214 Clapboard Ridge Rd
Greenwich, CT- 2020Demolition
Demolish single-family dwelling. Disposal site: Triple A. State education fee paid: $6.50.
$25K
Local provider profile
Documented work across Connecticut based on attributed municipal records.
Contact information
These details have not necessarily been claimed or independently confirmed by the provider.
No contact information was found in the available records.
Work history
Individual records are grouped by address. Totals include only values reported in public records and may not equal final construction cost.
Demolish single-family dwelling. Disposal site: Triple A. State education fee paid: $6.50.
$25KDemolition of accessory structure. State education fee paid: $3.12.
$12KDemolition of modular classroom. Disposal site: City Carting. State education fee paid: $4.16.
$16KInstall new parking areas and retaining walls. State education fee paid: $32.24. Electrical: 20 light poles and lights; pipe between pole bases with PVC conduit.
$124KNew construction of retaining walls with site lighting and parking lot expansion. State education fee paid: $21.32. Electrical: parking lot lighting, 14 new pole bases, 14 new pole lights, and island driveway gate system.
$32KDemolition of a single-family dwelling. Disposal site: City Carting. State education fee paid: $3.90 (5% $9.75).
$15KDemolition of a single-family residence. Disposal site: SA and Dumn Co. LLC. State education fee paid: $19.50.
$75KDemolish the existing retaining wall and construct a new interlocking block retaining wall. State education fee paid: $42.64.
$164KDemolition of a single-family dwelling. Disposal site: City Carting. State education fee paid: $7.80 (5% $19.50).
$30KDemolition: Single-family house. Disposal site: B and S Carting, 3 Viaduct Rd., Stamford, CT. State education fee paid: $1.30.
$5K