Documented work across Connecticut based on attributed municipal records.

Reported work volume$10.3MDocumented jobs
Average project$1.1MWhere values are reported
First observed2015Available dataset
Categories5Observed work types
Used for work inGreenwich12 jobs

Contact information

Details found in public records

These details have not necessarily been claimed or independently confirmed by the provider.

No contact information was found in the available records.

Work history

Documented work by property

Individual records are grouped by address. Totals include only values reported in public records and may not equal final construction cost.

Satellite view of 200 W Putnam Ave, Greenwich, CTSatellite view
2018

200 W Putnam Ave

Greenwich, CT
  • 2018New Construction

    Rock retaining wall on the back side of the sidewalk along West Putnam Ave and Prospect St. State education fee paid: $31.46.

    $121K
  • 2015Addition

    Auto service building: Add two service drop-off lanes, re-grade ramps, and add to the lower and first floors. State education fee paid: $655.20. 12.31.18 final value: $1,197,000; fee: $18,266.22. HVAC: Demolition of existing duct and 1 AHU. New exhaust fans; 4 electric heaters; 1 ductless split unit; RGD's; balance; controls. Plumbing: Alterations to the fire sprinkler system related to renovation/alterations. Electrical: 220 devices installed; replace distribution panels; reuse main 800-amp switch; install new lighting, power, low voltage, and fire alarm systems per NEC 2014 codes.

    $2.5M
  • 2015Renovation

    Annex building: Install rooftop mechanicals, roof screening, and new roof facade. State education fee paid: $88.14. Amendment #1: 2.22.16, no fee; change scope of work. Amendment #2: 11.16.16, fee $40; HVAC M-2 value engineering revisions. Electrical: 60 devices installed; 400-amp service; demolish existing electrical systems; install new power and lighting requirement, new 400-amp, 3 phase service, low-voltage and fire alarm wiring. Electrical (2): Install 3 phase, 20-amp circuit for vehicle exhaust system. HVAC: Install 1 hot water heater. Amendment (11/21/16): 1 vehicle exhaust system. Plumbing: First floor: 3 new water closets, 5 new sinks, 1 new laundry tub, 2 new urinals, floor drains; Second floor: 5 new water closets, 4 new sinks, 1 new laundry tub; all water, DWV, gas, roof drains.

    $339K
Satellite view of 181 W Putnam Ave, Greenwich, CTSatellite view
2017

181 W Putnam Ave

Greenwich, CT
  • 2017F/O ANA MIXD

    Remove bathroom from and relocate John Addington House. State education fee paid: $20.02.

  • 2017New Construction

    New construction of a detailing building. State education fee paid: $86.84. HVAC: gas-fired infrared tube heater and exhaust. Plumbing: First floor: 1 new water closet, sink, and urinal; 5 new floor drains; 4 new hose bibs; new water piping; PVC drain and vent piping. Electrical: Install new LED light fixtures, receptacles, switches, and fire alarm; 200-amp service.

    $334K
  • 2017Plumbing

    New construction of a detailing building. State education fee paid: $86.84. Plumbing, First floor: 1 new water closet, sink, and urinal; 5 new floor drains; 4 new hose bibs; new water piping, PVC drain and vent piping.

  • 2017Addition

    Remove bathroom from and relocate John Addington House. State education fee paid: $20.02.

    $77K
  • 2015Addition

    New construction of a parking deck and expansion of the existing sales building. State education fee paid: $1,209.00. HVAC: 5 Trane rooftop units; all associated ductwork and diffusers. Plumbing: First floor: 8 new water closets, 6 new basins, 2 new sinks, urinals, and floor drains. Second floor: 6 new water closets, 4 new basins, 2 new sinks, urinals, and floor drains. Piping, storm, gas, and water for the building. Plumbing (2): Alterations to the existing fire sprinkler system for building renovations. Prints and specifications in file. BB. Electrical: 800-amp service; 180 devices installed. Demolition of existing electrical systems; new wiring for general power and lighting; low-voltage cabling; fire alarm system. Electrical (2): Install head end for music, including music player and amplifiers; install speakers.

    $4.7M
  • 2015Addition

    New construction of a parking deck and expansion of the existing sales building. State education fee paid: $1,209.00.

Satellite view of 241 W Putnam Ave, Greenwich, CTSatellite view
2016

241 W Putnam Ave

Greenwich, CT
  • 2016Renovation

    Interior renovations and replacement of facade. State education fee paid: $384.80. HVAC: new duct insulation, new RTU, and exhaust fan. Electrical: existing 400-amp service; refeed existing 400-amp service with new feeders, fire alarm panel and devices; new lighting control panel and new fire alarm; new panels; generator termination cabinet; new RTU/generator transfer switch; plugs, switches, and lights; floor boxes; 4" conduit from building to pole; lifts; shop outlets; overhead garage door; emergency lighting. Plumbing: First floor: 4 new water closets, 1 new basin, 3 new sinks, 1 new urinal, 2 new floor drains, and hose bibs; all new DWV and water piping, and new fixtures; relocate gas to 2 HVAC units. Plumbing (2): alterations to fire sprinkler system.

    $1.5M
Satellite view of 180 W Putnam Ave, Greenwich, CTSatellite view
2015

180 W Putnam Ave

Greenwich, CT
  • 2015New Construction

    New construction of a retaining wall under the 2003 IBC. State education fee paid: $13.00.

    $50K
  • 2015Renovation

    Convert existing office space to auto service and renovate the exterior. State education fee paid: $182.00. Amendment #1 (8.24.16): $40 fee for interior and exterior work. Final value (12.9.16): $225,000; fee: $3,433.50. HVAC: Sheet metal ductwork, all interior diffusers, and exhaust fans; indoor work only (no outside work). Amendment (9/13/16): 2 rooftop air conditioning units. Prints in file (BB). HVAC (2): Add general exhaust fan for shop area. Plumbing: Basement: 1 water closet and 2 sinks. First floor: 2 water closets, sinks, and 1 urinal. Install gas line. Plumbing (2): Install sprinkler protection. Prints and specifications in file. BB electrical: 200-amp service, 35 ft. Utility pole, and 200-amp 3 om 208/120v temporary service. Amendment (4/28/16): Install new receptacle circuits, new lighting circuits, new rooftop unit circuits, and a new complete fire alarm. Existingto remain.

    $700K