75 Holly Hill Ln
Greenwich, CT- 2021Electrical
100 devices installed: 40 lights, 15 switches, 19 duplex outlets, 6 GFCIs, 4 dedicated outlets, hot water feed, 1 panel relocation, 1 new panel, 8 horn strobes, 5 exit signs, and 1 call-for-aid.
Local provider profile
Documented work across Connecticut based on attributed municipal records.
Contact information
These details have not necessarily been claimed or independently confirmed by the provider.
No contact information was found in the available records.
Work history
Individual records are grouped by address. Totals include only values reported in public records and may not equal final construction cost.
100 devices installed: 40 lights, 15 switches, 19 duplex outlets, 6 GFCIs, 4 dedicated outlets, hot water feed, 1 panel relocation, 1 new panel, 8 horn strobes, 5 exit signs, and 1 call-for-aid.
2 devices installed; demo 2 switches, re. Install 1 swtch., add furniture feed, relocate 1 2 x 2.
20 devices installed; buildout of 2 rooms with 6 downlights, 2 pendants, 3 switches, 3 outlets, 2 data drops, 2 smoke detectors, 2 strobes, and small demolition.
65 devices installed; relocate 40 lights and a 100-amp panel; add 10 outlets; relocate 6 switches and add, 2 switches; relocate in-floor power system; relocate 3 horn strobes and 2 outlets; no teledata work; provide light demo.
22 devices installed; new installation of plugs, switches, and lights.
70 devices installed: 17 2-by-2-foot lights, 4 outlets, 8 outlets, 8 switches, 26 Cat6 drops, a call-for-aid device in the bath, wiring for 2 VAV/HVAC boxes, and 2 exit signs.
25 devices installed; install 8 outlets, relocate, 4 lights, add 6 downlights, and add 10 data lines. Install 2 switches and a submeter; relocate the existing electrical panel; separate circuits where the demising wall is located.
Bathrooms: 5 devices installed; add 1 switch, add 1 GFI, wire on exhaust fan, and add 2 downlights.
Demolish 1 pendant light and 2 track lights; install 4 recessed lights and 2 sconces in new vestibule.
60 devices installed; change out 50 lights; install 2 switches; round 6 data lines; install 6 outlets; demolish 20 lights; change 2 empacks.
58 devices installed: wired exhaust fan, 29 lights, 6 quad outlets, 5 switches, 8 outlets, and 1 call for aid; relocated horn/strobe; added new horn/strobe; relocated existing exits; GFI.
Install 29 lights, 15 outlets, 3 emergency packs, 2 exits, 10 switches, 2 fire alarm horn strobes, 2 pull stations, and 1 dryer circuit, and using the existing 400-amp panel.