11 Round Hill Club Rd
Greenwich, CT- 2021Mechanical
HVAC
Local provider profile
Documented work across Connecticut based on attributed municipal records.
Contact information
These details have not necessarily been claimed or independently confirmed by the provider.
No contact information was found in the available records.
Work history
Individual records are grouped by address. Totals include only values reported in public records and may not equal final construction cost.
HVAC
HVAC
HVAC
$30KIMC; 2 direct-vent gas furnaces with air conditioning; venting only for bathroom fans, dryer, and kitchen hood; refrigeration line and ductwork.
Replace existing gas furnaces and outdoor air conditioning unit. Install new ductwork and relocate R/C to the back of the house.
Relocate existing ductwork in the attic for the new addition; relocate existing ductwork in the basement for the new floor. Plan layout.
3-ton split air conditioning system with hydro-air zoneless ductwork, air outlets, thermostat, refrigeration piping, and condensate. Hydro-piping by others.
Replace 2 existing indoor air handlers with hot water coils and 2 outdoor air conditioning units. New ductwork in basement.
Replace the existing first floor. Install a 3-ton hydro system and relocate existing ductwork to the new layout.
IMC. Equipment and ductwork (existing); furnish and install 5 air outlets and 1 central return grill; reuse and relocate to-stat, as per plans.
First floor: 1: a/h with hwc for hydro heat (done by others), and a 2.5-ton air conditioning system; Second floor: 1: a/h with hvac for hydro heat (by others) and 3 tons of air conditioning; ductwork, a/r outlets, frig./condensate; t-stats. Amendment (6/9/20): First floor: 1 A/H with HWC for hydro heat (by others), and 2.5-ton air conditioning system; Second floor: A/H with HWC for hydro-heat (by others), 3-ton on air conditioning; ductwork, air outlets, frig./condensate, to-stats fireplace ventings as per MFG.
IMC. As per plans and specifications: furnish and install 2 gas furnaces, 2 air conditioning units, ductwork, RGD's, flue piping, and refrigeration piping.
Install 3 rooftop units, ductwork, and venting only for the bathroom fan and dryer.
Installed by others: all HVAC equipment, as per plans. Furnish and install grilles, registers and diffusers, exhaust fan, ductwork, refrigeration and condensate piping, as per plans. Install by others: controls and thermostats.
1 gas furnace with 2 tons of cooling; ductwork, a/r outlets, refrigeration, condensate and flue piping, t-stat.
1 gas furnace with air conditioning, first floor.; 1 gas furnaces for 2nd and 3rd floors. With zoning; ductwork, frig. And condensate piping, flue piping, t-stats.
Furnish and install 2 gas furnaces and 2 outdoor condensers; ductwork, a/r outlets, refrigeration and condensate, thermostat, and venting.
Replace 2 existing air conditioning units and indoor air handlers, plus add new ductwork for the addition.
Relocate existing ductwork for a new drop ceiling; install a new ceiling diffuser; venting only for bathroom fans and dryer.
Relocate existing supply diffuser for lobby area.
Furnish and install 2 hydro A/H (Trane) with air-conditioning units, including ductwork, refrigerant piping, condensate, drains, and venting only for the bathroom, dryer, and kitchen hood.
Install 2 hydro heat air handlers with air conditioning, including ductwork, refrigeration piping, condenser drains, and venting only for bathroom fans, dryer, and kitchen hoods.
$980KFurnish and install 2 3-ton split heat pump systems; ductwork, zoning, grills, reg. Diff., refrigeration and condensate piping, thermostats, controls, start and test.
Replace the existing rooftop. Replace the old rooftop air conditioning unit with a new one.
$10KIMC and IRC. As per plans, install 5 gas furnaces with OK, ductwork, GRD's, exhaust fan, refrigeration and condensate piping, control wiring, and stats.
Furnish and install 1 gas furnace, 3 tons of cooling ductwork, air outlets, 3 zones, flue piping, and refrigeration piping T-stats.
2015 IBS: Lessee New England Rentina. Interior renovations to the first-floor entry lobby, including new finishes, lighting, and HVAC. State education fee paid: $6.50. Electrical: Renovate the office lobby with recessed lights, exit signs, and LED strip lights. HVAC: Relocate existing supplies, diffuser, and return to the new lobby layout.
Relocate existing ductwork, supply diffusers, and grills.
Relocate 2 new condensers to the back of the garage (see approved site plan).
$4KInterior renovation: relocate ductwork in the wall for the bedroom on the second floor. Redo the kitchen hood exhaust ductwork and dryer exhaust ductwork. No equipment; ductwork only.
Interior renovation; reuse existing ductwork and install new ductwork. New GR and D's: 1 bath fan and 1 electrical wall heater (no equipment).
Furnish and install 1 gas furnace, 4 tons of cooling, ductwork, air outlets, flue, refrigeration and condensate piping, 3 zones, and thermostats.
Ductwork and grounds as per plans. All HVAC equipment is existing.
Remove the existing gas furnace, evaporator coil, and air conditioning condenser; furnish and install one new Trane gas furnace, evaporator coil, and condenser.
$7.8KUnderground ductwork for finished basement area. Amendment (10/15/18): Install 5 gas furnaces with air-conditioning ductwork, registers, grills, refrigerant piping, PVC vent piping for gas direct-vent furnace, and venting for bathroom fans, dryer, and kitchen hood.
Furnish and install as per plans and design, with a reduced amount of system. The system was changed to a hydro-air system. The outdoor unit will not change locations.
Reuse existing ductwork and furnish and install new grills and diffusers. Reuse the existing heat and air conditioning system (no outside condenser or RTU).
Basement: direct-vent gas furnace with air conditioning; ductwork, refrigerant piping, registers, and grills.
2 hydro-air systems installed; 1 3-ton for first floor., 1 2-ton for second floor.; ductwork, zones and air outlets.
2 gas furnaces with air conditioning, ductwork, air outlets, frig piping and flue piping; t-stats.
1 ductless split heat pump for playroom over garage.
New gas furnace with direct vent through side wall, 100000 BTU, with 4-ton air conditioning unit, ductwork, refrigeration piping, registers, and grilles.
Add 2 supplies to finish attic room.
Gas furnaces with air conditioning; ductless VRF heat pumps; exhaust fans; ductwork; grilles, registers, and diffusers; fire dampers; flue piping; refrigeration and condensate piping; thermostats; 2 controls.
Replace existing heating system with a new direct-vent gas furnace with air conditioning; new ductwork and venting for bathrooms, dryer, and kitchen hood.
2 Goodman gas furnaces, 2 1 2-ton air conditioning system and 1 3-ton system; ductwork, grills, registers, and diffusers.
$15KUnit 4E. Remove the existing gas furnace and install a new gas furnace (60000 BTU).
$4K1 gas furnace with air conditioning for addition/playroom; reuse and relocate 2 existing outdoor air conditioning units.
Add a gas boiler to feed 2 60000 BTU hydro-air handlers, as well as a domestic hot water storage tank.
2 split a/lc systems; ductwork and hot water coiler for hydro heat by others.
$12KHydro air: 4 1st Co. A/H units with hot water coils for heating; 4 outdoor air conditioning condensers; ductwork, grills, registers and diffusers; insulation; 2 gas boilers for radiant heat; first floor and master bath only; piping, pumps, valves, flue piping, refrigerant piping and condensate piping.
Furnish and install all necessary ceiling diffusers and return grilles from existing ductwork and heating and air conditioning equipment. Note: There is an existing rooftop unit to remain.
Reuse existing ductwork; furnish and install new grills and diffusers; reuse existing heat and air conditioning system. No outside condenser or RTUs.
Duct work only: remove and replace existing flexible ductwork (no condenser unit).
, as per plans: All necessary new ductwork and new GRDs; reuse and relocate existing air outlets.
Furnish and install the following: 2 split air conditioning systems with hot water coils in ductwork for hydro heat, gas boiler, indirect HWH, circulation pumps, hydronic piping, exhaust ductwork for dryer, refrigeration, condensate and flue piping, and air outlets.
Gas furnaces (direct vent), air conditioning units, ductwork, refrigerator piping, and venting only for bathroom fans, dryer, and kitchen hood.
Furnish and install ductless systems and exhaust fans as per plans.
2 4-ton air conditioning system and 1 3-ton air conditioning system with hydro heat coil, ductwork, grills, reg. And diff.
Reuse and relocate the existing indoor unit; reuse and relocate and add ductwork, grills, registers, and diff. “As per plans.”.
As per plans, reuse existing HVAC system, new and reused ductwork, new grilles, reg. And diff.
Relocate existing ductwork for new alteration; vent all existing bathroom fans; replace existing systems.
Each townhouse to have 2 direct-vent gas furnaces with air conditioning, 2.5-ton each; ductwork, supply and returns; venting only for bathroom fans, kitchen and hood, and dryer.
As per plans: 1 nw: split system, plus existing RTU. New ductwork, new grills, reg. And diffuser, unit htrs. 1 roof fan. (existing unit to remain).
Replace the existing heat and air conditioning system with 2 new gas furnaces and 2 air conditioning systems, ductwork, and ceiling 2-by-2-foot a/r outlets.
3 direct-vent gas furnaces with air conditioning and ductwork; venting only for bathroom, dryer, and kitchen hood.
First floor and basement: furnish and install 2 2-ton air-conditioning split systems with hot water coils in air handlers for hydro heat by others. Second floor: 1 4-ton air-conditioning split system with a hot water coil in an air handler for hydro heat by others. Ductwork, zoning, and grd's.
Replace the existing air conditioning and heating system; modify the existing ductwork; new grills, reg. And diff.
3 split air conditioning systems with hot water coils for hydro heat; 1 gas boiler, ductwork, hot water piping, frig. Piping, grills, reg. And diff., and t-stats.
Install air conditioning only for the poolhouse: 1 Trane air handler, 2-ton, located above the bathroom, to 1 Trane 2-ton air conditioning unit, ductwork, register, and grills.
Remove old oil furnace and replace it with a new hydro Trane a/r handler. Located in attic. Duct work, bathroom venting, and fans. Note: Reusing existing outdoor air conditioning units.
4 split air conditioning systems with hot water coil for hydro-heat (by others); ductwork, grills, registers and diffusers, refrigeration, dryer and bath exhaust.
2 gas furnaces, direct vnet with air conditioning for each unit; venting for bathroom fans, dryer, and kitchen hood.
Furnish and install 5 air handlers with HWC, boiler, piping, pumps, ductwork, and GRDs for a hydro-air system; install 5 outdoor condensing units with all refrigeration and condensate piping.
2 gas furnaces with air conditioning; ductwork, venting, registers, grills.
Ductwork, new rooftop units, GRDs.
New hydro air for the first floor. 3.5-ton air conditioning unit; reuse existing air handler fan for the second floor; add hot water coil, venting only, bathroom, dryer, and kitchen hood.
6 apartments, 6 direct-vent gas furnaces, 40,000 BTU with air conditioning, 1.5-ton outdoor air-conditioning unit, ductwork, and venting.
First floor and finished basement: 1 gas furnace with air conditioning. Second floor: master bedroom, bedroom, and playroom–zoning. 1 gas furnace with air conditioning and ductwork on the first and second floors. Zoning, refrigerant, condensate, grills, and reg. Diff.
Replace 2 hydro air handlers, 1 4-ton unit, and 1 2-ton unit for the existing guest cottage; replace the existing outdoor air conditioning unit; install new ductwork and bathroom venting.