3 29 2024
Trumbull, CT- 2024Electrical
Relocated. Install new 225a 3phase 4 wire 208/120 42 cir panel.
$15K
Local provider profile
Documented work across Connecticut based on attributed municipal records.
Contact information
These details have not necessarily been claimed or independently confirmed by the provider.
No contact information was found in the available records.
Work history
Individual records are grouped by address. Totals include only values reported in public records and may not equal final construction cost.
Relocated. Install new 225a 3phase 4 wire 208/120 42 cir panel.
$15KRelocate and install new high- and low-voltage wiring to interior menu boards and the front counter; relocate wiring to the new hood and grill location; and relocate high- and low-voltage wiring to kitchen equipment to accommodate kitchen alterations.
$16KElectrical - alterations - "McDonald's" - roof design, bathroom renovations, vestibule and dining room.
$12KRelocate high/low voltage wiring to new location of d/t lane 1, install high/low voltage wiring underground o new d/t location lane 2; all work according to plans.
$7KInstall new and relocate high/low voltage wiring in kitchen area, install new LED light fixtures, install new 225A 35 panel, all work according to plans.
$20KRework lighting in the ceiling over the front counter, relocate kiosks, and wire new registers using existing feeds.
$4KElectrical: Replace existing fixtures in the dining room, bathroom, and service counter with LED fixtures. Install new wiring to exterior menu boards.
$18KRework lighting in the ceiling over the front counter, wire new registers using existing feeds, and relocate kitchen appliances on the counter wall.
$4KElectrical work as per engineered drawings on file.
$20KInterior remodeling with new LED light fixtures in the restrooms and dining area; wire kiosks and relocate wiring to the register according to plans on file.
$50KAs per drawing on file; dining room new LED, fix, bathrooms, and wall units.
70 kW generator HVAC: Gas line to generator. Receipt 17-2492 for $40 paid.
$34K75 devices installed; upgrade service to 600-amp.