9 15 2026
Trumbull, CT- 2026Mechanical
Second-floor bedrooms and dining room.
$8K
Local provider profile
Investor and Board Observer · The Lost Explorer Mezcal Company
Documented work across Connecticut based on attributed municipal records.
Enriched provider details
Supplemental data supplied by FullContact and stored separately from public records.
Inventor, entrepreneur and investor in software and technology. Founder, Chairman & CEO of Solera, a global leader in digital technologies that manage and protect life's most important assets: our cars, homes and identities. Founder & Chairman of LIFT: Life is Full of Transformation, a global non-profit initiative on a mission to create second chances for women and children. Founder & Chairman of NEXT Mission, a non-profit movement committed to forming meaningful and rewarding career opportunities for military veterans. fb.com/tonyaquila8020 Insta + Tw: @tonyaquila8020
FullContact query stored 2026.
Contact information
These details have not necessarily been claimed or independently confirmed by the provider.
Work history
Individual records are grouped by address. Totals include only values reported in public records and may not equal final construction cost.
Second-floor bedrooms and dining room.
$8KWith a two second floor zone duct system Addition, Mudroom, Garage outlets to code ARC fault protection. Sub.
$20KHVAC, Geothermal, Chimney liners & Oil Tank Permit WILTON
$4.9KHVAC, Geothermal, Chimney liners & Oil Tank Permit WILTON
$4.8KInstall a Bosch ductless heat pump for the cottage, a Navien 95% condensing tankless water heater, Wardflex gas lines for the water heater and stove with gas shutoff valves, and moisture traps. Terminate the building for connection to the propane tank by the propane company.
$7.2KRemove the existing gas hot water heater and install a Navien 95% tankless gas hot water heater using the existing gas line.
$5.5KSecuring gas line for furnance with new shutoff.
$800Install a 3 zone bosch 20 seer 18 seer2 heat pump system with hydro air auxiliary heat and a navien 95% condesing natural gas combi boiler, also 1" back gas line from meter to boiler.
$32.2KRemove the tank-type gas hot water heater for the second floor and install a Navien tankless hot water heater near the outside wall next to the new furnace.
$3KRemove the second-floor oil tanks, furnace, and ductwork in the basement, and install a 95% condensing gas furnace on the outside wall of the basement and a one-zone duct system for the first floor, adding one new central return.
$10KRun 1" black iron gas piping from the gas service to the new second-floor furnace with a shut-off valve and moisture trap.
$1KRemove the gas water heater and install a Navien tankless hot water heater near the outside wall next to the new furnace.
$3.5KInstall a condensing gas furnace to be located neat outside wall of basement with a 1 zone duct system for the first floor, add one new central return - remove first floor AG oil tanks and take away for disposal, run iron gas piping from the gas service to the new furnace with a shut off valve and moisture trap.
$9.2KInstalling an underground gas line using polyethylene piping from the existing propane tank to the outdoor kitchen for the gas grill.
$2KRun 20 ft of black Remove the oil inverter with iron piping from the navien to the new gas service. Boiler, and radiators, and install a Bosch 36,000 BTU 18 SEER2 heat pump a 2 zone duct system for the first and second floors. Install a navien 95%.
$800Condensing gas boiler for auxiliary heat and domestic hot water.
$20KRun 40' of ward flex to the new generator.
$1.2KZone 48,000 BTU Bosch ducted mini-split for the first and second floors.
$25KInstall a 1 zone Pull permit.-protect plywood-wood edge. White.-install install Owens special ridge vent O. C)-replace plumbing duct system with a 36,000 BTU 18 SEER2 Bosch heat pump. Your property (we use special tarps).-remove complete old shingles.-repair as need (additional $75)-install Owens Corning system.- install 8 inches drip ice and water complete.(waterproof)-install new starter strip shingle. Corning 50 year shingle.-shingles will be architectural (we use 6 nails)-install vent sure plastic (it will prevent moisture)- install hip and ridge (ridge cap pipe flashing as need.-install-replace bathroom fan.-replace- install.
$16KInstall one-zone ducted heat pump.
$19.9KRemove the existing heat pump from the condo and replace it with a 24000 BTU heat pump. The condenser will be in the exact spot where the existing condenser is located, to the left of the front door, behind the bush.
$10K7000 Install Remove shingles water a fujitsu 2 zone ductless mini split for the rear porch and living room existing roof shingles and replace with 25 SQ new architectural asphalt following code and manufacturers recommendations. Install ice and shield as required by code and apply 4†polymer membrane tape on.
$6.6K1000Run 26' of 1/2" wardflex gas piping from the existing gas main to the gas furnace. ANTHONY.
$6.6K12480trane 95% condensing gas furnace and 36,000 BTU 14 SEER Air conditioner. ANTHONY.
$6.6KRemove the existing above-ground oil tank from the basement and install a condensing gas furnace with black iron gas piping from the new furnace to the new propane tanks.
$5.1KRemove the old boiler and oil tank and take them away for disposal. Install a new combi boiler for domestic hot water and space heating, and install gas piping.
$11.5KInstall a 3'x3' condenser to right side of house.
Mechanical: Install central AC for the main level.
$8KInstall a condensing natural gas combi boiler for space heating and domestic hot water.
$8.6KHVAC Work
HVAC
HVAC Work Electrical
HVAC
$12KInstallation of a ductless heat pump for the den.
$4KInstall an air conditioning system with an outdoor condensing unit and evaporator coil.
$6KReplaced the air handler and outdoor condenser. No ductwork or refrigeration lines.
$5KMechanical: Install an air-conditioning unit in the existing duct system.
$3.8KInstall 1 zone central air conditioning system with ducts located in attic.
$12.4KInstall a 5-zone hydro-air heating and cooling system for the 1st, 2nd, and 3rd floors; 3 air handlers and ducts; a condensing gas boiler with an 80-gallon indirect forced hot water heater; vents for all baths, kitchen, and dryer; and an erv unit and vents.
Replace existing air handler and outdoor condensing unit. Air conditioning only.
$5.6KRelocate floor supply ducts for kitchen renovation. Install a vent and makeup air kit for the new range hood.
Mechanical: Install 3-tone AC system with duct system in attic.
$8.9KDuctless mini-split heat pump for pool house and exhaust fan in pool house bathroom.
Install an 11-zone heating and cooling system with 6 hydro-air handlers, a condensing gas boiler, and a 105-gallon indirect water heater; 1 condensing gas furnace for rooms over the garage; 1 gas unit heater for the garage; and 1 ductless air conditioner for the IT room.
Install a 4-zone hydro-air heating and cooling system with 2 24,000 Btu air-conditioning systems and 1- and 3-zone duct systems; a 95% condensing gas boiler with an 80-gallon indirect forced-water htrl; all bath fans and vents; a range hood with makeup air; and a dry box and vent for the laundry dryer.
3 zone hydro-air heating and cooling system for 1st and 2nd floors. And attic; high-eff. Condensing gas boiler with 80 gallon. Indirect fired hot water heater.
Install ducts for wine cellar unit/closet.
Install a 4-zone hydro-air heating and cooling system with 2 a/h for the 1st, 2nd, and 3rd floors; a condensing gas boiler with an 80-gallon indirect-fired hot water heater; and vents for bath fans, dryer, and range hood. Heat loss in file (BB).
Install a 5-zone hydro-air heating and cooling system with 2 a/r handlers, a condensing boiler, and an 80-gallon indirect-fired hot water heater; kitchen range hood vent with makeup air; vents for bathroom fans; and laundry dryer vent.
Install 2–5 zones of duct systems, 2 condensing gas furnaces for each side of duplex, 2 central air conditioning systems for each side of duplex, and make-up air kits for each side.
$800KMechanical: Relocate supply and return ducts for office renovation in suspended ceiling.
$5KMechanical: Install heating and cooling system. 4 air handlers and ducts, new boiler and hot water heater.
$62.2KInstall a supply vent in the basement bathroom from the existing system.
Install 3 zone hydro-air heating and cooling system with 95% condensing gas combi heater and 2 central air conditioning systems 2-ton and 3-ton.
Install 3-zone duct system and connect to the existing furnace and air conditioning. Install a combustion air system for the mechanical room.
Install a 4-zone hydro-air heating/cooling system with 2 a/r handlers and condensers; install a high-efficiency condensing gas boiler with an indirect-fired water heater; vents for the range hood, bath fans, dryer, and kitchen makeup air. For the range hood.
Install a 4-zone hydro-air heating and cooling system with 2 air handlers, a condensing gas boiler, and an 80-gallon indirect-fired water heater; vents for all bath fans, dryer, and range hood with makeup air.
Change equipment in basement; redo ductwork in basement; add gas line to equipment.
$8.3KInstall a hydro-air heating and cooling system for the room over the garage, with a 1-zone duct system and Navien combi boiler.
Install a 7-zone hydro-air heating and cooling system; 2 air handlers and condensers; gas boiler with indirect-fired hot water heater.