200 Strawberry Hill Ave
Stamford, CT- 2026Solar
Rooftop solar PV array installation: 150.5 kW (dc).
$450K
Local provider profile
Documented work across Connecticut based on attributed municipal records.
Contact information
These details have not necessarily been claimed or independently confirmed by the provider.
No contact information was found in the available records.
Work history
Individual records are grouped by address. Totals include only values reported in public records and may not equal final construction cost.
Rooftop solar PV array installation: 150.5 kW (dc).
$450KPhotovoltaic roof-mounted system with 575 modules, rated at 235.75 kWDC and 200.0 kWAC.
$252KSolar Panels.
$73KRoof-mounted solar system, 115.2 kW.
$183KInstall a 20 kW Kohler generator with 200 amp RTS.
$3.2KInstall 20 kW generator with 200-amp rts.
$4.8KInstall 20 kW nat gas generator with 200-amp ats.
$3.3KWire a 20 kW generator with a 200 amp ATS.
$5KInstall 20kw generator with 200-amp ats.
$4.4KInstall 20 kW kohler generator with 200-amp ats.
$3.9KCut and patch miscellaneous holes in drywall to facilitate the removal of knob-and-tube wiring for safety reasons.
$1KInstall 20 kW generator.
$3.2KWire 20 kW generator.
$4.7KInstall a roof-mounted PV solar array consisting of 81 modules, totaling a DC rating of 32.81 kW.
$65.6KInstall a roof-mounted solar PV array consisting of 72 modules with a total DC rating of 30.6 kW.
$45.9KInstallation of roof top solar PV array consisting of 51 modules totaling a DC rating of 20.655 kW.
$41.3KService upgrade, 200 amps, UI# 232873.
$3KWire 20 kW generator with 200-amp ats.
$5KInstall a 17 kW standby generator.
$5KWire a 20 kW generator with a 200 amp ATS.
$3KInstall 20 kW generator with 200-amp ats.
$6.6KInstall 4 2-by-2-foot 6d fixtures.
$2KIncrease generator transfer switch per drawings for ces.
$200KInstall 20 kW generator nat gas.
$3.2KWire 20 kW generator and A/H equipment.
$1.3KReplace lighting on second floor to led.
$110KInstall 4 recessed lights and 3 outlets on 3 season room renovation.
$1KInstall new and relocate Cat5 cables in Target.
Rework Cat 5 cabling in the electronics department (data).