2024
3 25 2024 Trumbull
Trumbull, CT- 2024Permit$45K
Local provider profile
Documented work across Connecticut based on attributed municipal records.
Contact information
These details have not necessarily been claimed or independently confirmed by the provider.
No contact information was found in the available records.
Work history
Individual records are grouped by address. Totals include only values reported in public records and may not equal final construction cost.
Replace rooftop units, phase 1, on Town Hall.
$103KReplace the existing domestic hot water heater with 2 Turbo Max Tios indirect HWHs.
$50KGas to gas boiler replacement install 2 lochinvair boilers d/v 90+.
$150KReplace 50-ton air conditioning, cooling, and heating coils per engineered specs for Trumbull Library.
$78K