5 Stonehedge Rd
Norwalk, CTInstall a 2.5-ton Mitsubishi heat pump ductless split system and relocate the existing AC to new.
$8KLocal provider profile
Documented work across Connecticut based on attributed municipal records.
Work history
Individual records are grouped by address. Totals include only values reported in public records and may not equal final construction cost.
Install a 2.5-ton Mitsubishi heat pump ductless split system and relocate the existing AC to new.
$8KRemove (2) existing gas furnaces and AC system. Install (1) new 100,000 BTU gas furnace and (1) new 4-ton AC. Extend ductwork in the new addition area and convert the entire house to 3 zones. Note: Gas piping by others; electric by others.
$17KBY OTHERS Flat Panel Sign (1/4" ACM) 179"w x 30"h Fastened to wall on store front. For Head of.
$4.5K2 new 60,000 gas furnaces, 2 new gas lines to furnaces, 2 new 2.5-ton AC systems, new ductwork.
$22KInstallation of two ductless heat pump systems for units 7 and 8; heat pump units going on roof.
$20KInstall a new ducted forced warm air heating and air conditioning system with a 120,000 gas furnace and 5-ton AC, with 4 zones.
$35KInstall a gas furnace, 1.5-ton condenser with ductwork, and new gas piping.
$10KInstall a gas furnace, 1.5-ton condenser with ductwork, and new gas piping.
$10KInstall 2 new ducted forced warm air heating and AC systems using 1 60,000 NBTU gas furnace, 1 40,000 BTU gas furnaces with 1 2/5-ton condensing units and 1 1.5-ton condensing units, install necessary gas piping.
$14KInstall a new ducted 1/5 ton AC system for a new addition, with 1 new air handler and 1 new 1/5 ton condensing unit.
$18.4KRemove oil heat systems, install new 60000 gas furnace with gas poing, and 1 2-ton ducted AC system, install new gas piping for stove - second floor only.
$12KInstall a new 40 CFM inline fan with necessary ducting and a cap to the roof.
$1.8KInstall a new 1.5-ton hydro heat and air conditioning system for the room over the garage.
$7.8KInstall a new gas line from the meter and install a gas-fired furnace only.
$6.5KInstall (2) new gas-fired wall-mounted boilers, 2 new gas-fired wall-mounted water heaters, and new gas lines to each.
$12.3KInstall a new boiler with domestic hot water replacement for the second-floor zone.
$4.8KInstall combi boiler with 2 ducted hydro heating and air conditioning systems, one on each floor using 2-ton for first floor and 2./5-ton for upstairs with water piping to the air handlers.
$35KInstall one ducted forced warm air heat and AC in 1 apartment, one 40000 gas furnace, one 2-ton AC in unit B - no outside work at this time - pending zoning).
$26KInstall ducted forced warm air heat and AC system - 100,000 BTU furnace with 4-ton AC.
$18KNew 3 zone ducted forced warm air heat and AC system, 100,000 BTU with 3/5-ton AC.
$21KNew 150000 BTU gas boiler and two new ducted hydronic heating and air-conditioning systems, one upstairs and one downstairs.
$35KMove ductwork in office, new outlets in powder room, new outlet in master bath, exhaust fan ducting, new dryer exhaust, move thermostat to MBR; E21-0364-Ele No Fee: Wire electrical for new addition and interior renovation: 40 outlets, 25 lights, 1 dryer outlet, 2 exhaust fans and floor heat, and 30 switches.
$5KInstall ducted forced air heat and AC system, 80,000 gas furnace and 3-ton AC.
$20KAdd ductwork for a new basement zone. Install a new 3-ton AC and 3 top hydro air handler for the whole house.
$10KDucted forced warm air heat and air conditioning system.
$12KMechanical: Install a new ductless split heat pump air conditioning system for the paddle hut.
$6.5KInstall a 4-ton Trane water-source heat pump air conditioning system.
$29KMechanical: Install ducted forced warm air heat and air conditioning.
$15KMechanical: Install a new gas furnace with an air conditioning system and a new gas line.
$2.1KMechanical: Replace the existing 3-ton AC system.
$4KMechanical: Install (2) ducted Hydro Heat and AC systems with piping to the existing boiler.
$23KMechanical: Install a ductless split heat pump/AC system.
$7KMechanical: multi-zone warm-air heat and AC systems (electrical and gas pipe by others).
$13KMechanical: Install hot-air furnace and gas line.
$2.5KMechanical - install duct Hydro Heat and AC on each floor 0 hot water pipe to exist. boiler.
$20KMechanical: install AC only.
$20K