Install wiring for new HVAC equipment/boiler in the penthouse. Run conduit with control wiring to shut down rooftop units when the generator is activated. See HVAC Permit 19-2811.
$20K
View all 2 jobs +
2019Electrical
Install wiring for new HVAC equipment/boiler in the penthouse. Run conduit with control wiring to shut down rooftop units when the generator is activated. See HVAC Permit 19-2811.
$20K
2018Electrical
10 devices installed; replace 9 bollard lights, replace 1 pole light, and replace existing cable with new PVC conduit and wire.
106 devices installed; supply/install 18 new light fixtures; 33 new receptacles, 4 new exit signs, 13 new lighting controls; 38 back box and conduit for tele/data; work is for partial renovations to be performed to 3rd and 4th floors.
View all 2 jobs +
2019Electrical
106 devices installed; supply/install 18 new light fixtures; 33 new receptacles, 4 new exit signs, 13 new lighting controls; 38 back box and conduit for tele/data; work is for partial renovations to be performed to 3rd and 4th floors.
2018Electrical
5 devices installed: 1 150 kVA transformer, 1 400-amp, 3-phase, 480-volt panel, and 1 400-amp, 3-phase, 208-volt panel. Install 2 car chargers.
70 devices installed in the new management office: 29 new lighting devices, 21 new receptacles, 4 new switches, 3 new exit signs, 3 new fire alarm devices, and back box and conduit only for 10 tele/data devices.
View all 2 jobs +
2019Electrical
70 devices installed in the new management office: 29 new lighting devices, 21 new receptacles, 4 new switches, 3 new exit signs, 3 new fire alarm devices, and back box and conduit only for 10 tele/data devices.
2016Electrical
33 devices installed; relocate existing 2 x 2 lightig (4); install new undercabinet lighting (2), install new ceiling occupancy sensors (13), relocate exit. Lt switches (2); install new light switches (3), relocate 2 existing receptacles, install 7 new receptacles.
125 kW generator plumbing: Gas piping to generator. Receipt 19-0941 for $96 paid.
$30K
View all 4 jobs +
2019Electrical
125 kW generator plumbing: Gas piping to generator. Receipt 19-0941 for $96 paid.
$30K
2018Electrical
312 devices installed; install 74 new receptacles, 50 new lighting, 33 new lt switches, relocate 38 exist. lighting; install new back box conduit for tele/data (68); install new 20 fire alarm devices, wire 23 new hvac equipment; install 2 new 30 kva and 45 kva transformers; install new 120/208 electrical. Panels (5).
2018Demolition
2 devices installed; interior demolition and safe-off for new demising wall; relocate existing lighting controls.
2015Electrical
246 devices installed; insterior offc renovation first floor. (Mercuria); install new lighting switches (25); install newreceptacles (60); new lighting fixtures (140), new electrical. Panel (1), install new fire alarm devices 20 2011 NEC.
61 devices installed. Interior renovation to the third-floor corridor and Bathrooms: 25 new lighting fixtures, 12 new receptacles, 9 new fire alarm devices, relocation of 2 existing fire alarm devices, and installation of 12 new lighting switches. Install back box and conduit for card readers.
View all 2 jobs +
2018Electrical
61 devices installed. Interior renovation to the third-floor corridor and Bathrooms: 25 new lighting fixtures, 12 new receptacles, 9 new fire alarm devices, relocation of 2 existing fire alarm devices, and installation of 12 new lighting switches. Install back box and conduit for card readers.
2018Demolition
4 devices installed; third floor. Demolition: disconnect and make safe all lighting; disconnect and make safe all receptacles; remove all unused cabling from the ceiling; install 2 temporary lights; install 2 temporary GFI receptacles.
27 devices installed: 10 new lighting devices, 2 new exit signs, 4 lighting controls, 4 GFI receptacles, and 7 fire alarm devices.
View all 2 jobs +
2018Electrical
27 devices installed: 10 new lighting devices, 2 new exit signs, 4 lighting controls, 4 GFI receptacles, and 7 fire alarm devices.
2018Electrical
174 devices installed; install 51 new receptacles and 65 new lighting devices; wire only 8 new HVAC equipment units; provide back boxes and conduit stubs for 25 tele/data devices; install 25 new F/A devices.
748 devices installed; renovate interior of building: relocate existing 2 x 2 lighting, basement 1st and wnd floors.; new 2 x 2 lighting and controls basement, 1st and 2nd floors.; 195 new receptcales basement, 1st and 2nd floors.; 70 new exit signs and EM lighting basement 1st and 2nd floors.; 53 new fire alarm devices; rewire existing tele/data, 1 relocate existing electrical. Panel; l 1 relocate existing lighting control panel; 15 wire for new hvac equipment (A/H, dampers, heat pump etc.). 800-amp existing service.
1143 devices installed; 357 new lighting, 250 new receptacles, new 100 kW UPS (1); new 112.5 KVA transformer (2); install new electrical. Panels (13); wire only of new hvac equipment(63); new fire alarm devices (35); only conduit and back box for tele/data (200); new exit signs (17); install new lighting switches (205). Amendment (12/31/18): audio/visual wiring and installation (fourth floor).
View all 2 jobs +
2017Electrical
1143 devices installed; 357 new lighting, 250 new receptacles, new 100 kW UPS (1); new 112.5 KVA transformer (2); install new electrical. Panels (13); wire only of new hvac equipment(63); new fire alarm devices (35); only conduit and back box for tele/data (200); new exit signs (17); install new lighting switches (205). Amendment (12/31/18): audio/visual wiring and installation (fourth floor).
2017Electrical
14 devices installed; relocate existing 2-by-2-foot lights (4); relocate existing light switch (1); install 1 new light switch; supply and install new quad receptacles (4), and 4 back boxes and conduit for data.
126 devices installed; supply and install 25 new light fixtures, 14 new light switches, 55 new receptacles, 30 back boxes and conduit stubs, relocate 10 existing fire alarm devices, and supply and install 2 new fire alarm devices.
42 devices installed; demolition of all electrical wiring and equipment on the 1st and 4th floors. Supply and install 10 temporary power units on the 1st and 4th floors; 24 temporary lighting units on the 1st and 4th floors; and 4 temporary exit signs on the 1st and 4th floors. Demolition of all fire alarm wiring and devices; supply and install 4 temporary audio/visual devices for fire protection during demolition of space.
View all 2 jobs +
2017Demolition
42 devices installed; demolition of all electrical wiring and equipment on the 1st and 4th floors. Supply and install 10 temporary power units on the 1st and 4th floors; 24 temporary lighting units on the 1st and 4th floors; and 4 temporary exit signs on the 1st and 4th floors. Demolition of all fire alarm wiring and devices; supply and install 4 temporary audio/visual devices for fire protection during demolition of space.
2017Electrical
10 devices installed: 2 wall-mounted lights, 2 wall switches, 2 duplex receptacles, a new back box and conduit for data, relocation of 1 existing light fixture, and a back box and conduit for 1 card reader.
267 devices installed; interior alteration; install new lighting (155), new receptacles (80), and new furniture power feeds (10); 1 new electric water heater; 1 new air conditioning unit; 30 new light switches.
140 devices installed; install new lighting in the lower level (71), 5 new exit signs in the lower level, 8 new lighting switches in the lower level, 35 new receptacles in the lower level, 3 new furniture power poles, 8 back boxes and conduit only for data, 3 new smoke detectors, 6 new audio/visual devices, and 1 new visual-only device.
View all 2 jobs +
2016Electrical
140 devices installed; install new lighting in the lower level (71), 5 new exit signs in the lower level, 8 new lighting switches in the lower level, 35 new receptacles in the lower level, 3 new furniture power poles, 8 back boxes and conduit only for data, 3 new smoke detectors, 6 new audio/visual devices, and 1 new visual-only device.
2015Electrical
2 devices installed; temporary 200-amp services; install 2 GFI receptacles for temporary service. Existing 800 a service. Amendment (10/27/16): 1600-amp service. 280 devices installed; install new electrical service, new distribution electrical panels (4), new lighting (104), new receptacles (95), new HVAC equipment wire only; new elevator wire only; new plumbing equipment wire only; new fire alarm system (1), new lighting switches (55), and new fire alarm devices (21).
285 devices installed; 400-amp service; install new fire alarm panel and devices, install new lighting (200), install new receptacles (50), install new switches (25), wire only new electrical. Wtr. Htr. (1), wire only new gas-fired furnace (3), wire only new air conditioning units (3), install new electrical. Panels (3).
390 devices installed; 600-amp service, as per electrical drawings. Power, lighting, fire alarm system, and lightning protection system. Amendment (7/10/17): 400-amp service; fire pump service.