19 Spring Hill Ave
Norwalk, CT- 2024Electrical
Wire a new layout in the basement.
$2.5K
Local provider profile
Documented work across Connecticut based on attributed municipal records.
Contact information
These details have not necessarily been claimed or independently confirmed by the provider.
Work history
Individual records are grouped by address. Totals include only values reported in public records and may not equal final construction cost.
Wire a new layout in the basement.
$2.5KElectrical Work
Wire the basement to code with lighting, outlets, and switches. Install a subpanel for power.
$5KElectrical work for a kitchen renovation: rewire the house to code in areas of construction, install a new electrical panel, and install smoke detectors to code.
$10KInstall a new 24 kW generator.
$5KWire the new garage and mudroom to code, including lighting, switches, and outlets.
$5KElectrical Work
Install a new 100 amp temporary service.
$500Electrical Work
$500Electrical Work
Electrical Work
Electrical Work
Electrical Work
Rewire the existing basement to code with lighting outlets and switches.
$5KRewire the bathroom to code with lighting and switches.
$1.5KRewire the kitchen to a new layout.
$3.5KRewire the kitchen to code with lighting, switches, and outlets.
$5KElectrical Work
Electrical Work
Electrical Work
ELE
Wire new addition to code.
$5KRelocate air conditioning compressor, disconnects and wiring, 3/4 bathroom rewire.
$2KElectrical Work
Rewire new bathroom to code.
$5KELE
ELE
ELE
ELE
ELE
ELE
Electrical Work
ELE
ELE
$1KELE
Wire the new addition to code; relocate the existing service (200-amp. 30 switches, 50 outlets, 15 t fixtures.
6 devices installed; 1 pool equipment; existing 200-amp service; wire new pool equipment.
6 devices installed; 1 pool equipment; wire new pool equipment.
Electrical: Wire new addition to code.
$5KElectrical - install 100amp temp service.
$1KElectrical - relocate existing service to new house addition - 200amp.
$3KRewire bath to a new layout; 1 switch, 1 light fixture.
50 devices installed; rewire the kitchen to a new layout; rewire Butler's Pantry to a new layout. Existing 400-amp service.
Rewire kitchen to code. Existing 200-amp service. 4 switches, 10 outlets, and 5 light fixtures.
Unit #19B: 50 devices installed; 1 range, clothes dryer, and dishwasher. Rewire unit to code with lighting, outlets, and switches; install smoke detectors to code.
50 devices installed; 1 range, clothes dryer, and dishwasher; rewire apartment to code with outlets, switches, and lighting; install AC/DC smoke detectors to code.
10 devices installed; existing 200-amp service. Install new recessed lights in the laundry; install a new fan and GFI; install outlets and switches to code.
Temporary service for construction. 200-amp.
400-amp underground service. 200 devices installed; 3: rng., clthsdryr, dshwshrs., gasbrnr. Motors, 1: wtr. Htr., 4 air conditioning motors; install outlets to code, lighting to code, switches to code, subpanels.
40 devices installed; replace outlets in classrooms with tamper-proof style on the second floor; replace GFI outlets in baths on the second floor with tamper-proof style; replace GFI outlets in classrooms with tamper-proof style.
100-amp temporary service. Amendment (3/6/20): 120 devices installed; 1: rng., clthsdryr, dishwasher, 2: gasbrnr. Motors, air conditioning motors; 200-ampservice; wire new house, outlets, switches, recessed lights, install smoke and co2 dets.; install new 200-amp o.h. service.
100 devices installed; 1 range, dishwasher; wire remodeled kitchen, bathroom, and mudroom on first floor; wire remodeled master bedroom and bathroom on second floor.
1 device installed, 100-amp service. Amendment (7/17/20): 200 devices., 3: rngs., clthsdryrs., dshwshrs., 4: gasbrnr. Motor 400-amp underground service w 4 meters.; wire new building. To code with outlets and switches; install fire alarm system and wiring.
1 device installed; 1 gas brnr. Motor; wire new heating furnace, replaces old furnace; run thermostat wiring.
$5005 devices installed; service to be changed to 200-amp. Install new meter, new sounding system, and new 200-amp panel.
$2K6 devices installed: 1 pool equipment; wire pool pump, 2 pool lights, and pool cover.
4 devices installed; wire bathroom to code with new bar, lights, and switches.
150 devices installed; 1: rng., clthsdryr, dishwasher, 2 air conditioning motors, 2 gasbrnr. Motors; 200-amp o.h. service; wire house to code with outlets and switches; install smoke detectors and co2 dets. Amendment (5/27/20): 150 devices installed; 1: rng., clthsdryr, dishwasher, 2 air conditioning motors, gasbrnr. Motors; 200-amp service; wire house to code with outlets and switches; install smoke detectors and co2 dets.
Electrical: Upgrade service to 200 amp.
$2KElectrical: rewire the kitchen to code.
$3K50 devices installed; 1: range, clothes dryer, dishwasher, stairway. Amendment (7/25/18): 50 devices installed; 1: oven, clothes dryer, dishwasher; rewire kitchen to code; rewire new stairway and mudroom to code.
15 devices installed;. Add outlets and switches to new divided space; add emergency and exit lights as per code; add electric meter in basement, 100-amp; add new panel on second floor, 100-amp.
75 devices installed; 1: oven, rng-tp, dishwasher.
Install 48 kW generator with transfer switches and piping in a trench from the house to the switch. Plumbing: gas line to generator. Receipt 18-3402 for $40 paid.
$20K75 devices installed; rewire the second floor of the garage; rewire the new mudroom and bathroom; wire the new laundry room.
50 devices installed; 1: rng., dishwasher, 2 air conditioning motors, rewire unit to code with outlets, switches, lighting; install and replace panel; install smoke detectors to code.
40 devices installed; remodel kitchen and 2 bathrooms.
2 devices installed; ; 200-amp temporary service to be installed.
$500150 devices installed; 1 range, oven, clothes dryer, oil burner motor, dishwasher, and pool equipment; 4 air conditioning motors; 400-amp service. Wire new house to code with outlets, switches, and lighting. Install piping to pool panel and install panel. Amendment (1/31/19): service change to 600-amp; 4 devices installed.
20 devices installed; wire pool house with outlets, switches, and lighting; install subpanel.
25 devices installed; 1 dishwasher, 4: gasbrnr. Motors, 4 pool dquipment; wire new garage to code; run subpanel for service.
150 devices installed; 1: rng., clthsdryr, dishwasher, wtr. Htr., 2 air conditioning motors, 200-amp service. Wire new house with outlets, switches, lighting; install smoke detectors to code; install new 200-amp service.
2 devices install new temporary service (100-amp).
$5002 devices installed; reattach 2 boxes to new frames; install new outlets; install new wiring and outlets.
100 devices installed; 1: range, air conditioning motor, dishwasher, gas burner motor; lighting outlets and switches; install smoke detectors.
35 devices installed; 1 air conditioning motor; wire new garage and loft to code; install underground piping from main house to garage; install subpanel in garage.
50 devices installed; rewire the second floor to code; wire the new third floor to code; relocate the subpanel on the second floor.
5 devices installed; 1 pool equipment; provide power for new inground pool; bond all equipment as per code.
Gut and renovate the interior, leaving fixture locations. Maintain all required fire resistance ratings. State education fee paid: $7.80. Plumbing, First floor: 1 water closet, tub, basin, sink, clothes washer, and dishwasher. HVAC: Replace 2 ductless air handlers with new; vent bath fans and dryer. Electrical: 50 devices, install AC/DC smoke detector, and new panel to replace old.
3 devices installed; run underground piping from the house to the garage for new power. Amendment (6/21/17): 25 devices installed; install new underground piping and feed from the house to the garage; install a subpanel in the garage and wire the garage to code.
5 devices installed. 200-amp service.
$1K35 devices installed; install lighting, outlets, and switches to code in the basement renovation.
30 devices installed; replace electrical panel with a new one; rewire bathroom to code.
50 devices installed; wire basement to code with outlets, lighting, and switches.
20 devices installed; install new 100-amp panel, new lighting, new outlets, and new switches.
Gut and renovate interior, leaving fixture locations. Maintain all required fire resistance ratings. State education fee paid: $10.40. Plumbing: First floor: 1 water closet, basin, sink, clothes washer, and dishwasher; Second floor: 1 water closet, basin, and tub. Run gas line to stove, water heater, and air handler. HVAC: Remove existing air handler; new gas-fired furnace and air conditioning; coil in attic; add or alter ductwork; existing condenser to remain; vent bathroom fans and dryer. Electrical: 50 devices; rewire unit to code; install AC/DC smoke detectors; install new panel to replace old.
74 devices installed; 1 clothes dryer, range, and dishwasher; 400-amp existing service; investigate existing work; repair or replace any code violations; install lighting, outlets, and switches to code.
10 devices installed; remove electrical. Heat, remove electric for water htr.; change out outlet for range; rewire air conditioning unit in attic; add outlet for hot water heater.
50 devices installed; 1: range, clothes dryer, air conditioning motors, dishwasher. Install wiring to code for new kitchen/bath remodel; add lighting in living room; add outlets to code in living room; install smoke detectors to code.
75 devices installed; rewire apartment to code; install outlets, switches, and lighting; install smoke detectors.
150 devices installed; 1 oven, dishwasher, clothes dryer, and gas burner. Meter; 200-amp service, overhead; install smoke detectors, wire house.
4 devices installed; 100-amp service; temporary service.
$50010 devices installed; remove electrical. Heat; rewire bathrooms.
100 devices installed; 1 range, clothes dryer, air conditioning motor, gas burner motor, and dishwasher; rewire apartment to code; install smoke and CO2 detectors.
2 devices installed; temporary 100-amp service for construction.
$5004 devices installed; 100-amp temporary service.
$50025 devices installed; wire bathrooms to code; add lighting in areas of remodeling.
100 devices installed; wire new classrooms with lights and outlets; install new lighting and emergency lights; install data cable and jacks.