34 Maple St
Norwalk, CT- 2024Build Alt Comm
Tenant fit-up for “Goldstone Caregiver Center,” with interior renovations on the 1st level.
$411K
Local provider profile
Documented work across Connecticut based on attributed municipal records.
Contact information
These details have not necessarily been claimed or independently confirmed by the provider.
Work history
Individual records are grouped by address. Totals include only values reported in public records and may not equal final construction cost.
Tenant fit-up for “Goldstone Caregiver Center,” with interior renovations on the 1st level.
$411KSuperstructure for 4 town houses – building 3,4,5 and 6.
$3.2MSuperstructure for Buildings 1 and 2 – two family of 69 units.
$1.6MPlumbing Work
Plumbing Work
Alteration
$1MZONE 3 - Lessee: AQR Tenant fit0out of office space on fourth floor. State Ed. Fee paid.: $1950.00.
$7.5MLessee: AQR. Tenant fitout of office space on fourth floor. State education fee paid: $1950.00.
$7.5MZONE 2 - Lessee: AQR Tenant fit0out of office space on fourth floor. State Ed. Fee paid.: $1950.00.
$7.5MZONE 4 - Lessee: AQR Tenant fit0out of office space on fourth floor. State Ed. Fee paid.: $1950.00.
$7.5MZone 1. Lessee: AQR. Tenant fitout of office space on the fourth floor. State education fee paid: $1950.00.
$7.5MMixed Used Building.
$7.9MStorm Drain System.
$3MBuilding 2 – fourth floor. Interior demolition, including removal of all floors, partitions, and ceilings. Removal and infill of existing stairs. MEP removals. State education fee: $78. Electrical: NEC; demolition and safe-off of existing electrical equipment located on the fourth floor of Building 2; supply and installation of temporary lighting and 1 receptacle; supply and installation of a new 100-amp feeder to refee the existing generator. 1 outlet, light fixture. Existing 3000-amp service. HVAC: IBC – Building 2 – fourth floor: demolition of existing HVAC equipment on the fourth floor and associated equipment on the roof.
$300KLessee: Silver Point Capital L. P. First-floor vestibule renovation and conversion of open-area seating to 3 offices. State education fee paid: $31.20. HVAC: Install RGD's; relocate existing RGD's and existing T-stat; balancing. Electrical: 44 devices installed. Lighting, exit sign, switches, outlets, overfloor raceway, and trading desk relocation as shown; select electrical demolition included. Data wiring included for 44 new CATSe and 24 relocated existing.
$120KRenovation of the exterior courtyard, including new retaining walls, stairs, and landscaping. State education fee: $130. Electrical work: site lighting for Harrison Courtyard; underground conduits for 50 new site lighting fixtures; underground conduits for 4 new GFI receptacles; 4 outlets and 50 light fixtures.
$500KRebuild 2 story classrooms. State Ed Fee Paid $1115.40 PLUMB: First floor: 4 water closets, 6 sinks, 2: floor-drns., basement: 4 floor-drns., Second floor: 4 water closets, 6 sinks, 2: floor-drns.; plumbing at Middle School Wing (Science classrooms and RR) electrical: 425 devices installed; Middle School: 98 lighting controls, 216 lighting fixtures, 138 receptacles, 1 call for aid, 87 low voltage drops, 8 patch panels, 1 ladder rack, 3 roof top Units 18 cassette units, 2 exhaust. Fans, 91 fire alarm devices, 5 new electrical. Panels and feeders, 1 new 800-amp MDP, temp. lighting and power; disconnect and safe off for demolition by others HVAC: Install 3 Mitsubishi dedicated outdoor air systems and 3 spa systems and all associated ductwork, piping, diffusers, insul.
$4.3MTenant fit up Walgreens.
$600KFoundation for building R-4.
$139KFoundation for building R-1.
$139KFoundation for building R-3.
$139KConstruct an office conference room.
$10KFoundation.
$1.8MSub grade drainage.
$70KInternational Existing Building Code (IEBC): Second floor. Interior demolition and construction of a demising wall. State education fee paid: $19.50. Electrical: 14 devices; interior demolition and construction of a demising wall; relocate existing 2-by-2-foot light fixtures (7); supply and install new EM wall packs (2); supply and install new exit sign (1); supply and install new single-pole switch (1); disconnect and remove existing receptacles (2); disconnect and remove existing electrical panel (1).
$75KInternational Building Code office fit-out on the first floor. State education fee paid: $2,028.
$7.8MRenovation of existing office space on the second floor. Convert 1 conference room into 2 offices. State education fee paid: $12.22.
$47KReduce to core on the 1st and 4th floors. State education fee paid: $187.20. Electrical: 42 devices installed; demolish all electrical wiring and equipment on the 1st and 4th floors; supply and install 10 temporary power units on the 1st and 4th floors; supply and install 24 temporary lighting units on the 1st and 4th floors; supply and install 4 temporary exit signs on the 1st and 4th floors; demolish all fire alarm wiring and devices; supply and install 4 temporary audio/visual devices for fire protection during demolition of space. HVAC: demolish existing HVAC equipment and repipe existing for coil units.
$720KInterior fit-out on the second floor, Greenwich Plaza. State education fee paid: $65. Amendment #1: value $277,500; fee $4,282.28. Fit-out of an additional 3,083 SF of corporate office space.
$250KRenovate current storage rooms on second floor into coat closet, 2 phone rooms and a pre action room State Ed. Fee paid.: $11.18 electrical: 14 devices installed; relocate exist. 2 x 2 lights (4); relocate exist. light swtch (1), 1 new light swtch., supply/install new quad receptacle (4), and 4 back box and conduit for data PLUMB: relocate heads in second floor. Phone room area to accommodate new wall and ceiling layout. First floor: 1 water closet, sink; Second floor: 2 sinks, 1 water closet, tub, shower HVAC: 2 new branch runs and demolition of 1 exist. supplemental units.
$43KLessee: AQR Captial Mgmt Demolition of third floor Office Area--to be completed in 2 phases. (Amendment to follow) State Ed. Fee paid.; $20.80 Amend #1: 3.3.17 val $2,000,000 fee $30,560 interior fit out Amend #2: 6.14.17 val $1,000,000 fee $15,320 add staircase at exisisting project (Phase B) from 2nd to third floor and renovate additional space (adjacent) Amend #3: 1.3.18 val $450,000 fee $6,967 extend staircase from third floor to fourth floor with AQR third floor space Amend #4: 7.9.18 val $200,000 fee $3,152 remove desk making conference room HVAC: duct, RGD's, insulation, exhaust (inline) VAV's. electrical: 1143 devices installed; 357 new lighting, 250 new receptacles, new 100 kW UPS (1); new 112.5 KVA transformer (2); install new electrical. Panels (13); wire only of new hvac equipment(63); new fire alarm devices (35); only conduit and back box for tele/data (200); new exit signs (17); install new lighting switches (205). Amendment (12/31/18): audio/visual wiring and installation (fourth floor) electrical (2): hvac controls electrical (3): third floor: install 863 cat6 plenum cables, fiber optic backbone PLUMB: Third floor: 2 water closets, urinals, 1 laundry tub, 4 sinks; connect to exist. sanitary, vent, domestic water; provide hot water htrs., and hot/cold water PLUMB (2): modify existing sprinkler ystem for new floor and ceiling plans per NFPA 13. Prints in file BB.
$80KStructural repairs to the existing Merrittview Plaza garage per the engineer's specifications—Phases 9A and 9B.
$252KInterior renovations to the first-floor fitness center, including bathrooms and lockers.
$250KVanilla box – 6th floor.
$61KTenant space on the 6th floor: “A Vision Young.”
$91KRenovations to existing 6th floor and penthouse bathrooms.
$250KMechanical, electrical, and plumbing infrastructure upgrade for NBC Studio B. Use Group: A1/B. Fully sprinklered.
$313K6-10 Glenville St., Zone 4, second floor south. Interior alterations to create 33 residential units. State education fee paid: $2207.66. HVAC, 6-10 Glenville St.: Supply and install 38 hydro air systems for 32 apartments, with all necessary ductwork per plans. Supply and install hydro piping only; boiler by others. Supply and install garage exhaust fan with all necessary ducting per plans. Plumbing: Basement: 1 water closet, 1 basin, 2 urinals, 2 floor drains, and 4 hose bibs. First floor: Install 15 water closets, 15 tubs, 22 basins, 4 showers, 15 sinks, 15 clothes washers, 15 dishwashers, 20 floor drains, and 4 hose bibs. Second floor: Install 18 water closets, 14 tubs, 26 basins, 7 showers, 18 sinks, 18 clothes washers, 18 dishwashers, 18 floor drains, and 0 hose bibs. Electrical: Temporary service, 3-phase, 400 ap, 120/208.
$8.5M6-10 Glenville St., Zone 2 A: First-floor space for future tenant. Interior alterations to create 33 residential units. State education fee paid: $2207.66. HVAC: At 6-10 Glenville St., supply and install 38 hydro air systems for 32 apartments with all necessary ductwork per plans; supply and install hydro piping only, boiler by others; supply and install garage exhaust fan with all necessary ducting per plans. Plumbing: Basement: 1 water closet, 1 basin, 2 urinals, 2 floor drains, 4 hose bibs. First floor: Install 15 water closets, 15 tubs, 22 basins, 4 showers, 15 sinks, 15 clothes washers, 15 dishwashers, 20 floor drains, and 4 hose bibs. Second floor: Install 18 water closets, 14 tubs, 26 basins, 7 showers, 18 sinks, 18 clothes washers, 18 dishwashers, 18 floor drains, and 0 hose bibs. Electrical: Temporary service, 3-phase, 400 ap, 120/208.
$8.5M6-10 Glenville St., Zone 6, third floor south. Interior alterations to create 33 residential units. State education fee paid: $2,207.66. HVAC, 6-10 Glenville St.: Supply and install 38 hydro air systems for 32 apartments, with all necessary ductwork per plans; supply and install hydro piping only, boiler by others; supply and install garage exhaust fan with all necessary ducting per plans. Plumbing: Basement: 1 water closet, 1 basin, 2 urinals, 2 floor drains, and 4 hose bibs. First floor: Install 15 water closets, 15 tubs, 22 basins, 4 showers, 15 sinks, 15 clothes washers, 15 dishwashers, 20 floor drains, and 4 hose bibs. Second floor: Install 18 water closets, 14 tubs, 26 basins, 7 showers, 18 sinks, 18 clothes washers, 18 dishwashers, 18 floor drains, and 0 hose bibs. Electrical: Temporary service, 3-phase, 400 ap, 120/208.
$8.5M6-10 Glenville St. International Building Code (IBC) 2015. Interior alterations to create 33 residential units. State education fee paid: $2207.66. HVAC, 6-10 Glenville St.: Supply and install 38 hydro air systems for 32 apartments, with all necessary ductwork per plans; supply and install hydro piping only, with boiler by others; supply and install garage exhaust fan with all necessary ducting per plans. Amendment #1, 5/14/21: value $12,000; fee $243.12. Office renovation on the first floor, including walls, acoustical ceilings, carpet, lights, electric, and fire protection. Plumbing, basement: 1 water closet, 1 basin, 2 urinals, 2 floor drains, and 4 hose bibs. Plumbing, first floor: Install 15 water closets, 15 tubs, 22 basins, 4 showers, 15 sinks, 15 clothes washers, 15 dishwashers, 20 floor drains, and 4 hose bibs. Plumbing, second floor: Install 18 water closets, 14 tubs, 26 basins, 7 showers, 18 sinks, 18 clothes washers, 18 dishwashers, 18 floor drains, and 0 hose bibs. Plumbing (2): New fire sprinkler system. Electrical: Temporary service, 3-phase, 400 ap, 120/208. Electrical (2): Low-voltage wiring for video and network. Electrical (3): Install security systems, including 9 card readers, 9 electrical strikes, 8 cameras, and 3 intercom panels.
$8.5M6-10 Glenville St., Zone 9, third floor north. Interior alterations to create 33 residential units. State education fee paid: $2,207.66. HVAC, 6-10 Glenville St.: Supply and install 38 hydro air systems for 32 apartments, with all necessary ductwork per plans; supply and install hydro piping only, with boiler by others; supply and install garage exhaust fan with all necessary ducting per plans. Plumbing: Basement: 1 water closet, 1 basin, 2 urinals, 2 floor drains, and 4 hose bibs. First floor: Install 15 water closets, 15 tubs, 22 basins, 4 showers, 15 sinks, 15 clothes washers, 15 dishwashers, 20 floor drains, and 4 hose bibs. Second floor: Install 18 water closets, 14 tubs, 26 basins, 7 showers, 18 sinks, 18 clothes washers, 18 dishwashers, 18 floor drains, and 0 hose bibs. Electrical: Temporary service, 3-phase, 400 ap, 120/208.
$8.5M6-10 Glenville St. – Zone 3 – Garage lobby. Interior alterations to create 33 residential units. State education fee paid: $2,207.66. HVAC: At 6-10 Glenville St., supply and install 38 hydro air systems for 32 apartments, with all necessary ductwork per plans; supply and install hydro piping only, with boiler by others; and supply and install a garage exhaust fan with all necessary ducting per plans. Plumbing: Basement: 1 water closet, 1 basin, 2 urinals, 2 floor drains, and 4 hose bibs. First floor: Install 15 water closets, 15 tubs, 22 basins, 4 showers, 15 sinks, 15 clothes washers, 15 dishwashers, 20 floor drains, and 4 hose bibs. Second floor: Install 18 water closets, 14 tubs, 26 basins, 7 showers, 18 sinks, 18 clothes washers, 18 dishwashers, 18 floor drains, and 0 hose bibs. Electrical: Temporary service, 3-phase, 400 ap, 120/208.
$8.5M6-10 Glenville St., Zone 6, third-floor north. Interior alterations to create 33 residential units. State education fee paid: $2,207.66. HVAC: At 6-10 Glenville St., supply and install 38 hydro air systems for 32 apartments with all necessary ductwork per plans; supply and install hydro piping only, with boiler by others; supply and install garage exhaust fan with all necessary ducting per plans. Plumbing: Basement: 1 water closet, 1 basin, 2 urinals, 2 floor drains, and 4 hose bibs. First floor: Install 15 water closets, 15 tubs, 22 basins, 4 showers, 15 sinks, 15 clothes washers, 15 dishwashers, 20 floor drains, and 4 hose bibs. Second floor: Install 18 water closets, 14 tubs, 26 basins, 7 showers, 18 sinks, 18 clothes washers, 18 dishwashers, 18 floor drains, and 0 hose bibs. Electrical: Temporary service, 3-phase, 400 ap, 120/208.
$8.5M6–10 Glenville St., Zone 8, second-floor north. Interior alterations to create 33 residential units. State education fee paid: $2,207.66. HVAC: At 6–10 Glenville St., supply and install 38 hydro air systems for 32 apartments, with all necessary ductwork per plans; supply and install hydro piping only, with boiler by others; supply and install garage exhaust fan with all necessary ducting per plans. Plumbing: Basement: 1 water closet, 1 basin, 2 urinals, 2 floor drains, and 4 hose bibs. First floor: Install 15 water closets, 15 tubs, 22 basins, 4 showers, 15 sinks, 15 clothes washers, 15 dishwashers, 20 floor drains, and 4 hose bibs. Second floor: Install 18 water closets, 14 tubs, 26 basins, 7 showers, 18 sinks, 18 clothes washers, 18 dishwashers, 18 floor drains, and 0 hose bibs. Electrical: Temporary service, 3-phase, 400 ap, 120/208.
$8.5M6-10 Glenville St., Zone 2. First-floor interior alterations under IBC 2015 to create 33 residential units. State education fee paid: $2207.66. HVAC, 6-10 Glenville St.: Supply and install 38 hydro air systems for 32 apartments, with all necessary ductwork per plans; supply and install hydro piping only, with boiler by others; and supply and install a garage exhaust fan with all necessary ducting per plans. Plumbing: Basement: 1 water closet, 1 basin, 2 urinals, 2 floor drains, and 4 hose bibs. First floor: Install 15 water closets, 15 tubs, 22 basins, 4 showers, 15 sinks, 15 clothes washers, 15 dishwashers, 20 floor drains, and 4 hose bibs. Second floor: Install 18 water closets, 14 tubs, 26 basins, 7 showers, 18 sinks, 18 clothes washers, 18 dishwashers, 18 floor drains, and 0 hose bibs. Electrical: Temporary service, 3-phase, 400 ap, 120/208.
$8.5M6-10 Glenville St., Zone 1, garden level: Core and shell space for a future tenant under a separate building permit. Interior alterations to create 33 residential units. State education fee paid: $2207.66. HVAC, 6-10 Glenville St.: Supply and install 38 hydro air systems for 32 apartments with all necessary ductwork per plans; supply and install hydro piping only, with boiler by others; supply and install garage exhaust fan with all necessary ducting per plans. Plumbing: Basement: 1 water closet, 1 basin, 2 urinals, 2 floor drains, 4 hose bibs. First floor: Install 15 water closets, 15 tubs, 22 basins, 4 showers, 15 sinks, 15 clothes washers, 15 dishwashers, 20 floor drains, and 4 hose bibs. Second floor: Install 18 water closets, 14 tubs, 26 basins, 7 showers, 18 sinks, 18 clothes washers, 18 dishwashers, 18 floor drains, and 0 hose bibs. Electrical: Temporary service, 3-phase, 400 ap, 120/208.
$8.5M6-10 Glenville St., Zone 5, second floor north. Interior alterations to create 33 residential units. State education fee paid: $2207.66. HVAC: At 6-10 Glenville St., supply and install 38 hydro air systems for 32 apartments with all necessary ductwork per plans; supply and install hydro piping only, with boiler by others; supply and install garage exhaust fan with all necessary ducting per plans. Plumbing: Basement: 1 water closet, 1 basin, 2 urinals, 2 floor drains, and 4 hose bibs. First floor: Install 15 water closets, 15 tubs, 22 basins, 4 showers, 15 sinks, 15 clothes washers, 15 dishwashers, 20 floor drains, and 4 hose bibs. Second floor: Install 18 water closets, 14 tubs, 26 basins, 7 showers, 18 sinks, 18 clothes washers, 18 dishwashers, 18 floor drains, and 0 hose bibs. Electrical: Temporary service, 3-phase, 400 ap, 120/208.
$8.5MInterior demolition. State education fee paid: $32.50. Plumbing: furnish labor for demolition of plumbing.
$125KConstruct a new Pre-K classroom building and faculty apartment on the second floor, with landscaping site improvements. State education fee paid: $468.00.
$1.8MWith 2016 CT Amend. Construct new Pre-K classroom building and faculty apartment on second floor with landscaping site improvements. State education fee paid: $468.00. Plumbing: Basement: 2 new water closets, 1 new sink, 3 new basins; underslab pipe, incast iron pipe, and stub-up for upper floors.
Addition to the Toby House and renovation. State education fee paid: $1222. Electrical: 100-amp temporary service. Amendment (2/23/18): 280 devices installed; new 800-amp service; lighting, fire alarm, telephone/data, site lighting, and outlets. Electrical (2): run wire and install equipment. CCTV/security. Electrical (3): 200-amp service. Plumbing: furnish labor and material to install underground piping for new plumbing system. Amendment (4/2/18): Basement: 2 new floor drains. First floor: 5 new water closets, basins, 4 new floor drains, 2 new urinals, hose bibs, 1 new wnk., and dishwasher; gas piping for HVAC equipment. Plumbing (2): install fire service piping from curb stop into building; install 2" domestic water from new 6" to 2" meter pit and continue 2" into building. Plumbing (3): fire protection system in old/existing and new construction from inside building foundation. HVAC: all work as per plans and specifications on file; air handlers, fanc, boilers, venting, ductwork and distribution, underground ductwork, hydronic piping, and underground hydronic piping. HVAC (2): install 2 racks to house 8 120 gallon LP tanks (temporary heat for construction).
$4.7MAddition to the Toby House and renovation. State education fee paid: $1222. Electrical: 100-amp temporary service. Plumbing: Furnish labor and material to install underground piping for new plumbing system.
Zone 2. Addition to the Toby House and renovation. State education fee paid: $1222. Electrical: 100-amp temporary service. Plumbing: Furnish labor and material to install underground piping for the new plumbing system.
$4.7MZone 1. Addition to the Toby House and renovation. State education fee paid: $1222. Electrical: 100-amp temporary service. Plumbing: Furnish labor and material to install underground piping for a new plumbing system.
$4.7MNew construction of a parking lot retaining wall. State education fee paid: $32.50.
$125KAddition to the Toby House and renovation. State education fee paid: $1222. Electrical: 100-amp temporary service. Plumbing: furnish labor and material to install underground piping for a new plumbing system.
$4.7MLessee: Ashforth Company. Replacement/maintenance of curbing and pavers at the courtyard between GP1 and GP2. State education fee paid: $20.00.
$100KInterior renovation to the main level and first-floor lobbies. State education fee paid: $24.44.
$94KLessee: SVP Global Corporate. Interior fit-out on the second floor. State education fee paid: $35.10.
$135KConstruct an inground swimming pool and required safety barrier. Fencing and safety devices must comply with the state building code. State education fee paid: $208. Per Section AG 106.1, CSBC, and Section 4.3, APSP-7, any pool, spa, or hot tub with a broken, loose, or missing suction outlet cover shall be immediately placed out of service until repairs or replacement are completed with an approved outlet cover. In accordance with Section 6.1 of the APSP-7 Standard, periodic evaluation, testing, and maintenance of covers/grates and suction entrapment avoidance systems (including SRVS devices) and components shall be performed, and covers/grates and systems and components shall be replaced, by a person licensed (CT SPB or SB1 license) in accordance with applicable manufacturer's instructions and CT state codes.
$800KPartial second-floor renovation: 600 SF. State education fee paid: $14.56.
$56KLessee: Cook Pine Capitol Partial interior renovation of existing office space(3,000 SF.) State Ed. Fee pf.: $78.00 HVAC: 5 new water source heat pumps, new duct and insulation, new RGD's electrical: - install new 480 volt feed to 75kv4 transformer with new 100-amp 120-208 v panel; install 30 new receptacles, 40 new lights in drop ceiling electrical (2): data networking lines, run and connected PLUMB: Second floor: 1 nw: sink; rough in and install pantry sink, 20 gallon. Wtr. Htr. In ceiling.
$300KInterior lobby renovation on the first floor–tenant fit-out. State education fee paid: $89.70.
$345KAddition and remodel of clubhouse building. State education fee paid: $546.00.
$2.1MNew construction of a pool kiosk. State education fee paid: $36.40.
$140KNew construction of a pool kiosk. State education fee paid: $36.40. Electrical: 100-amp temporary service. Amendment (2/24/17): 30 devices installed; new underground 100-amp service, 30 devices installed, and low-voltage wiring.
Exterior alterations. State education fee paid: $75.40.
$290K