Ansul Installation Rebuilding deck off the kitchen ground pool. Remove existing per proposed to existing size and configuration. There is an upper level deck coming with stairs going down to a lower level that steps down to an existing in- Upper level requires railings. Lower level deck is under 18" above grade. Framing of both upper and lower decks. Dig & Pour new footings as plan. Reframe both upper and lower decks with 2"x10" Pressure Treated.
Demo of 2 fire Remove and replace deck to verify sprinkler heads to meet coverage existing roof back half of house only. About 11.25 squares of it. Inspect roof that all sheathing is suitable. Install seam tape per Connecticut code. Install water and Ice.
Fire sprinkler work Kitchen renovation installing a peninsula at CES Clasrooms involving the removal of a non load bearing wall to open the kitchen and that will separate the kitchen and dining room. Replacing kitchen.