Ama Design Build LLC

Documented work across Connecticut based on attributed municipal records.

Jobs on record9Recorded in our system
Reported work volume$20.2MDocumented jobs
Average project$2.2MWhere values are reported
First observed2019Available dataset
Categories5Observed work types
Used for work inStamford9 jobs

Work history

Documented work by property

Individual records are grouped by address. Totals include only values reported in public records and may not equal final construction cost.

Aerial image of 1037 High Ridge Rd, Stamford, CT

1037 High Ridge Rd

Stamford, CT
2026Building Permit

Signage installation for Chase Bank: 2 non-illuminated entry plaques, 1 illuminated monument, 2 directional signs, 2 ATM canopies, 1 interior plate-letter sign, 5 wall signs, and 1 interior illuminated octagon.

$32.9K
Aerial image of 1 Blachley Rd, Stamford, CT

1 Blachley Rd

Stamford, CT8 jobs on record
2026Demolition

Commercial alteration, Level 2, in several areas of the existing NBC Commissary. Limited demolition and replacement of finishes, kitchen equipment, millwork, lighting, power, and plumbing. A new kitchen exhaust hood is added adjacent to the existing hood and connected to the existing exhaust and make-up air. Requires mechanical, electrical, plumbing, fire sprinkler, and low-voltage permits. B-26-18.

$250K
View all 8 jobs
  • 2026Demolition

    Commercial alteration, Level 2, in several areas of the existing NBC Commissary. Limited demolition and replacement of finishes, kitchen equipment, millwork, lighting, power, and plumbing. A new kitchen exhaust hood is added adjacent to the existing hood and connected to the existing exhaust and make-up air. Requires mechanical, electrical, plumbing, fire sprinkler, and low-voltage permits. B-26-18.

    $250K
  • 2026Building Permit

    Commercial: Install a new 12,000-gallon fuel tank connected to three existing 1,000-gallon belly tanks for the standby generators, with a fuel control system for the building emergency paralleling switchgear. B-25-1879.

    $1M
  • 2025Building Permit

    Commercial alterations to reconfigure office furniture in separate areas: P2 Warehouse, 2,580 SF; Warehouse Mezzanine, 10,204 SF; and Admin Level 1,2,418 SF. Total: 15,202 SF, to increase occupancy load.

    $1.1M
  • 2025Renovation

    NBC Sports Project Phoenix partial Level P1 fit-out. Interior construction of partitions, doors, raised flooring, and ceilings for new equipment rooms. Work area: 9,835 SF. Occupant load: 248 persons. Use Group B.

    $15M
  • 2025Renovation

    Interior renovation for NBC Sports. Alter 4500 SF of office work area on Level P2. Alter 2800 SF of mezzanine-level work area. No change to use, egress, or occupancy.

    $1.6M
  • 2024Plumbing

    Interior fit-out of 4 new graphics production spaces and selective renovation of the existing collaborative work area on level P-2. Work includes new non-load-bearing partitions, glass office fronts, and ceilings. No change to occupancy classification, egress, or plumbing fixture counts.

    $350K
  • 2022Building Permit

    The Project consists of reconfiguration of the areas currently identified as Production Control Room (PCR) 1,5 and the current Tape Library area. The new proposed spaces will include Control Rooms, Audio Rooms, Flex-Tech Rooms and other supporting spaces. Additionally, a new egress stair on the west wall is proposed for the exiting of the additional occupant load created by the new spaces.

    $800K
  • 2019Electrical

    Structural steel dunnage to support electrical equipment. On 12/06/2019, reverted to add: Install additional platforms and railings around the generator enclosure, additional cost $20,000.

    $70.1K