· selective demolition of existing interior partitions, finishes, and fixtures, as indicated on the plans.· removal of existing kitchen and bathroom fixtures and finishes.· remove existing spiral stair located at master bedroom connecting to mezzanine above· renovation of the existing powder room adjacent to the garage, including relocation of the laundry area; the existing laundry space will be converted into a mudroom.· kitchen renovation, including removal of the existing wall between the kitchen and dining room to create an open-concept layout connecting both spaces.· installation of new kitchen cabinets and appliances.· installation of one 1 new window in the renovated master bathroom, along with new interior doors as indicated on the plans.· relocation of the laundry room in accordance with the proposed plans.
Interior renovation of existing detached cottage - interior new layout, new kitchen, full bathroom, laundry closet, bedroom, update electric, plumbing, heat and hot water.
Renovate the entire interior, changing from 4 to 5 bedrooms; remove a deck/bump-out; replace and relocate the stairway; change and/or relocate windows; and repair the roof and siding. Approximately 1100 s.f. 1 AC condenser.
Construct a full bathroom in a section of the unfinished basement to service the finished area of the basement at 377 Sylvan Knoll Road. Add a sewage ejector pump for waste and a sump pump under the basement slab for groundwater.
Kitchen renovation, including enlarging the opening to the dining room (approximately 400 SF). Replace windows. Replace the deck (approximately 300 SF). Add a front porch with a covered roof (approximately 225 SF).
Convert the unfinished attic to livable space with storage rooms, an office, a gym, and a full bathroom. Construct a dormer to create additional space. Extend plumbing, electrical, and HVAC systems to serve the new livable space. Insulate the new space.
Kitchen renovation with new cabinets and upgraded plumbing and electrical fixtures. Reinforce kitchen floor joists via a footing and knee wall in the basement.
Interior renovations to a single-family residence, converting the garage into living space. E22-0158-Ele No Fee: Wiring of the family room—330 square feet of garage converted to a family room. H22-0186-Mech No Fee: Add a zone to the existing furnace; ductwork only, no equipment.
Interior renovations to single-family residence - reconfigure/expand stairs, structural repairs to ceiling - add beams; E21-0094-Ele No Fee: Furnish and install 10 recessed lights after switching as required.
Convert the unfinished lower level to finished, livable space, including installation of a wet bar and cabinets, conversion of the existing half bathroom to a full bathroom, and a bedroom and family room area. Half of the lower level is already finished and livable.
Construct a full bathroom in the legal, finished area of the walkout basement. No window; the fan will vent outside. Approximately 48 SF. This project will also require electrical and plumbing permits.