 water soruce heat pump units; replace electrical. Htrs., registers and diffusers.

    $1.5M
  • 2016Renovation

    New lobby entrance. State education fee paid: $26.00. Electrical: 9 devices installed; entryway lighting; 2 in-floor well lights, 5 recessed ceiling fixtures, 2 compact recessed emergency lights, 2 entryway card-access back boxes, empty conduits, and stub-ups for security vendor (by others). Plumbing: Install new linear drain in front of main entrance, Building 1, and tie into existing storm system.

    $100K
  • 2016Demolition

    Zone G-1 - garage Level A - Lobby, restrooms and corridors renovation. State Ed. Fee paid.: $390.00 PLUMB: first floor, second floor., and third floor.: replace 7: water closets, 1 nw: water closet; replace 6 basins, 1 nw: basin; 1 sink replace 2: urinals, 2 new floor-drns.; core bathroom renovation; new ADA bathroom. Installation, mop sink. PLUMB (2): relocate sprinkler heads to accommodate new ceiling systems layout on multiple floors for corridors, bathrooms., and lobby areas. Prints in file BB electrical: 577 devices installed; new lobby, corridors, 1 thru 3 lighting, bathrooms., 1 thru 3 lighting; relocate existing heat pumps, relocate fire alarm devices, garage lobbies ABC and D lighting, selective electrical. Demo throughout phases, new exit signs, new fire alarm devices per plans and specs; install compact inverters in electrical. Rooms for EM lighting, relocate receptacles for new locations HVAC: replace 2 water soruce heat pump units; replace electrical. Htrs., registers and diffusers.

    $1.5M
  • 2016Demolition

    Zone G-2. Garage Level B: lobby, restrooms, and corridors renovation. State education fee paid: $390.00. Plumbing: On the first, second, and third floors, replace 7 water closets and install 1 new water closet; replace 6 basins and install 1 new basin; install 1 sink; replace 2 urinals; and install 2 new floor drains. Core bathroom renovation, new ADA bathroom installation, and mop sink installation. Plumbing (2): Relocate sprinkler heads to accommodate the new ceiling systems layout on multiple floors in corridors, bathrooms, and lobby areas. Prints in file. BB electrical: 577 devices installed; new lighting in the lobby, corridors, floors 1 through 3, and bathrooms on floors 1 through 3; relocate existing heat pumps and fire alarm devices; lighting in garage lobbies A, B, C, and D; selective electrical demolition throughout phases; new exit signs and fire alarm devices per plans and specifications; install compact inverters in electrical rooms for emergency lighting; relocate receptacles for new locations. HVAC: Replace 2 water source heat pump units; replace electrical heaters, registers, and diffusers.

    $1.5M
  • 2016Demolition

    Second floor, Zone 2C: Restrooms, lobby, and corridors renovation. State education fee paid: $390.00. Plumbing on the first, second, and third floors: replace 7 water closets and install 1 new water closet; replace 6 basins and install 1 new basin; 1 sink; replace 2 urinals; install 2 new floor drains; core bathroom renovation; new ADA bathroom installation; mop sink. Electrical: 577 devices installed; new lighting in the lobby, corridors, floors 1 through 3, and bathrooms on floors 1 through 3; relocate existing heat pumps and fire alarm devices; lighting in garage lobbies A, B, C, and D; selective electrical demolition throughout phases; new exit signs and fire alarm devices per plans and specifications; install compact inverters in electrical rooms for emergency lighting; relocate receptacles for new locations. HVAC: replace 2 water source heat pump units; replace electrical heaters, registers, and diffusers.

    $1.5M
  • 2016Demolition

    Second Floor - Zone 2B - Corridor - Lobby, restrooms and corridors renovation. State Ed. Fee paid.: $390.00 PLUMB: first floor, second floor., and third floor.: replace 7: water closets, 1 nw: water closet; replace 6 basins, 1 nw: basin; 1 sink replace 2: urinals, 2 new floor-drns.; core bathroom renovation; new ADA bathroom. Installation, mop sink. Electrical: 577 devices installed; new lobby, corridors, 1 thru 3 lighting, bathrooms., 1 thru 3 lighting; relocate existing heat pumps, relocate fire alarm devices, garage lobbies ABC and D lighting, selective electrical. Demo throughout phases, new exit signs, new fire alarm devices per plans and specs; install compact inverters in electrical. Rooms for EM lighting, relocate receptacles for new locations HVAC: replace 2 water soruce heat pump units; replace electrical. Htrs., registers and diffusers.

    $1.5M
  • 2016Demolition

    Second floor, Zone 2A: corridor and lobby. Renovation of the lobby, restrooms, and corridors. State education fee paid: $390.00. Plumbing on the first, second, and third floors: replace 7 water closets and install 1 new water closet; replace 6 basins and install 1 new basin; install 1 sink; replace 2 urinals; install 2 new floor drains; core bathroom renovation; new ADA bathroom installation; install a mop sink. Electrical: 577 devices installed; new lighting in the lobby, corridors, floors 1 through 3, and bathrooms on floors 1 through 3; relocate existing heat pumps and fire alarm devices; lighting in garage lobbies A, B, C, and D; selective electrical demolition throughout phases; new exit signs and fire alarm devices per plans and specifications; install compact inverters in electrical rooms for emergency lighting; relocate receptacles for new locations. HVAC: replace 2 water source heat pump units; replace electrical heaters, registers, and diffusers.

    $1.5M
  • 2016Demolition

    First Floor - Zone 1D - RestRooms - Lobby, restrooms and corridors renovation. State Ed. Fee paid.: $390.00 PLUMB: first floor, second floor., and third floor.: replace 7: water closets, 1 nw: water closet; replace 6 basins, 1 nw: basin; 1 sink replace 2: urinals, 2 new floor-drns.; core bathroom renovation; new ADA bathroom. Installation, mop sink. Electrical: 577 devices installed; new lobby, corridors, 1 thru 3 lighting, bathrooms., 1 thru 3 lighting; relocate existing heat pumps, relocate fire alarm devices, garage lobbies ABC and D lighting, selective electrical. Demo throughout phases, new exit signs, new fire alarm devices per plans and specs; install compact inverters in electrical. Rooms for EM lighting, relocate receptacles for new locations HVAC: replace 2 water soruce heat pump units; replace electrical. Htrs., registers and diffusers.

    $1.5M
  • 2016Demolition

    First floor, Zone 1C: corridor and lobby. Renovation of the lobby, restrooms, and corridors. State education fee paid: $390.00. Plumbing: On the first, second, and third floors, replace 7 water closets and install 1 new water closet; replace 6 basins and install 1 new basin; install 1 sink; replace 2 urinals; install 2 new floor drains; core bathroom renovation; new ADA bathroom installation; mop sink. Electrical: 577 devices installed; new lighting in the lobby, corridors, floors 1 through 3, bathrooms, and floors 1 through 3; relocate existing heat pumps and fire alarm devices; lighting in garage lobbies A, B, C, and D; selective electrical demolition throughout phases; new exit signs and fire alarm devices per plans and specifications; install compact inverters in electrical rooms for emergency lighting; relocate receptacles for new locations. HVAC: Replace 2 water source heat pump units; replace electrical heaters, registers, and diffusers.

    $1.5M
  • 2016Demolition

    First Floor - Zone 1A - Lobby Lobby, restrooms and corridors renovation. State Ed. Fee paid.: $390.00 PLUMB: first floor, second floor., and third floor.: replace 7: water closets, 1 nw: water closet; replace 6 basins, 1 nw: basin; 1 sink replace 2: urinals, 2 new floor-drns.; core bathroom renovation; new ADA bathroom. Installation, mop sink. Electrical: 577 devices installed; new lobby, corridors, 1 thru 3 lighting, bathrooms., 1 thru 3 lighting; relocate existing heat pumps, relocate fire alarm devices, garage lobbies ABC and D lighting, selective electrical. Demo throughout phases, new exit signs, new fire alarm devices per plans and specs; install compact inverters in electrical. Rooms for EM lighting, relocate receptacles for new locations HVAC: replace 2 water soruce heat pump units; replace electrical. Htrs., registers and diffusers.

    $1.5M
  • 2016Renovation

    Lobby, restrooms, and corridors renovation. State education fee paid: $390.00.

    $1.5M
Satellite view of 1241 King St, Greenwich, CTSatellite view
2016

1241 King St

Greenwich, CT
  • 2016Renovation

    , 2009 IRC. A raised terrace with covered golf cart queuing and golf bag storage underneath, as well as a raised patio between the existing clubhouse and pool area, and a major gut renovation of the existing clubhouse. State education fee paid: $1,170.00.

    $4.5M
  • 2016Electrical

    Lower level: A raised terrace with covered golf cart queuing and golf bag storage underneath, as well as a raised patio between the existing clubhouse and pool area and a major gut renovation of the existing clubhouse. State education fee paid: $1,170.00. Electrical: All electrical wiring for under the foundation of the raised terrace with a covered cart opening, and underneath the golf bag storage.

    $4.5M
  • 2016Electrical

    First-floor dining room and lobby. A raised terrace with covered golf cart queuing and golf bag storage underneath, as well as a raised patio between the existing clubhouse and pool area and a major gut renovation of the existing clubhouse. State education fee paid: $1,170.00. Electrical: all electrical wiring for under the foundation of the raised terrace with a covered cart opening, and underneath the golf bag storage.

    $4.5M
  • 2016Electrical

    A raised terrace with covered golf cart queing and golf bag storage underneath as well as a raised patio between the existing clubhouse and pool area and major gut renovation of the existing clubhouse. State Ed. Fee paid.: $1,170.00 electrical: all electrical. Wiring for under foundation of raised terrace with covered cart opening, and underneath golf bag storage.

  • 2016Electrical

    First-floor pool deck: A raised terrace with covered golf cart queuing and golf bag storage underneath, as well as a raised patio between the existing clubhouse and pool area and a major gut renovation of the existing clubhouse. State education fee paid: $1,170.00. Electrical: All electrical wiring for under the foundation of the raised terrace with covered cart opening, and underneath the golf bag storage.

    $4.5M
  • 2016Electrical

    Rear terrace: A raised terrace with covered golf cart queuing and golf bag storage underneath, as well as a raised patio between the existing clubhouse and pool area and a major gut renovation of the existing clubhouse. State education fee paid: $1,170.00. Electrical: All electrical wiring for under the foundation of the raised terrace with covered cart opening, and underneath the golf bag storage.

    $4.5M
Satellite view of 19 Doubling Rd, Greenwich, CTSatellite view
2016

19 Doubling Rd

Greenwich, CT
  • 2016New Construction

    New construction of a camp skeet building under the 2003 IBC. State education fee paid: $91.00.

    $350K
  • 2016Foundation / Earthwork

    New construction of a Camp Skeet Building under the 2003 IBC. State education fee paid: $91.00.

  • 2016Pool

    New construction of a pool snack bar/changing building. State education fee paid: $312.00.

  • 2016Pool

    Construct inground swimming pool and required safety barrier; fencing/safety devices must comply with state building code State Ed Fee paid $19.50 PER SECT. AG 106.1 CSBC and Sect. 4.3, apsp-7, any pool, spa, or hot tub with a broken, loose or missing suction outlet cover shall be immediately placed out of service until repairs or replacement is completed with an approved outlet cover. In accordance with Section 6.1 of APSP-7 Standard, periodic evaluation, testing and maintenance of cover/grates and suction entrapment avoidance systems [including SRVS devices] and components shall be evaluated, maintained and replaced by a person licensed [CT SPB or SB1 license] in accordance with applicable manufacturer's instructions and CT State codes.

    $75K
  • 2016New Construction

    New construction of a pool snack bar/changing building. State education fee paid: $312.00. Amendment #1 dated 11.14.17: $40 fee for deleting the elevator on the permit.

    $1.2M
  • 2016Renovation

    Addition and remodel of camp/changing (pro shop) building; Add wall in Women's changing/restrooms; Addition of exterior covered pavillions. State Ed. Fee paid.$10.40 Amend #1: 10.13.17 fee $40 work was not done; 2 showers and one drinking fountain.

    $40K
Satellite view of 1 2 Greenwich Plz, Greenwich, CTSatellite view
2016

1 2 Greenwich Plz

Greenwich, CT
  • 2016Renovation

    Installation of electronic turnstiles (open lane) at 1 and 2 Greenwich Plaza; additional exit signs and door modifications at the ground floor lobby of 2 Greenwich Plaza. State education fee paid: $7.80. Electrical: install hallway interior renovations, exit lights, and low voltage for doors and lights in hallways. Plumbing: install fire sprinkler piping and heads per NFPA 13 standards.

    $30K
Satellite view of 61 Woodside Dr, Greenwich, CTSatellite view
2016

61 Woodside Dr

Greenwich, CT
  • 2016New Construction

    New construction of a paddle tennis hut and 4 new paddle tennis courts. State education fee paid: $299.00. Amendment #1 dated 4.7.17: $40 fee; change basement to a crawl space, refurbishment, and add a new paddle tennis court.

    $1.2M
  • 2016Renovation

    Addition and remodel of pool house building – snack bar. State education fee paid: $140.40.

    $540K
  • 2016Foundation / Earthwork

    New construction of a Paddle Tennis Hut and 4 Paddle Tennis Courts. State education fee paid: $299.00. Amendment #1: On 4.7.17, fee $40; change basement to a crawl space, refurbishment, and add a new paddle tennis court.

Satellite view of 2 Railroad Ave, Greenwich, CTSatellite view
2016

2 Railroad Ave

Greenwich, CT
  • 2016Renovation

    Lessee: AQR Capital. Complete interior fit-out on the third floor. State education fee paid: $33.10. HVAC: Furnish and install 4 VAV units, sheet metal ductwork, air outlets, and DDC controls (no outdoor equipment). Electrical: 96 devices installed. Building #1, third floor: complete interior office renovation, lighting, power, and data. Plumbing: Relocate sprinkler heads to accommodate the new RCP layout.

    $135K