Interior demolition and partial framing. Replace 12 windows and the front door. Partial electrical and plumbing work. New HVAC, kitchen cabinet, spray foam insulation, hardwood floor, 3 bathrooms, laundry room, drywall, interior doors, and trim. An average of 1800 SF. New roof with partial framing and exterior work with partial siding. Revised to add a second-floor addition for a new laundry room and bathroom.
Restore the first floor, second floor, roof, windows, and siding of the fire-damaged home. 7/16/19 revision: Add legalization of the finished basement and 108 Sft to the rear of the house.