Jobs on record13Recorded in our system
Reported work volume$4.7MDocumented jobs
Average project$527KWhere values are reported
First observed2016Available dataset
Categories5Observed work types
Used for work inGreenwich11 jobsStamford2 jobs

Work history

Documented work by property

Individual records are grouped by address. Totals include only values reported in public records and may not equal final construction cost.

Aerial image of 68 Seaview Ave, Stamford, CT

68 Seaview Ave

Stamford, CT2 jobs on record
2026Addition

Phase one: Construct the foundation only for conversion and addition, changing a Group B office structure to a multifamily structure with 63 residential units. Install helical piles for ground-floor units. Phase two: Convert an existing seven-story office building, including structured parking, into a 63-unit condominium development. The scope includes constructing residential units, common areas, and amenities; structural modifications for new layouts and features such as balconies and elevators; a new high-performance façade with updated windows; reconfiguring the parking garage for residential use; and new rooftop and canopy areas.

$533K
View all 2 jobs
  • 2026Addition

    Phase one: Construct the foundation only for conversion and addition, changing a Group B office structure to a multifamily structure with 63 residential units. Install helical piles for ground-floor units. Phase two: Convert an existing seven-story office building, including structured parking, into a 63-unit condominium development. The scope includes constructing residential units, common areas, and amenities; structural modifications for new layouts and features such as balconies and elevators; a new high-performance façade with updated windows; reconfiguring the parking garage for residential use; and new rooftop and canopy areas.

    $533K
  • 2026Demolition

    Reduce the entire building to its core. Remove interior partitions, bathrooms, HVAC systems, and elevators, and perform limited slab trenching while maintaining the primary structural steel and framing. Selectively demolish portions of the existing parking structure’s concrete slabs and parapets, re-tension post-tension slabs, and demolish the Marina building.

    $1.4M
Aerial image of 7 Indian Head Rd, Greenwich, CT

7 Indian Head Rd

Greenwich, CT
2017Demolition

Demolition of a single-family dwelling. Disposal site: 1 Crescent St., Norwalk, CT. State education fee paid: $5.20.

$20K
Aerial image of 210 Sheephill Rd, Greenwich, CT

210 Sheephill Rd

Greenwich, CT
2016Demolition

DEMO: Garage Disposal Site: 1 Crescent St, Norwalk, CT State Ed. Fee paid.: $. 26.

$1K
Aerial image of 11 13 Reed Ln, Greenwich, CT

11 13 Reed Ln

Greenwich, CT2 jobs on record
2016New Construction

2013 CT Amend. Building C: New construction of a 2 Family Duplex Unit - Townhouses. State education fee paid: $126.62.

$487K
View all 2 jobs
  • 2016New Construction

    2013 CT Amend. Building C: New construction of a 2 Family Duplex Unit - Townhouses. State education fee paid: $126.62.

    $487K
  • 2016Foundation / Earthwork

    New construction of a duplex unit under the 2009 IRC. State education fee paid: $126.62.

Aerial image of 9 Sound Beach Ave Ext, Greenwich, CT

9 Sound Beach Ave Ext

Greenwich, CT7 jobs on record
2016New Construction

New construction of 2 retaining walls. State education fee paid: $39.00.

$150K
View all 7 jobs
  • 2016New Construction

    New construction of 2 retaining walls. State education fee paid: $39.00.

    $150K
  • 2016New Construction

    2013 CT Amendments. Building C, Units A, B, and C: new construction of three-family townhouse units. State education fee paid: $190.06.

    $731K
  • 2016Plumbing

    Building #14, Units A, B, and C: new construction of a three-family unit. State education fee paid: $190.06. Plumbing: Bring 4" sewer schedule 40 through foundation; bring 1" K water from meter pit through foundation.

  • 2016Plumbing

    New construction of a three-family unit under the 2003 IBC. State education fee paid: $190.06. Plumbing: Bring in 4" Schedule 40 sewer through foundation; bring 1" K copper water from meter pit through foundation.

  • 2016New Construction

    Building A: new construction of a three-family unit–townhouses. State education fee paid: $190.06.

    $731K
  • 2016Foundation / Earthwork

    New construction of a three-family unit under the 2003 IBC. State education fee paid: $190.06.

  • 2016New Construction

    2013 CT Amendments. Building D: new construction of a three-family unit–townhouses. State education fee paid: $190.06.

    $731K