Skip to content

Local provider profile

Bolton Construction Llc

Documented work across Connecticut based on attributed municipal records.

Reported work volume$1.6MDocumented jobs
Average project$199KWhere values are reported
First observed2017Available dataset
Categories3Observed work types
Used for work inDarien5 jobsGreenwich2 jobsNorwalk1 jobs

Contact information

Details found in public records

These details have not necessarily been claimed or independently confirmed by the provider.

No contact information was found in the available records.

Work history

Documented work by property

Individual records are grouped by address. Totals include only values reported in public records and may not equal final construction cost.

Satellite view of 5 Gregory Ct, Norwalk, CTSatellite view
2025

5 Gregory Ct

Norwalk, CT
  • 2025Build New Const Res

    Superstructure s.f.r with 1 car garage, 3 bedroom, 2 1/, 2 bathroom.

    $900K
Satellite view of 18 Archer Ln, Darien, CTSatellite view
2024

18 Archer Ln

Darien, CT
  • 2024Addition

    Residential additions/alterations.

    $20K
  • 2023Addition

    Residential additions/alterations.

    $200K
Satellite view of 35 Pine Ridge Rd, Greenwich, CTSatellite view
2018

35 Pine Ridge Rd

Greenwich, CT
  • 2018Renovation

    Enlarging Kitchen by removing 1 bedroom and full bathroom; No Change in Footprint. State Ed. Fee paid.: $20.80 6.22.18 Change of Contractor $40 Amend #1: 8.30.18 fee $40 reframe portion of roof electrical: 35 devices installed; 1: oven, dishwasher PLUMB: First floor: 2 sinks, 1 clothes washer, hose bibs; move rough plumb. For first floor. Laundry and laundry sink, pex, pvc pipe; move location for island sink, pex and pvc pipe; move hose bibb line HVAC: install Lennox mini split heat pump for kitchen addition.

    $80K
Satellite view of 8 Park Ave, Greenwich, CTSatellite view
2017

8 Park Ave

Greenwich, CT
  • 2017Renovation

    Sistering joists per engineer-stamped drawings to arrest the sinking of the floor, in accordance with the 2012 IRC. State education fee paid: $6.50. 3.22.18: Change of Contractor, $40. Amendment #1: 3.22.18, value $60,000, fee $835.60. New front entry electrical: 10 devices; wire to front foyer addition.

    $25K