1 American Ln
Greenwich, CT- 2026Electrical
Electrical Work
- 2021Electrical
ELE
- 2020Electrical
Fit-out of 1st and terrace space, including fire alarm, data power, lighting, and new 40 kW UPS system and 200-amp ATS switch. 57 switches, 82 outlets, and 140 light fixtures.
- 2020Electrical
Fit out west-side bathrooms. 4 switches, 14 outlets, and 70 light fixtures.
- 2020Electrical
Interior fit of office space, including lighting, power, fire alarm, and data. 32 switches, 50 outlets, and 52 light fixtures.
- 2020Demolition
60 devices installed; demolition of electrical work; installation of temporary lights and fire alarm heats and speaker strobes.
- 2020Electrical
50 devices installed; miscellaneous added fire alarm devices; distribution upgrades of the east and west elevator machine rooms, including ATS switches and associated controls; new pit lighting; switch and outlets; 2 new air conditioning split systems; 2 4800v panels; 2 208v panels; 2 transformers.
$440K - 2019Electrical
Fit-out of the first floor, southeast area. Approximately 320 devices installed. Amendment (10/17/19): Approximately 320 devices installed; fit-out of the first floor, southeast area, including electrical, fire alarm, and data wiring only.
- 2019Electrical
224 devices installed; lighting replacement and miscellaneous power for new tenant space.
- 2019Demolition
40 devices installed; safe-off of electrical for demolition of space for future tenant, including installation of temporary heat detectors for temporary fire alarm and miscellaneous temporary lighting.
- 2018Electrical
24 devices installed; 2 bathrooms on the first floor, southwest side; miscellaneous power, lighting, and f.a.
- 2018Electrical
120 devices installed; renovate the existing main lobby.
- 2018Electrical
28 devices installed; miscellaneous lighting applications for the pantry and common area behind the gym terrace level.
- 2018Electrical
210 devices installed; miscellaneous electrical modifications to a portion of the second floor. (S/W).
- 2018Demolition
Miscellaneous demolition; install 12 new downlights and connect to the existing circuit.
- 2018Electrical
966 devices installed; miscellaneous power, lighting, and FA renovations to the existing tenant space on the third floor. Work is being added to the existing permit.
- 2017Electrical
12 devices installed; miscellaneous electrical work for gym demising project; relocate lights, new exits.
- 2017Electrical
165 devices installed; expansion with power and lighting to match existing 2 phases.
- 2017Electrical
6 devices installed; 2 air conditioning motors; wire hvac units on roof.
- 2017Electrical
30 devices installed; miscellaneous renovations within existing tenant space.
- 2017Electrical
250 devices installed; fit-out on the first floor, northwest side of buildings, approximately 7,000 sq. Power, lighting, fire alarm, and telephone/data.
- 2017Electrical
10 devices installed; new egress corridor at the terrace level.
- 2017Electrical
18 devices installed; new tenant lobby with lights, outlets, and controls.
- 2017Electrical
10 circuits; terrace level east side: install 78 2-cable cat6 data stations with rack and patch panel; feeder for new 45 kW UPS 80 amps. 48 OV, 3 om, 3 w; feeders for 2 split air conditioning systems; 10 20 a 120 v circuits for new furniture.
$60K - 2017Electrical
24 devices installed on the first floor. New lights, outlet, and fire alarm installed on the west side for a new corridor.
- 2016Demolition
Existing electrical; demolition of garage.
- 2016Electrical
1 - 1200 devices installed; 45 air conditioning motors; fit-out of space, including lighting, receptacles, and panels.
- 2016Demolition
75 devices installed; demolish existing space and install new light fixtures.
- 2016Electrical
Installed 40 devices: lights and receptacles in the lobby, with new lighting and power.
- 2015Electrical
46 devices installed; new lighting, outlets, and fire alarm in corridor.