53 Dunn Ave
Stamford, CT2019Mechanical
Finish the existing basement and add a bathroom. Enclose the existing laundry and mechanical room. Replace the existing garage door with a wall and sliding door. Use the existing HVAC system already in the basement. This project will also require electrical and plumbing permits.
$31.3K