Skip to content

Local provider profile

Benco LLC

Documented work across Connecticut based on attributed municipal records.

Reported work volume$1.1MDocumented jobs
Average project$181KWhere values are reported
First observed2019Available dataset
Categories2Observed work types
Used for work inGreenwich4 jobsStamford2 jobs

Contact information

Details found in public records

These details have not necessarily been claimed or independently confirmed by the provider.

No contact information was found in the available records.

Work history

Documented work by property

Individual records are grouped by address. Totals include only values reported in public records and may not equal final construction cost.

Satellite view of 0 Summer St, Stamford, CTSatellite view
2021

0 Summer St

Stamford, CT
  • 2021Roofing

    Remove existing roofing system to the deck, furnish and install densdeck, 090 black EPDM, flash all penetrations.

    $160K
Satellite view of 65 Glenbrook Rd, Stamford, CTSatellite view
2020

65 Glenbrook Rd

Stamford, CT
  • 2020Roofing

    Remove and replace the EPDM roofing system damaged by Tropical Storm Isaias on 8/4/2020. Remove the damaged insulation and membrane, and furnish and install new tapered insulation and 060 Black EPDM using the fully adhered method.

    $160K
Satellite view of 5 Putnam Hill Bldg 5, Greenwich, CTSatellite view
2019

5 Putnam Hill Bldg 5

Greenwich, CT
  • 2019Renovation

    Building. #5, IBC 2015. Remove existing roof and apply hot mop directly to wood deck. New EPDM roof system with new insulation, flashing, and sheet metal to meet building and state code. State education fee paid: $49.92.

    $192K
Satellite view of 2 Putnam Hill Bldg 2, Greenwich, CTSatellite view
2019

2 Putnam Hill Bldg 2

Greenwich, CT
  • 2019Renovation

    Building. 2 IRC 2015. Remove existing roofing and apply BUR hot mop directly to the wood deck. Finish and install a new roofing system, including new insulation, flashing, and sheet metal, to meet building state code. State education fee paid: $49.92.

    $192K
Satellite view of 4 Putnam Hill Bldg 4, Greenwich, CTSatellite view
2019

4 Putnam Hill Bldg 4

Greenwich, CT
  • 2019Renovation

    Building. 4 IBC 2015, IRC 2015. Remove existing roofing and apply BUR hot mop directly to wood deck. Finish and install new roofing system, including new insulation, flashing, and sheet metal, to meet building state code. State education fee paid: $49.92.

    $192K
Satellite view of 1 Putnam Hill Bldg 1, Greenwich, CTSatellite view
2019

1 Putnam Hill Bldg 1

Greenwich, CT
  • 2019Renovation

    Building. #1 IBC 2015. Remove existing roof and apply hot mop directly to wood deck. New EPDM roof system with new insulation, flashing, and sheet metal to meet building state code. State education fee paid: $49.92.

    $192K