Gregg Verses
Unknown
Permit Cooccurrence Statewide V1 · through 2026Local provider profile
Documented work across Connecticut based on attributed municipal records.
Verified relationships
Relationships appear only when supported by an identified source; they do not imply endorsement or current employment.
Unknown
Permit Cooccurrence Statewide V1 · through 2026Contact information
These details have not necessarily been claimed or independently confirmed by the provider.
Work history
Individual records are grouped by address. Totals include only values reported in public records and may not equal final construction cost.
Commercial tenant fit-up.
$1.3MMixed Use Building.
$10.8MConvert the existing office building into a place of worship.
$275KFoundation.
$3.2MAccessory Structure.
$195KBusiness Building.
$4.3MFoundation.
$500KMixed Use Building.
$1.5MFoundation.
$171KMixed Use Building.
$9.6MFoundation.
$1.3MTenant fit-out for "BIO WAVE" office and light manufacturing.
$575KMixed Use Building.
$14.8MCommercial additions and alterations.
Mixed Use Building.
$15.9MMixed Use Building.
$9.7MTenant fit-up on the plaza level for new tenant “seimens.”
$174KTenant fit-up for "Energy USA" (fourth-floor partial).
$165KIn fill of spiral staircase rom 5th to 6th floor.
$34KInterior work on the fifth-floor elevator lobby and corridor.
$343KPlaza level demo and create vanilla box.
$40K5th floor demolition and create vanilla box.
$200K6th floor demo and create vanilla box.
$200KNew dumpers enclosure at existing loading docks #401 and #501.
$40KInstall supplemental steam beam and metal deck, and pour concrete.
$10KConstruction of a new 40,112 Square Ft Warehouse, Use Group S-1.
$6MMixed Use Building.
$6MRelocate and install a 30 kW generator in the parking garage.
$52.8KTenant fit out for “Reeds” – partial demo of penthouse level, demising wall, office, conference room, pantry.
$483KNew dumpster enclosure at existing loading docks.
Tenant fit-up for “Smart Equip”.
$180KTenant fit up for "Toluna" - 6th floor; E21-1184-Ele No Fee: wiring for Tenant "Toluna" 6th floor; H21-0909-Mech No Fee: mechanical for tenant "Toluna"; H21-0927-Mech No Fee: Demolish existing duct and relocate existing VAVs to match new floor layout, provide new RGD's, provide new fire dampers in demising wall, provide transfers and relocate TStats; E21-1316-Ele Alt Comm: Install 58 voice/data locations; P22-0012-plumbing No Fee: Relocate plumbing for new pantry sink location with pump; P22-0013-plumbing Alt Comm: Relocate sprinkler heads in Toluna fit out to accommodate new walls and ceiling layout.
$200KMixed Use Building.
$6.9MFoundation.
$19.9MInterior demo only- future permit required – third floor.
$72.1KInterior renovation to plaza bathrooms.
$82.5KInterior renovation at the fourth-floor lobby corridor.
$206KInterior renovations to second floor “Mesta Board Americas Corporation” – conference rooms, board room, community center with pantry.
$750KDemo existing interior walls on fourth floor – remove flooring.
$235KRenovate the existing fitness center and meeting hall.
$230KTenant fit-up for “Heartwood Partners.”
$35KInstallation of New Swimming Pool.
$250KInstall 5 new passenger elevators 3500lb capacity.
$1MTower crane installation.
$300KThe project is a 13,240 SF 3-story parking garage with a green roof that connects to the existing parking garage of the building on 70 Forest St. The building will be 1 story below ground and 2 above ground. Built with cast-in-place concrete, clad with masonry. The garage will have 28 parking spaces.
$600KHVAC Work
Electrical Work
Commercial tenant fit-up.
$14KTenant fit-up for retail/cigar shop “Cigar Galaxy.”
$15KCommercial tenant fit-up.
$525KCommercial tenant fit-up.
$171KMixed Use Building.
$18.4MFoundation.
$3MMixed Use Building.
$9.1MFirst-floor interior tenant fit-up, 6,100 SF.
$950KInterior renovation for 601 Merritt 7, second-floor lobby and corridor.
$230KInterior renovation for 601 Merritt 7 – second-floor restroom.
$175KPartial interior demo on second floor.
$245KWall construction and modification to the existing loading dock.
$65.5KInterior Alteration -Elevator Lobby-first floor.
$100KFirst-floor bathroom renovation.
$100KCreate 2 vanilla boxes on first floor.
$270KGrease trap room for cafeteria located on P-1.
$45KInterior renovation on main plaza level – renovate and expand within existing footprint in cafeteria, new condensing unit on garage level.
$1.3MInterior tenant fit-up on the first floor and mezzanine, 34132 SF.
$980KInterior renovation of an existing warehouse and construction of ADA bathrooms and a showroom (Building 1).
$351KTenant fit-up for “Mr Shower Door.”
$487KInstall a new swimming pool measuring 75 ft x 25 ft.
$338KAmenity and lobby fit-up for True North Multi-Family Building, floors 1 and 10.
$1.8MTenant fit up for Life Time Fitness and exterior showers.
$8.3MInterior renovation, including new demising walls and ADA bathrooms, at “Little Green, ” located on the lower level in units 103B and 104. Updated 5.22.23-MK.
$365KCommercial tenant fit-up.
$10KCommercial tenant fit-up.
$10KCommercial tenant fit-up.
$10KCommercial tenant fit-up.
$10KCommercial tenant fit-up.
$348KMixed Use Building.
$8.1MFoundation.
$2.9MCommercial tenant fit-up.
$10KCommercial tenant fit-up.
$10KMixed Use Building.
$4.9MFoundation.
$1.7MCommercial tenant fit-up.
$15KCommercial tenant fit-up.
$35KTenant fit out - - 4000 SF office space-"STG".
$500K16,000 square feet of vanilla box on the ground floor and add a demising wall per plan, also known as 77 North Water.
$60KTenant fit-up for “Jonesly Mixed Martial Arts Academy.”
$100KCommercial tenant fit-up.
$500KBuilding
$22MRaise a portion of the roof 4.9 feet in line with the existing walls. Work area: 687.5 SF.
$20KNew prefabricated industrial building, including new bathrooms and elevators. Mezzanine revision amendment to Phase 2: mezzanine area to be increased by 4,430 SF. No change in building footprint or coverage.
$8.6MGarden center addition; E22-0564-Ele No Fee: S and I 55 plugs, 20 floor plugs, 3 switches, 3 sensors, 28 light fixtures, 1 FA control panel, 3 pull stations, 4 horn strobes, 1 smoke detector, 5 data stubs, 2 WAP's, replace 600A panel, install new 60A panel, wire only infared heaters, air curtains and exhaust fans; P22-0338-plumbing Alt Comm: Design and install new sprinkler system for proposed garden center with new piping into existing mains inside the building.
$1.5MInstallation of Hoist.
$90KCommercial tenant fit-up.
$25KCommercial additions and alterations.
$26KInterior fit out to create office space and storage area on lower level.
$425KMixed Use Building.
$2MFoundation.
$485KInterior demolition of existing apartments and the existing floor slab; selective demolition of the existing first-floor façade; excavation and installation of micro piles and pile caps; reinstallation of the floor slab; and modifications to existing MEPs as required for this work. This permit does not include rebuilding the existing apartments.
$4MOffice expansion tenant “Tri-Rx Pharmaceuticals”; E21-0813-Ele No Fee: Electrical for office expansion, Tri-Rx Pharmaceuticals.
$50K