2019
69 Lantern Cir
Stamford, CT- 2019Renovation
Renovate the second-floor master bath. Remove the existing tile floor and tile bathtub surround, repair underlying damage, and replace the tile floor.
$11.6K
Local provider profile
Documented work across Connecticut based on attributed municipal records.
Contact information
These details have not necessarily been claimed or independently confirmed by the provider.
No contact information was found in the available records.
Work history
Individual records are grouped by address. Totals include only values reported in public records and may not equal final construction cost.
Renovate the second-floor master bath. Remove the existing tile floor and tile bathtub surround, repair underlying damage, and replace the tile floor.
$11.6KCreate library cafe @ Norwalk Public Library" - "Blue Teapot LLC".
$5K