32 Weed Ave
Norwalk, CT- 2021Mechanical
Furnish and install a bathroom exhaust.
$3K - 2021Plumbing
Rough in and finish two bathrooms with cast iron and copper; 2 toilets, 2 sinks, and 2 showers.
$8K
Local provider profile
Documented work across Connecticut based on attributed municipal records.
Contact information
These details have not necessarily been claimed or independently confirmed by the provider.
No contact information was found in the available records.
Work history
Individual records are grouped by address. Totals include only values reported in public records and may not equal final construction cost.
Furnish and install a bathroom exhaust.
$3KRough in and finish two bathrooms with cast iron and copper; 2 toilets, 2 sinks, and 2 showers.
$8KFurnish and install one water source heat pump and ductwork for a commercial space in a mall.
$25KInstall 1 lavatory sink, 1 toilet, 5 sinks, 1 soiled sink.
$45KMove med gas in existing space; install 1 lavatory sink, 1 toilet, 5 sinks, 1 soiled sink.
$45KDemolition of existing ductwork and modifications to ductwork to support new floor plan; install new split system air conditioning unit with hot water heating to support new bi-plane cath lavatory Install new split system A/X cooling only for mechanical equipment; modify and install new HVAC controls for area.
$65KPlumbing - 1 toilet, 2 sinks w copper water, cast iron drain and vents.
$9.8KPlumbing: install bathrooms and exam sinks.
$45KMechanical: Install ductwork and VAVs.
$105KMechanical work for cardiac rehabilitation space.
$83KPlumbing - Cardiac Re-hab area - 3 water closets, 3 lavs, 4 sinks and 1 mop sink.
$40KFirst floor: 1 water closet, shower, laundry tub, and floor drain; 2 sinks. Demolish existing bathroom. New cast iron waste and vent, new copper L water piping, and new plumbing fixtures.
First floor: 2 new sinks; install owner-supplied sinks and faucets, PVC waste and vent piping, and copper L domestic water piping.
First floor: 1 water closet, sink, and laundry tub. Second floor: 5 water closets, 6 sinks, 1 laundry tub, and 2 showers. New cast-iron waste and vent piping, new copper “L” water piping, and new black malleable gas piping.
Basement: 2 new water closets, 1 new sink, and 3 new basins; underslab pipe, cast iron pipe, and stub-up for upper floors. Amendment (1/29/19): First floor: 3 new water closets, 1 new basin, sink, dishwasher, 1 floor drain, and 2 hose bibs. Second floor: 1 new tub, basin, shower, clothes washer, and dishwasher; 2 new sinks; with copper water and PVC drains.
Second, third, and fourth floors: 1 water closet, tub, shower, laundry tub, and floor drain; 2 sinks. First floor: 1 water closet, tub, shower, laundry tub, and floor drain; 2 sinks. Drain and vents in PVC and cast iron; water in copper and PEX.
Make safety for demo of bathroom. Amendment (12/12/16): basement: 1 water closet, sink,; First floor: 6; water closets, 5 sinks, 2 laundry tub; Second floor: 5 water closets, 4 sinks, 2: floor-drns., 1 laundry tub, urinal.