9 8 2026
Trumbull, CTArchitectural demolition and shingles to manufacturer specifications. Remove existing power distribution units, switchboard, and feeders.
$24.1KLocal provider profile
Documented work across Connecticut based on attributed municipal records.
Work history
Individual records are grouped by address. Totals include only values reported in public records and may not equal final construction cost.
Architectural demolition and shingles to manufacturer specifications. Remove existing power distribution units, switchboard, and feeders.
$24.1KManufacturer INSTALL 500 specifications. Underground liquid propane TANK AND RUN GAS LINE TO POOL HEATER-TRENCHING BY.
$19.5KRelated debris.
$15KRe-Roof.
$25KRe-Roof.
$20KAlteration
$16.1KRemove and replace 44 squares asphalt shingles.
$36KRe-Roof.
$20KConstruct 3 false dormers - exist. single-family residence - remove and re-roof, install new vinyl siding, (1(replacement window and 2 patio doors.
$40KBuilding
$19KStrip and reroof 32 squares.
$8.3KStrip and replace siding.
$15.8K