53 Woolsley Ave
Trumbull, CT- 2021Plumbing
Run a gas line to a new D/V boiler.
$1.2K - 2021Mechanical
Oil-to-gas conversion for a D/V combi boiler.
$11.4K
Local provider profile
Documented work across Connecticut based on attributed municipal records.
Contact information
These details have not necessarily been claimed or independently confirmed by the provider.
No contact information was found in the available records.
Work history
Individual records are grouped by address. Totals include only values reported in public records and may not equal final construction cost.
Run a gas line to a new D/V boiler.
$1.2KOil-to-gas conversion for a D/V combi boiler.
$11.4KRun a gas line to a new boiler.
$1.1KOil to gas conversion combi boiler d/v.
$8.6KPlumbing for 2 baths, 5 exam sinks, 2 breakrm sinks, i electric hwh.
$30KRun gas line to new boiler, install 40 gallon powervent hwh.
$3.9KOil to gas conversion boiler d/v 90+.
$9.9KReplace boiler with new high efficiency d/v.
$7.7KRough-in for a new bathroom in the basement and run a new gas line for the dryer.
$5KOil to gas conversion boiler d/v combi.
$8KOil-to-gas conversion with a new IBC combi boiler. Gas line by others.
$7KBathroom addition first floor.
$3KRough in 7, trim 2 full bathrooms with a pump in the basement.
$6KRough in and trim out a new bathroom.
$3KRough in and trim out 2 full baths first floor, 1- in basement, kit renovation.
$12KRun gas line for FP.
$1KPlumbing for half bathroom in basement (existing).
$1.5KPlumbing 2 baths mstr and hall (existing).
$6KKitchen sink, ice maker, and dishwasher (existing).
$1.5KInstall new peerless propane boiler 90+ with indirect, new liner, gas line by other.
$8.5KChanging an oil boiler to a gas boiler combo unit, 90+.
$8.8KInstall black pipe for natural gas conversion from oil.
$1KInstall a gas line to the new boiler from the new gas service. Bond per code.
$1KRemove and replace gas boiler 90+ dv hot water on demand oil to gas conversion.
$7K