Skip to content

Local provider profile

Bruce Kelderhouse

Documented work across Connecticut based on attributed municipal records.

Reported work volume$763KDocumented jobs
Average project$153KWhere values are reported
First observed2015Available dataset
Categories2Observed work types
Used for work inGreenwich41 jobs

Contact information

Details found in public records

These details have not necessarily been claimed or independently confirmed by the provider.

Phone
(914)769-8050source record

Work history

Documented work by property

Individual records are grouped by address. Totals include only values reported in public records and may not equal final construction cost.

Satellite view of 1 American Ln, Greenwich, CTSatellite view
2026

1 American Ln

Greenwich, CT
  • 2026Electrical

    Electrical Work

  • 2021Electrical

    ELE

  • 2020Electrical

    Fit-out of 1st and terrace space, including fire alarm, data power, lighting, and new 40 kW UPS system and 200-amp ATS switch. 57 switches, 82 outlets, and 140 light fixtures.

  • 2020Electrical

    Fit out west-side bathrooms. 4 switches, 14 outlets, and 70 light fixtures.

  • 2020Electrical

    Interior fit of office space, including lighting, power, fire alarm, and data. 32 switches, 50 outlets, and 52 light fixtures.

  • 2020Demolition

    60 devices installed; demolition of electrical work; installation of temporary lights and fire alarm heats and speaker strobes.

  • 2020Electrical

    50 devices installed; miscellaneous added fire alarm devices; distribution upgrades of the east and west elevator machine rooms, including ATS switches and associated controls; new pit lighting; switch and outlets; 2 new air conditioning split systems; 2 4800v panels; 2 208v panels; 2 transformers.

    $440K
  • 2019Electrical

    Fit-out of the first floor, southeast area. Approximately 320 devices installed. Amendment (10/17/19): Approximately 320 devices installed; fit-out of the first floor, southeast area, including electrical, fire alarm, and data wiring only.

  • 2019Electrical

    224 devices installed; lighting replacement and miscellaneous power for new tenant space.

  • 2019Demolition

    40 devices installed; safe-off of electrical for demolition of space for future tenant, including installation of temporary heat detectors for temporary fire alarm and miscellaneous temporary lighting.

  • 2018Electrical

    24 devices installed; 2 bathrooms on the first floor, southwest side; miscellaneous power, lighting, and f.a.

  • 2018Electrical

    120 devices installed; renovate the existing main lobby.

  • 2018Electrical

    28 devices installed; miscellaneous lighting applications for the pantry and common area behind the gym terrace level.

  • 2018Electrical

    210 devices installed; miscellaneous electrical modifications to a portion of the second floor. (S/W).

  • 2018Demolition

    Miscellaneous demolition; install 12 new downlights and connect to the existing circuit.

  • 2018Electrical

    966 devices installed; miscellaneous power, lighting, and FA renovations to the existing tenant space on the third floor. Work is being added to the existing permit.

  • 2017Electrical

    12 devices installed; miscellaneous electrical work for gym demising project; relocate lights, new exits.

  • 2017Electrical

    165 devices installed; expansion with power and lighting to match existing 2 phases.

  • 2017Electrical

    6 devices installed; 2 air conditioning motors; wire hvac units on roof.

  • 2017Electrical

    30 devices installed; miscellaneous renovations within existing tenant space.

  • 2017Electrical

    250 devices installed; fit-out on the first floor, northwest side of buildings, approximately 7,000 sq. Power, lighting, fire alarm, and telephone/data.

  • 2017Electrical

    10 devices installed; new egress corridor at the terrace level.

  • 2017Electrical

    18 devices installed; new tenant lobby with lights, outlets, and controls.

  • 2017Electrical

    10 circuits; terrace level east side: install 78 2-cable cat6 data stations with rack and patch panel; feeder for new 45 kW UPS 80 amps. 48 OV, 3 om, 3 w; feeders for 2 split air conditioning systems; 10 20 a 120 v circuits for new furniture.

    $60K
  • 2017Electrical

    24 devices installed on the first floor. New lights, outlet, and fire alarm installed on the west side for a new corridor.

  • 2016Demolition

    Existing electrical; demolition of garage.

  • 2016Electrical

    1 - 1200 devices installed; 45 air conditioning motors; fit-out of space, including lighting, receptacles, and panels.

  • 2016Demolition

    75 devices installed; demolish existing space and install new light fixtures.

  • 2016Electrical

    Installed 40 devices: lights and receptacles in the lobby, with new lighting and power.

  • 2015Electrical

    46 devices installed; new lighting, outlets, and fire alarm in corridor.

Satellite view of 55 Railroad Ave, Greenwich, CTSatellite view
2020

55 Railroad Ave

Greenwich, CT
  • 2020Electrical

    Fit out space with lighting, power, and fire alarm.

  • 2019Electrical

    Lessee: Viking Global. Replace existing 200 kW generator. Plumbing: gas line to generator. Receipt 19-1645 for $180 paid.

    $195K
  • 2017Electrical

    48 devices installed; renovate 4 bathrooms. With new Lighting: 2 on the second floor and 2 on the third floor.

  • 2017Electrical

    318 devices installed; third floor. Power, lighting, fire alarm, and data in selected areas.

  • 2016Electrical

    Install new emergency panel and transformer.

    $12K
  • 2016Electrical

    Install 100 devices. Interior renovation, new lights, receptacles, subpanel, and furniture.

Satellite view of 140 Greenwich Ave, Greenwich, CTSatellite view
2019

140 Greenwich Ave

Greenwich, CT
  • 2019Electrical

    Fourth floor. Low voltage: 105 CAT 6 tele-data jacks to be installed.