1 Greenwich Office Pk
Greenwich, CTNorth Building IBC 2015, Interior fit out of existing office space on 3rd fllor of existing office building. Work includes new interior framing, finishes, lighting plumbing and minor mechanicals. State Ed Fee Paid $156 PLUMB: North Building. Third floor: 4 nw: water closets, 2 nw: lavs., 2 nw: sinks, 1 new water htr. HVAC: North Building. Relocate existing HP, add VAVs, refresh registers, grills, diffusers electrical: 347 devices installed; supply and install 73 new receptacles, 172 new light fixtures, install 8 new exit signs, supply and install 36 new lighting controls, 3 new isolite inverters, wire 8 VAV's, wire only 1: hot water heater, exhaust. Fan, 2 air conditioning split systems, 2 submeters, 1 120/208v 3 phase 100-amp panel, 40 new fire alarm devices.
$600KRelocate the existing second-floor electrical closet 50 ft. West within the tenant space; frame and build a new closet and door; move existing panels and equipment to the new closet. State education fee paid: $6.76. Amendment #1: 10.27.16. Fit out existing floor with new MEPs and finishes.
$26K