1 Newman Ct
Greenwich, CTEL2
$1KLocal provider profile
Documented work across Connecticut based on attributed municipal records.
Work history
Individual records are grouped by address. Totals include only values reported in public records and may not equal final construction cost.
EL2
$1KHVAC
$4.6KGenerator
$30KGenerator
$30KRoax of data, phone, and other voltage wiring for the security and fire system.
Removal of interior finishes, electrical, plumbing, and mechanical equipment, and construction of temporary walls. State education fee: $65.
$250KRemoval of interior finishes, electrical, plumbing, and mechanical equipment, and construction of temporary walls. State education fee: $65.
$250KSenior Center: Replace existing switchgear in the basement with new switchgear. A new service connection is also to be provided. 800-amp service. Journal voucher.
$1KBasement: 7 new water closets, sinks, 1 new urinal, and 3 new floor drains; install new hot and cold water lines and fixtures in the renovated men’s and ladies’ rooms on the ground floor of the Senior Center.
Install 2 new horizontal direct drive air handlers units in renovated lavatories on the ground floor of Senior Center.
Greenwich Senior Center Demo of existing Men's restroom and office space. Construction of new Men's and Women's restroom. State Ed. Fee paid.: $. 78 HVAC: install 2 new horizontal direct drive air handlers units in renovated lavs. On ground floor. Of Senior Center electrical: 20 devices installed; install new lighting and electrical in new renovated Men's and Ladies' lavatory on basement level of Senior Center PLUMB: basement: 7 nw: water closets, sinks, 1 nw: urinal, 3 nw: floor-drns.; install new hot and cold waterlines, fixtures in renovated Mens and Ladies Rooms of Ground floor. Senior Center.
$3K20 devices installed; install new lighting and electrical in the renovated men's and ladies' lavatories on the basement level of the Senior Center.
30 devices installed; construct offices, a waiting room, and an activity room.
70 devices installed; renovate the police pistol range on the second floor. Install new lights and outlets on the classroom side and new lighting strobes, speakers, and outlets on the range side. Amendment (11/10/20): change of service from 400 to 600 amps.; 2 existing meters).
Telephone Room: 1 device installed; install new 3 phase, 208 v, 4 w and G, 90-amp feed from existing panel in ground flood electrical room to new disconnect to telephone room; install new 3 phase 208 v. 4w and g 70-amp service form new disconnect to exist. panel in telephone room; install new 3 phase se 208 volt, 4 w and 6 70-amp feed from new disconnect to existing computer room panel with electrical. Room.
$3KTelephone Room: 1 device installed; install new 3 phase, 208 v, 4 w and G, 90-amp feed from existing panel in ground flood electrical room to new disconnect to telephone room; install new 3 phase 208 v. 4w and g 70-amp service form new disconnect to exist. panel in telephone room; install new 3 phase se 208 volt, 4 w and 6 70-amp feed from new disconnect to existing computer room panel with electrical. Room.
$3KDepartment of Public Works: Remove the existing AERCO gas-fired boiler and install a new one. Rework the gas line and vent from the existing location to the new unit. Location: ground-floor boiler room, Town Hall.
Run 2 new 3 phase 50-amp circuits from electrical. Room ground floor. Town hall to new compressor located outside IT; run 2 new 3 phase 20-amp circuits from electrical. Room gorund floor. Town hall and new air conditioning units located inside IT.
$3KInstall 2 new 10-ton air conditioning units in the IT Department on the ground floor of Town Hall. Compressors are to be located outside Town Hall (outside IT).
$3KZONE 4 - Renovation of DPW office area located on second floor of Town Hall. State Ed. Fee paid.: $. 78.
$3KRenovation of the Department of Public Works office area on the second floor of Town Hall. State education fee paid: $. 78. Electrical: 225 devices installed; renovation of Department of Public Works offices on the second floor of Town Hall, including outlets, lights, and switches. Plumbing: On the second floor, relocate 1 sink in the Department of Public Works from one wall 5 ft. To a new wall.
$3KZONE 0 - Renovation of DPW office area located on second floor of Town Hall. State Ed. Fee paid.: $. 78.
$3KZONE 1 - Admin. Wing - Renovation of DPW office area located on second floor of Town Hall. State Ed. Fee paid.: $. 78.
$3K225 devices installed; renovation of the Department of Public Works offices on the second floor of Town Hall, including outlets, lights, and switches.
ZONE 2 - Renovation of DPW office area located on second floor of Town Hall. State Ed. Fee paid.: $. 78.
$3KZONE 3 - Renovation of DPW office area located on second floor of Town Hall. State Ed. Fee paid.: $. 78.
$3KSecond floor: Relocate 1 sink in DPW from one wall 5 ft. To a new wall.
200+ devices installed; numerous electrical outlets, lights, and switches in the Social Services Department in Town Hall.
Third floor: new sink in the Human Services Department, Town Hall.
Install electrical feed for radio backup system; 60-amp 120/240 feed to Lineset battery backup; 60-amp Feed from Liebert to subpanel with radio room; 30-amp 120/2 kW room basement to air conditioning units with radio room.
$1KInstall electrical feed for radio backup system; 60-amp 120/240 feed to Lineset battery backup; 60-amp Feed from Liebert to subpanel with radio room; 30-amp 120/2 kW room basement to air conditioning units with radio room.
$1KInstall 2 2-ton air conditioning units located in the radio room on the second floor of the fire station.
$1KInstall 70 ft. Of underground gasoline pipe from 500-gallon AT to clock sump. Emergency work.
New construction of a lavatory building at Grass Island. State education fee paid: $369.25. Electrical: 25 devices installed; electrical wiring for public bathrooms at Grass Island, underground only (400 proposed amps). Plumbing, First floor: 5 new water closets, 4 new basins, 3 new floor drains, 1 new sink, urinal, and hose bib. Underground.
New construction of a lavatory building at Grass Island. State education fee paid: $369.25. Electrical: 25 devices installed; electrical wiring for public bathrooms at Grass Island, underground only (400 proposed amps). Plumbing, First floor: 5 new water closets, 4 new basins, 3 new floor drains, 1 new sink, urinal, and hose bib. Underground.
2005 CSBC [2003 IBC] – New construction of a lavatory building at Grass Island. State education fee paid: $369.25. Plumbing: First floor: 5 new water closets, 4 new basins, 3 new floor drains, 1 new sink, urinal, and hose bib. Underground. Amendment (7/3/17): First floor: 5 new water closets, 4 new sinks, 3 new floor drains, 1 new hose bib, urinal, drink fountain, and basin. Electrical: 25 devices installed; electrical wiring for public bathrooms at Grass Island, underground only (400 proposed amps). Amendment (7/14/17): 400-amp service, 3 om; 25 devices installed; wire for public bathrooms.
$1.4MGolf Course Clubhouse Kitchen: Run power to the new hood, kitchen hood, exhaust fan, and convenience outlets; install a disconnect for the new air makeup unit. All wiring inside will be surface mounted.
Golf Course Clubhouse Kitchen: Run power to the new hood, kitchen hood, exhaust fan, and convenience outlets; install a disconnect for the new air makeup unit. All wiring inside will be surface mounted.
Golf Course Clubhouse Kitchen: Run a new gas line from the propane tank along the exterior of the building to the new air makeup unit, then into the building to flexible hose connections for equipment under the new hood.
Re: Fairways @ Griff Golf Course. Installation of a new exhaust hood for the kitchen in the clubhouse. State Ed. Fee paid: $5.20. Electrical: Golf Course Clubhouse kitchen; run power to new hood, kitchen hood, exhaust fan, convenience outlets, and disconnect for new air makeup unit. All wiring inside will be surface mounted. Plumbing: Golf Course Clubhouse kitchen; run new gas line from propane tank along exterior of building to new air makeup unit and into the building to flexible hose connections for equipment under the new hood.
$20KZONE Z2 - Main Pool Building Concession Only. New Construction of a New Concession, Locker building, filter building and gate house. State Ed. Fee paid.: $952.38 electrical: wire 9 1 x 4 lights, 2 panels, 1 transformer, 1 gas hot wtr. Htr., 1 makeup air system, 12 kitchen equipment, 1 plugs, 1 kitchen exhaust. Fan, 1 soda dispenser, freezer, frig. Ice machine PLUMB: trenching and installation of new gas line connected to existing service and running to gas meter located on new main pool building PLUMB (2): 6 floor drains, 4 gas appliance units, 1 gas hot water heater, 2 toilets, 2 basins, (Main Concession Building) PLUMB (2): trenching and installation of new 8" water line from aquarion main on ritch ave.; includes new 8 x 8 T with new 8" gme valve and thrust block; new water main into park will connect new filter building and new main pool building; the lines run thru new water meters and to new bace flow preventers located in each building electrical: trench and install new electrical line form existing pole on Ritch Ave. To new utility pad mounted transformer; from there to new meter mounted on filter building and to 2 new meters mounted on new main pool building; also include trenching and installation of all electrical feed from new filter building to the sewer pump station, and one from the main pool building to ticket booth.
$3.7MZONE Z2 - Main Pool Building Concession Only. New Construction of a New Concession, Locker building, filter building and gate house. State Ed. Fee paid.: $952.38 electrical: wire 9 1 x 4 lights, 2 panels, 1 transformer, 1 gas hot wtr. Htr., 1 makeup air system, 12 kitchen equipment, 1 plugs, 1 kitchen exhaust. Fan, 1 soda dispenser, freezer, frig. Ice machine PLUMB: trenching and installation of new gas line connected to existing service and running to gas meter located on new main pool building PLUMB (2): 6 floor drains, 4 gas appliance units, 1 gas hot water heater, 2 toilets, 2 basins, (Main Concession Building) PLUMB (2): trenching and installation of new 8" water line from aquarion main on ritch ave.; includes new 8 x 8 T with new 8" gme valve and thrust block; new water main into park will connect new filter building and new main pool building; the lines run thru new water meters and to new bace flow preventers located in each building electrical: trench and install new electrical line form existing pole on Ritch Ave. To new utility pad mounted transformer; from there to new meter mounted on filter building and to 2 new meters mounted on new main pool building; also include trenching and installation of all electrical feed from new filter building to the sewer pump station, and one from the main pool building to ticket booth.
$3.7MNew construction of a new concession, locker building, filter building, and gate house. State education fee paid: $952.38.
Zone Z3A – Main pool construction. Construct inground swimming pool and required safety barrier. Fencing and safety devices must comply with the State Building Code. State education fee paid: $403.78.
$1.6MZone Z2C. Wading pool filter equipment in filter building. Construct inground swimming pool and required safety barrier. Fencing and safety devices must comply with the State Building Code. State education fee paid: $403.78.
$1.6MZONE 18 - Elect underground Junction to Ticket Booth - New Construction of a New Concession, Locker building, filter building and gate house. State Ed. Fee paid.: $952.38 electrical: wire and install pump station pedestal cabinet. ZONE Z4 - Filter building. 400-amp service. Install 400-amp 3 om 480 v service; wire: 3 tablet feeders, 8 pool lv cables, 2 3 hp pumps, 1 7.5 hp pump, 1 15 hp pump, 3 fill controllers, 3 vfd's, 3 uv filters, 3 water sensors, 6 wp lights 3 em. 1 exit, 5 GFCI, 1 occ sensors, 1 outside wall sconce, 2 panels, 1 transformer Site Work Elect underground Z Junction to Filter building - New Construction of a New Concession, Locker building, filter building and gate house. Install electric man hole, telephone hand pole, 5 4" sch 80 pvc, 2 3" sch 80 pvc - Junction Filter Building Site Work Elect underground Junction to Main building - New Construction of a New Concession, Locker building, filter building and gate house. Install 3 4" sch 80 pvc conduits, 1 1/2" sch 80 pvc conduit, 1 1" sch80 pvc conduit, 1 3" sch 80 pvc conduit, 1 3/4 sch 80 pvc conduit; wire new utility pad mounted transformer; replace 2 driveway light fixtures PLUMB: trenching and installation of new gas line connected to existing service and running to gas meter located on new main pool building PLUMB (2): ZONE Z1 - Main Pool Building South Side. 3 toilets, 4 showers, 4 floor drains, 1 electrical. Htr., 1 water cooler, 4 basins, Main building., South Side ZONE Z3 - Main Pool Building North Side. 4: toilets, 4 showers, 4 floor-drains, 1 wtr. Cooler, 4 basins, PLUMB (3): 2 4" floor drains, 1 water supply, filter building electrical: trench and install new electrical line form existing pole on Ritch Ave. To new utility pad mounted transformer; from there to new meter mounted on filter building and to 2 new meters mounted on new main pool building; also include trenching and installation of all electrical feed from new filter building to the sewer pump station, and one from the main pool building to ticket booth.
$3.7MZone Z1C – Splash pad filter equipment in filter building. Construct inground swimming pool and required safety barrier. Fencing and safety devices must comply with the State Building Code. State education fee paid: $403.78.
$1.6MPlumbing water underground main building to future irrigation for ball field. New construction of a new concession, locker building, filter building, and gate house. State education fee paid: $952.38. Plumbing: Trenching and installation of a new gas line connected to the existing service and running to the gas meter located on the new main pool building. Plumbing (2): Trenching and installation of a new 8-inch water line from the Aquarion main on Ritch Ave. Includes a new 8-by-8-foot T with a new 8-inch GME valve and thrust block. The new water main into the park will connect to the new filter building and new main pool building. The lines run through new water meters and to new bace flow preventers located in each building. Electrical: Trench and install a new electrical line from the existing pole on Ritch Ave. To a new utility pad-mounted transformer. From there, to a new meter mounted on the filter building and to 2 new meters mounted on the new main pool building. Also includes trenching and installation of all electrical feed from the new filter building to the sewer pump station, and one from the main pool building to the ticket booth.
$3.7MZONE 19 - Elect underground New Pull Box to Junction - New Construction of a New Concession, Locker building, filter building and gate house. State Ed. Fee paid.: $952.38 electrical: wire and install pump station pedestal cabinet. ZONE Z4 - Filter building. 400-amp service. Install 400-amp 3 om 480 v service; wire: 3 tablet feeders, 8 pool lv cables, 2 3 hp pumps, 1 7.5 hp pump, 1 15 hp pump, 3 fill controllers, 3 vfd's, 3 uv filters, 3 water sensors, 6 wp lights 3 em. 1 exit, 5 GFCI, 1 occ sensors, 1 outside wall sconce, 2 panels, 1 transformer Site Work Elect underground Z Junction to Filter building - New Construction of a New Concession, Locker building, filter building and gate house. Install electric man hole, telephone hand pole, 5 4" sch 80 pvc, 2 3" sch 80 pvc - Junction Filter Building Site Work Elect underground Junction to Main building - New Construction of a New Concession, Locker building, filter building and gate house. Install 3 4" sch 80 pvc conduits, 1 1/2" sch 80 pvc conduit, 1 1" sch80 pvc conduit, 1 3" sch 80 pvc conduit, 1 3/4 sch 80 pvc conduit; wire new utility pad mounted transformer; replace 2 driveway light fixtures PLUMB: trenching and installation of new gas line connected to existing service and running to gas meter located on new main pool building PLUMB (2): ZONE Z1 - Main Pool Building South Side. 3 toilets, 4 showers, 4 floor drains, 1 electrical. Htr., 1 water cooler, 4 basins, Main building., South Side ZONE Z3 - Main Pool Building North Side. 4: toilets, 4 showers, 4 floor-drains, 1 wtr. Cooler, 4 basins, PLUMB (3): 2 4" floor drains, 1 water supply, filter building electrical: trench and install new electrical line form existing pole on Ritch Ave. To new utility pad mounted transformer; from there to new meter mounted on filter building and to 2 new meters mounted on new main pool building; also include trenching and installation of all electrical feed from new filter building to the sewer pump station, and one from the main pool building to ticket booth.
$3.7MZone Z1A – Splash Pad Construction. Construct inground swimming pool and required safety barrier. Fencing and safety devices must comply with the State Building Code. State education fee paid: $403.78.
$1.6MZONE 20 - Elect underground Junction to Existing Pull Box -New Construction of a New Concession, Locker building, filter building and gate house. State Ed. Fee paid.: $952.38 electrical: wire and install pump station pedestal cabinet. ZONE Z4 - Filter building. 400-amp service. Install 400-amp 3 om 480 v service; wire: 3 tablet feeders, 8 pool lv cables, 2 3 hp pumps, 1 7.5 hp pump, 1 15 hp pump, 3 fill controllers, 3 vfd's, 3 uv filters, 3 water sensors, 6 wp lights 3 em. 1 exit, 5 GFCI, 1 occ sensors, 1 outside wall sconce, 2 panels, 1 transformer Site Work Elect underground Z Junction to Filter building - New Construction of a New Concession, Locker building, filter building and gate house. Install electric man hole, telephone hand pole, 5 4" sch 80 pvc, 2 3" sch 80 pvc - Junction Filter Building Site Work Elect underground Junction to Main building - New Construction of a New Concession, Locker building, filter building and gate house. Install 3 4" sch 80 pvc conduits, 1 1/2" sch 80 pvc conduit, 1 1" sch80 pvc conduit, 1 3" sch 80 pvc conduit, 1 3/4 sch 80 pvc conduit; wire new utility pad mounted transformer; replace 2 driveway light fixtures PLUMB: trenching and installation of new gas line connected to existing service and running to gas meter located on new main pool building PLUMB (2): ZONE Z1 - Main Pool Building South Side. 3 toilets, 4 showers, 4 floor drains, 1 electrical. Htr., 1 water cooler, 4 basins, Main building., South Side ZONE Z3 - Main Pool Building North Side. 4: toilets, 4 showers, 4 floor-drains, 1 wtr. Cooler, 4 basins, PLUMB (3): 2 4" floor drains, 1 water supply, filter building electrical: trench and install new electrical line form existing pole on Ritch Ave. To new utility pad mounted transformer; from there to new meter mounted on filter building and to 2 new meters mounted on new main pool building; also include trenching and installation of all electrical feed from new filter building to the sewer pump station, and one from the main pool building to ticket booth.
$3.7MTrenching and installation of a new 8" water line from the Aquarion main on Ritch Ave. Includes a new 8-by-8-foot T with a new 8" GME valve and thrust block. The new water main into the park will connect the new filter building and the new main pool building. The lines run through new water meters to new bace flow preventers located in each building.
Plumbing and water underground from Junction #1 to Junction #2. New construction of a concession, locker building, filter building, and gate house. State education fee paid: $952.38. Plumbing: Trenching and installation of a new gas line connected to the existing service and running to the gas meter located on the new main pool building. Plumbing (2): Trenching and installation of a new 8" water line from the Aquarion main on Ritch Ave. Includes a new 8-by-8-foot T with a new 8" GME valve and thrust block. The new water main into the park will connect to the new filter building and new main pool building. The lines run through new water meters to new backflow preventers located in each building. Electrical: Trenching and installation of a new electrical line from the existing pole on Ritch Ave. To a new utility pad-mounted transformer; from there, to a new meter mounted on the filter building and to 2 new meters mounted on the new main pool building. Also includes trenching and installation of all electrical feed from the new filter building to the sewer pump station, and one from the main pool building to the ticket booth.
$3.7MZone Z4C–pool deck, main pool, northwest. Construct inground swimming pool and required safety barrier. Fencing and safety devices must comply with the State Building Code. State education fee paid: $403.78.
$1.6MZone Z3B – main pool piping, including surge tanks and grounding. Construct inground swimming pool and required safety barrier. Fencing and safety devices must comply with the State Building Code. State education fee paid: $403.78.
$1.6MZONE Z4 - Filter building. New Construction of a New Concession, Locker building, filter building and gate house. State Ed. Fee paid.: $952.38 HVAC: install hvac system - Filter building. Install exhaust. Fan and louver 800 cfm PLUMB: trenching and installation of new gas line connected to existing service and running to gas meter located on new main pool building PLUMB (2): trenching and installation of new 8" water line from aquarion main on ritch ave.; includes new 8 x 8 T with new 8" gme valve and thrust block; new water main into park will connect new filter building and new main pool building; the lines run thru new water meters and to new bace flow preventers located in each building electrical: trench and install new electrical line form existing pole on Ritch Ave. To new utility pad mounted transformer; from there to new meter mounted on filter building and to 2 new meters mounted on new main pool building; also include trenching and installation of all electrical feed from new filter building to the sewer pump station, and one from the main pool building to ticket booth.
$3.7MPlumbing: Water underground junction #1 to filter building. New construction of a concession, locker building, filter building, and gate house. State education fee paid: $952.38. Plumbing: Trenching and installation of a new gas line connected to the existing service and running to the gas meter located on the new main pool building. Plumbing (2): Trenching and installation of a new 8-inch water line from the Aquarion main on Ritch Ave. Includes a new 8-by-8-foot T with a new 8-inch GME valve and thrust block. The new water main into the park will connect the new filter building and the new main pool building. The lines run through new water meters and to new backflow preventers located in each building. Electrical: Trenching and installation of a new electrical line from the existing pole on Ritch Ave. To a new utility pad-mounted transformer; from there, to a new meter mounted on the filter building and to 2 new meters mounted on the new main pool building. Also includes trenching and installation of all electrical feed from the new filter building to the sewer pump station, and one from the main pool building to the ticket booth.
$3.7MZone Z1B – splash pad piping, including surge tanks and grounding. Construct inground swimming pool and required safety barrier. Fencing and safety devices must comply with the State Building Code. State education fee paid: $403.78.
$1.6MZONE 22 - Water underground Junction 4 to Main building - New Construction of a New Concession, Locker building, filter building and gate house. State Ed. Fee paid.: $952.38 electrical: wire and install pump station pedestal cabinet. ZONE Z4 - Filter building. 400-amp service. Install 400-amp 3 om 480 v service; wire: 3 tablet feeders, 8 pool lv cables, 2 3 hp pumps, 1 7.5 hp pump, 1 15 hp pump, 3 fill controllers, 3 vfd's, 3 uv filters, 3 water sensors, 6 wp lights 3 em. 1 exit, 5 GFCI, 1 occ sensors, 1 outside wall sconce, 2 panels, 1 transformer Site Work Elect underground Z Junction to Filter building - New Construction of a New Concession, Locker building, filter building and gate house. Install electric man hole, telephone hand pole, 5 4" sch 80 pvc, 2 3" sch 80 pvc - Junction Filter Building Site Work Elect underground Junction to Main building - New Construction of a New Concession, Locker building, filter building and gate house. Install 3 4" sch 80 pvc conduits, 1 1/2" sch 80 pvc conduit, 1 1" sch80 pvc conduit, 1 3" sch 80 pvc conduit, 1 3/4 sch 80 pvc conduit; wire new utility pad mounted transformer; replace 2 driveway light fixtures PLUMB: trenching and installation of new gas line connected to existing service and running to gas meter located on new main pool building PLUMB (2): ZONE Z1 - Main Pool Building South Side. 3 toilets, 4 showers, 4 floor drains, 1 electrical. Htr., 1 water cooler, 4 basins, Main building., South Side ZONE Z3 - Main Pool Building North Side. 4: toilets, 4 showers, 4 floor-drains, 1 wtr. Cooler, 4 basins, PLUMB (3): 2 4" floor drains, 1 water supply, filter building electrical: trench and install new electrical line form existing pole on Ritch Ave. To new utility pad mounted transformer; from there to new meter mounted on filter building and to 2 new meters mounted on new main pool building; also include trenching and installation of all electrical feed from new filter building to the sewer pump station, and one from the main pool building to ticket booth.
$3.7MZone S16 – Plumb Line – Water Meter Vault to Junction. New construction of a new concession, locker building, filter building, and gate house. State education fee paid: $952.38. Plumbing: Trenching and installation of a new gas line connected to the existing service and running to the gas meter located on the new main pool building. Plumbing (2): Trenching and installation of a new 8" water line from the Aquarion main on Ritch Ave. Includes a new 8-by-8-foot T with a new 8" GME valve and thrust block. The new water main into the park will connect the new filter building and new main pool building. The lines run through new water meters and to new bace flow preventers located in each building. Electrical: Trenching and installation of a new electrical line from the existing pole on Ritch Ave. To a new utility pad-mounted transformer; from there, to a new meter mounted on the filter building and to 2 new meters mounted on the new main pool building. Also includes trenching and installation of all electrical feed from the new filter building to the sewer pump station, and one from the main pool building to the ticket booth.
$3.7MConstruct inground swimming pool and required safety barrier. Fencing and safety devices must comply with the State Building Code. State education fee paid: $403.78.
$1.6MSite Work Elect underground Transformer toJunction - New Construction of a New Concession, Locker building, filter building and gate house. State Ed. Fee paid.: $952.38 PLUMB: trenching and installation of new gas line connected to existing service and running to gas meter located on new main pool building PLUMB (2): trenching and installation of new 8" water line from aquarion main on ritch ave.; includes new 8 x 8 T with new 8" gme valve and thrust block; new water main into park will connect new filter building and new main pool building; the lines run thru new water meters and to new bace flow preventers located in each building electrical: trench and install new electrical line form existing pole on Ritch Ave. To new utility pad mounted transformer; from there to new meter mounted on filter building and to 2 new meters mounted on new main pool building; also include trenching and installation of all electrical feed from new filter building to the sewer pump station, and one from the main pool building to ticket booth.
$3.7MWater Meter Vault - New Construction of a New Concession, Locker building, filter building and gate house. State Ed. Fee paid.: $952.38 electrical: Water Meter Vault - install 2 2" Sch 80 pvc conduits - ticket booth PLUMB: trenching and installation of new gas line connected to existing service and running to gas meter located on new main pool building PLUMB (2): trenching and installation of new 8" water line from aquarion main on ritch ave.; includes new 8 x 8 T with new 8" gme valve and thrust block; new water main into park will connect new filter building and new main pool building; the lines run thru new water meters and to new bace flow preventers located in each building electrical: trench and install new electrical line form existing pole on Ritch Ave. To new utility pad mounted transformer; from there to new meter mounted on filter building and to 2 new meters mounted on new main pool building; also include trenching and installation of all electrical feed from new filter building to the sewer pump station, and one from the main pool building to ticket booth.
$3.7MZONE Z1 - Main Pool Building South Side. New Construction of a New Concession, Locker building, filter building and gate house. State Ed. Fee paid.: $952.38 electrical: 2 480 v 200 a 3 om services; 17 1 x 4 lights 12" recessed 4 wall sconces, 4 em 3 exits. Proposed 2 200-amp services. CRS Nos.: 2898138 and 2898143. Amendment (3/22/17): install 4 4" sch 80 pvc, 2 3" sch 80 pvc, 1 2" sch 80 pvc, 2 - 1" sch ip pvc. Transformer Pole. PLUMB: trenching and installation of new gas line connected to existing service and running to gas meter located on new main pool building PLUMB (2): ZONE Z1 - Main Pool Building South Side. Connect to town water from Aquarion water 1 - 4" ductile iron for sprinklers, 1 - 2" copper for domestic PLUMB (2): trenching and installation of new 8" water line from aquarion main on ritch ave.; includes new 8 x 8 T with new 8" gme valve and thrust block; new water main into park will connect new filter building and new main pool building; the lines run thru new water meters and to new bace flow preventers located in each building electrical: trench and install new electrical line form existing pole on Ritch Ave. To new utility pad mounted transformer; from there to new meter mounted on filter building and to 2 new meters mounted on new main pool building; also include trenching and installation of all electrical feed from new filter building to the sewer pump station, and one from the main pool building to ticket booth.
$3.7MZone S17 – Electrical line – Pump station to water meter vault. New construction of a concession, locker building, filter building, and gate house. State education fee paid: $952.38. Plumbing: Trenching and installation of a new gas line connected to the existing service and running to the gas meter located on the new main pool building. Plumbing (2): Trenching and installation of a new 8" water line from the Aquarion main on Ritch Ave. Includes a new 8-by-8-foot T with a new 8" GME valve and thrust block. The new water main into the park will connect the new filter building and the new main pool building. The lines run through new water meters and to new bace flow preventers located in each building. Electrical: Trench and install a new electrical line from the existing pole on Ritch Ave. To a new utility pad-mounted transformer; from there, to a new meter mounted on the filter building and to 2 new meters mounted on the new main pool building. Also includes trenching and installation of all electrical feed from the new filter building to the sewer pump station, and one from the main pool building to the ticket booth.
$3.7MSite work: underground gas junction to main building. New construction of a new concession, locker building, filter building, and gate house. State education fee paid: $952.38. Plumbing: Trenching and installation of a new gas line connected to the existing service and running to the gas meter located on the new main pool building. Plumbing (2): Trenching and installation of a new 8" water line from the Aquarion main on Ritch Ave. Includes a new 8-by-8-foot T with a new 8" GME valve and thrust block. The new water main into the park will connect to the new filter building and new main pool building. The lines run through new water meters and to new bace flow preventers located in each building. Electrical: Trenching and installation of a new electrical line from the existing pole on Ritch Ave. To a new utility pad-mounted transformer; from there, to a new meter mounted on the filter building and to 2 new meters mounted on the new main pool building. Also includes trenching and installation of all electrical feed from the new filter building to the sewer pump station, and one from the main pool building to the ticket booth.
$3.7MZone Z2A – wading pool construction. Construct inground swimming pool and required safety barrier. Fencing and safety devices must comply with the State Building Code. State education fee paid: $403.78.
$1.6MZone S-6. Site work: underground electrical from the main building to the ticket booth. New construction of a concession building, locker building, filter building, and gate house. State education fee paid: $952.38. Plumbing: Trenching and installation of a new gas line connected to the existing service and running to the gas meter located on the new main pool building. Plumbing (2): Trenching and installation of a new 8" water line from the Aquarion main on Ritch Ave. Includes a new 8-by-8-foot T with a new 8" GME valve and thrust block. The new water main into the park will connect the new filter building and the new main pool building. The lines run through new water meters and to new bace flow preventers located in each building. Electrical: Trenching and installation of a new electrical line from the existing pole on Ritch Ave. To a new utility pad-mounted transformer; from there, to a new meter mounted on the filter building and to 2 new meters mounted on the new main pool building. Also includes trenching and installation of all electrical feed from the new filter building to the sewer pump station, and one from the main pool building to the ticket booth.
$3.7MZone Z3C – main pool filter equipment in filter building. Construct inground swimming pool and required safety barrier. Fencing and safety devices must comply with the State Building Code. State education fee paid: $403.78.
$1.6MZone Z4E – Pool Deck, Main Pool, Northeast. Construct inground swimming pool and required safety barrier. Fencing and safety devices must comply with State Building Code. State education fee paid: $403.78.
$1.6MNew construction of a concession, locker building, filter building, and gate house. State education fee paid: $952.38.
$3.7MSite work: underground electrical from the filter building to the pump station. New construction of a concession, locker building, filter building, and gate house. State education fee paid: $952.38. Plumbing: Trenching and installation of a new gas line connected to the existing service and running to the gas meter located on the new main pool building. Plumbing (2): Trenching and installation of a new 8" water line from the Aquarion main on Ritch Ave. Includes a new 8-by-8-foot T with a new 8" GME valve and thrust block. The new water main into the park will connect the new filter building and the new main pool building. The lines run through new water meters to new bace flow preventers located in each building. Electrical: Trenching and installation of a new electrical line from the existing pole on Ritch Ave. To a new utility pad-mounted transformer; from there, to a new meter mounted on the filter building and to 2 new meters mounted on the new main pool building. Also includes trenching and installation of all electrical feed from the new filter building to the sewer pump station, and one from the main pool building to the ticket booth.
$3.7MTrenching and installation of a new gas line connected to the existing service and running to the gas meter located on the new main pool building.
Site work: underground gas line from an existing line to a junction. New construction of a concession, locker building, filter building, and gate house. State education fee paid: $952.38. Plumbing: Trenching and installation of a new gas line connected to the existing service and running to the gas meter located on the new main pool building. Plumbing (2): Trenching and installation of a new 8-inch water line from the Aquarion main on Ritch Ave. Includes a new 8-by-8-foot T with a new 8-inch GME valve and thrust block. The new water main into the park will connect to the new filter building and new main pool building. The lines run through new water meters to new bace flow preventers located in each building. Electrical: Trench and install a new electrical line from the existing pole on Ritch Ave. To a new utility pad-mounted transformer; from there, to a new meter mounted on the filter building and to 2 new meters mounted on the new main pool building. Also includes trenching and installation of all electrical feed from the new filter building to the sewer pump station, and one from the main pool building to the ticket booth.
$3.7MPlumb Water underground Junction #2 to Main building - New Construction of a New Concession, Locker building, filter building and gate house. State Ed. Fee paid.: $952.38 PLUMB: trenching and installation of new gas line connected to existing service and running to gas meter located on new main pool building PLUMB (2): trenching and installation of new 8" water line from aquarion main on ritch ave.; includes new 8 x 8 T with new 8" gme valve and thrust block; new water main into park will connect new filter building and new main pool building; the lines run thru new water meters and to new bace flow preventers located in each building electrical: trench and install new electrical line form existing pole on Ritch Ave. To new utility pad mounted transformer; from there to new meter mounted on filter building and to 2 new meters mounted on new main pool building; also include trenching and installation of all electrical feed from new filter building to the sewer pump station, and one from the main pool building to ticket booth.
$3.7MWater meter vault. Site work: gas underground junction to main building. New construction of a new concession, locker building, filter building, and gate house. State education fee paid: $952.38. Plumbing: Trenching and installation of a new gas line connected to the existing service and running to the gas meter located on the new main pool building. Plumbing (2): Trenching and installation of a new 8" water line from the Aquarion main on Ritch Ave. Includes a new 8-by-8-foot T with a new 8" GME valve and thrust block. The new water main into the park will connect to the new filter building and new main pool building. The lines run through new water meters and to new backflow preventers located in each building. Electrical: Trench and install a new electrical line from the existing pole on Ritch Ave. To the new utility pad-mounted transformer; from there, to a new meter mounted on the filter building and to 2 new meters mounted on the new main pool building. Also includes trenching and installation of all electrical feed from the new filter building to the sewer pump station, and one from the main pool building to the ticket booth.
$3.7MZone Z2B–wading pool piping, including surge tanks and grounding. Construct inground swimming pool and required safety barrier. Fencing and safety devices must comply with State Building Code. State education fee paid: $403.78.
$1.6MSite Work Elect underground Junction to Main building - New Construction of a New Concession, Locker building, filter building and gate house. State Ed. Fee paid.: $952.38 PLUMB: trenching and installation of new gas line connected to existing service and running to gas meter located on new main pool building PLUMB (2): trenching and installation of new 8" water line from aquarion main on ritch ave.; includes new 8 x 8 T with new 8" gme valve and thrust block; new water main into park will connect new filter building and new main pool building; the lines run thru new water meters and to new bace flow preventers located in each building electrical: trench and install new electrical line form existing pole on Ritch Ave. To new utility pad mounted transformer; from there to new meter mounted on filter building and to 2 new meters mounted on new main pool building; also include trenching and installation of all electrical feed from new filter building to the sewer pump station, and one from the main pool building to ticket booth.
$3.7MZONE Z5 - Ticket Booth. New Construction of a New Concession, Locker building, filter building and gate house. State Ed. Fee paid.: $952.38 electrical: wire and install pump station pedestal cabinet PLUMB: trenching and installation of new gas line connected to existing service and running to gas meter located on new main pool building PLUMB (2): trenching and installation of new 8" water line from aquarion main on ritch ave.; includes new 8 x 8 T with new 8" gme valve and thrust block; new water main into park will connect new filter building and new main pool building; the lines run thru new water meters and to new bace flow preventers located in each building electrical: trench and install new electrical line form existing pole on Ritch Ave. To new utility pad mounted transformer; from there to new meter mounted on filter building and to 2 new meters mounted on new main pool building; also include trenching and installation of all electrical feed from new filter building to the sewer pump station, and one from the main pool building to ticket booth.
$3.7MZone Z3 – Main Pool Building North Side. New construction of a concession, locker building, filter building, and gate house. State education fee paid: $952.38. Plumbing: Trenching and installation of a new gas line connected to the existing service and running to the gas meter located on the new main pool building. Plumbing (2): Trenching and installation of a new 8" water line from the Aquarion main on Ritch Ave. Includes a new 8-by-8-foot T with a new 8" GME valve and thrust block. The new water main into the park will connect the new filter building and the new main pool building. The lines run through new water meters and to new bace flow preventers located in each building. Electrical: Trench and install a new electrical line from the existing pole on Ritch Ave. To a new utility pad-mounted transformer. From there, to a new meter mounted on the filter building and to 2 new meters mounted on the new main pool building. Also includes trenching and installation of all electrical feed from the new filter building to the sewer pump station, and one from the main pool building to the ticket booth.
$3.7MPlumb Water underground Street to Water Meter Vault - New Construction of a New Concession, Locker building, filter building and gate house. State Ed. Fee paid.: $952.38 PLUMB: trenching and installation of new gas line connected to existing service and running to gas meter located on new main pool building PLUMB (2): trenching and installation of new 8" water line from aquarion main on ritch ave.; includes new 8 x 8 T with new 8" gme valve and thrust block; new water main into park will connect new filter building and new main pool building; the lines run thru new water meters and to new bace flow preventers located in each building electrical: trench and install new electrical line form existing pole on Ritch Ave. To new utility pad mounted transformer; from there to new meter mounted on filter building and to 2 new meters mounted on new main pool building; also include trenching and installation of all electrical feed from new filter building to the sewer pump station, and one from the main pool building to ticket booth.
$3.7MZONE 21 - Water underground Junction 3 to Junction 4 - New Construction of a New Concession, Locker building, filter building and gate house. State Ed. Fee paid.: $952.38 electrical: wire and install pump station pedestal cabinet. ZONE Z4 - Filter building. 400-amp service. Install 400-amp 3 om 480 v service; wire: 3 tablet feeders, 8 pool lv cables, 2 3 hp pumps, 1 7.5 hp pump, 1 15 hp pump, 3 fill controllers, 3 vfd's, 3 uv filters, 3 water sensors, 6 wp lights 3 em. 1 exit, 5 GFCI, 1 occ sensors, 1 outside wall sconce, 2 panels, 1 transformer Site Work Elect underground Z Junction to Filter building - New Construction of a New Concession, Locker building, filter building and gate house. Install electric man hole, telephone hand pole, 5 4" sch 80 pvc, 2 3" sch 80 pvc - Junction Filter Building Site Work Elect underground Junction to Main building - New Construction of a New Concession, Locker building, filter building and gate house. Install 3 4" sch 80 pvc conduits, 1 1/2" sch 80 pvc conduit, 1 1" sch80 pvc conduit, 1 3" sch 80 pvc conduit, 1 3/4 sch 80 pvc conduit; wire new utility pad mounted transformer; replace 2 driveway light fixtures PLUMB: trenching and installation of new gas line connected to existing service and running to gas meter located on new main pool building PLUMB (2): ZONE Z1 - Main Pool Building South Side. 3 toilets, 4 showers, 4 floor drains, 1 electrical. Htr., 1 water cooler, 4 basins, Main building., South Side ZONE Z3 - Main Pool Building North Side. 4: toilets, 4 showers, 4 floor-drains, 1 wtr. Cooler, 4 basins, PLUMB (3): 2 4" floor drains, 1 water supply, filter building electrical: trench and install new electrical line form existing pole on Ritch Ave. To new utility pad mounted transformer; from there to new meter mounted on filter building and to 2 new meters mounted on new main pool building; also include trenching and installation of all electrical feed from new filter building to the sewer pump station, and one from the main pool building to ticket booth.
$3.7MSite work: underground electrical line from pole to transformer. New construction of a concession, locker building, filter building, and gate house. State education fee paid: $952.38. Plumbing: Trenching and installation of a new gas line connected to the existing service and running to the gas meter located on the new main pool building. Plumbing (2): Trenching and installation of a new 8-inch water line from the Aquarion main on Ritch Ave.; includes a new 8-by-8-foot T with a new 8-inch GME valve and thrust block. The new water main into the park will connect to the new filter building and new main pool building. The lines run through new water meters and to new bace flow preventers located in each building. Electrical: Trench and install a new electrical line from the existing pole on Ritch Ave. To a new utility pad-mounted transformer; from there, to a new meter mounted on the filter building and to 2 new meters mounted on the new main pool building. Also includes trenching and installation of all electrical feed from the new filter building to the sewer pump station, and one from the main pool building to the ticket booth.
$3.7MZone Z4F – Pool Deck, Main Pool South East. Construct inground swimming pool and required safety barrier. Fencing and safety devices must comply with the State Building Code. State education fee paid: $403.78.
$1.6MZone Z4D – pool deck, main pool, southwest. Construct in-ground swimming pool and required safety barrier. Fencing and safety devices must comply with the State Building Code. State education fee paid: $403.78.
$1.6MSite Work Elect underground Z Junction to Filter building - New Construction of a New Concession, Locker building, filter building and gate house. State Ed. Fee paid.: $952.38 PLUMB: trenching and installation of new gas line connected to existing service and running to gas meter located on new main pool building PLUMB (2): trenching and installation of new 8" water line from aquarion main on ritch ave.; includes new 8 x 8 T with new 8" gme valve and thrust block; new water main into park will connect new filter building and new main pool building; the lines run thru new water meters and to new bace flow preventers located in each building electrical: trench and install new electrical line form existing pole on Ritch Ave. To new utility pad mounted transformer; from there to new meter mounted on filter building and to 2 new meters mounted on new main pool building; also include trenching and installation of all electrical feed from new filter building to the sewer pump station, and one from the main pool building to ticket booth.
$3.7MTrench and install new electrical line form existing pole on Ritch Ave. To new utility pad mounted transformer; from there to new meter mounted on filter building and to 2 new meters mounted on new main pool building; also include trenching and installation of all electrical feed from new filter building to the sewer pump station, and one from the main pool building to ticket booth.
Plumb Water underground Main building to Ticket Booth for Exterior Foot Wash Station - New Construction of a New Concession, Locker building, filter building and gate house. State Ed. Fee paid.: $952.38 PLUMB: trenching and installation of new gas line connected to existing service and running to gas meter located on new main pool building PLUMB (2): trenching and installation of new 8" water line from aquarion main on ritch ave.; includes new 8 x 8 T with new 8" gme valve and thrust block; new water main into park will connect new filter building and new main pool building; the lines run thru new water meters and to new bace flow preventers located in each building electrical: trench and install new electrical line form existing pole on Ritch Ave. To new utility pad mounted transformer; from there to new meter mounted on filter building and to 2 new meters mounted on new main pool building; also include trenching and installation of all electrical feed from new filter building to the sewer pump station, and one from the main pool building to ticket booth.
$3.7MZone Z4C – Pool deck, main pool northwest. Construct inground swimming pool and required safety barrier. Fencing and safety devices must comply with the State Building Code. State education fee paid: $403.78.
$1.6MConnect gas appliances in the concession part of the building.