20 Arrorhead Way
Darien, CT- 2020Renovation
Bathroom Remodel.
$35K
Local provider profile
Documented work across Connecticut based on attributed municipal records.
Contact information
These details have not necessarily been claimed or independently confirmed by the provider.
No contact information was found in the available records.
Work history
Individual records are grouped by address. Totals include only values reported in public records and may not equal final construction cost.
Bathroom Remodel.
$35KRemodel existing master bathroom. Install a new elevator in the basement, first floor, and second floor. State education fee paid: $20.80. Electrical: 1 switch, 1 outlet, 2 light fixtures; run power for the elevator; install 2 recessed lights and 1 outlet in the bathroom. Plumbing: Master bathroom–relocate tub 4', relocate toilet 3', and install a new shower on the second floor.
$80KFlood Zone AE13 -Lift house in place. Remodel areas (mudroom, front porch) to accomodate lift with new stairs to add risers. Expand storage area of garage under house. Move laundry to second floor and replace some windows. State ed fee paid $39 10/22/18: Amend 1: Amend to separate permit into two phases and begin Phase 1 for interior work only; relocate laundry to second floor, remove chimney, new mudroom on first floor. Phase 2 (amendment required prior to beginning phase 2) is for the lifting of the dwelling. Proc. Fee $40 recpt 18-3236 electrical: relocate laundry room from first floor. To second floor.; install 1 surface mt lt, 1 washer, dryer, 2 duplex outlets; rewire bedroom. Circuit PLUMB: second floor: new: clothes washer, floor-drn.
$150KConstruct 12'x18' deck attached to existing 12'x12' deck @ east side of house Height of deck is 8' +/-.
Addition of a new deck and screen porch. State education fee paid: $26.00. Electrical: Repair conduit to sewer pump and replace wire.
Addition of a new deck and screen porch. State education fee paid: $26.00.
$100KNew construction of a single-family home with an unfinished basement and a front covered porch, under the 2009 IRC and 2009 IECC. State education fee paid: $92.30.
And 2009 IECC New Construction of a Modular Single Family Home unfinished basement, front covered porch State Ed. Fee paid.: $92.30 4.6.17 Adjust final value $35,596 permit fee $468 state ed.$9.36 rec. 17-0957 HVAC: install 2 warm-air gas furnaces direct vent cooling coils, condenser and ductwork/ gas line. Amendment (10/26/16): install 2 hydro air handlr. Instead of gas furnaces, gas ductwork and condensing units - all inside (water liner and boiler not included) HVAC (2): install wall-hung combination condensing boiler, direct vent with piping to 2 air handlers PLUMB: First floor: 1 water closet, clothes washer, dishwasher, floor-drn., 2 hose bibs, sinks; Second floor: 2 water closets, sinks, 1 tub, shower; interior gas (modular house) electrical: 200-amp service. Wire modular house; run all feeders into panel.
$355K