Removing 30 windows in existing openings and replacing with new construction windows. Removing front entry door in existing opening and replacing with new construction door. Removing existing wood siding and replacing with 40 square of new James Hardie siding. Demoing existing portico and framing new portico in existing footprint.
Replace exterior siding with James Hardie siding. Replace asphalt roofing shingles with new asphalt roof shingles; no plans to change the roof deck unless evidence of rot is found. Replace 4 existing skylights in the existing openings. Replace 15 kitchen windows and 1 slider door. Repair the existing portico by replacing rotted lumber with new pressure-treated (PT) lumber and installing PVC trim. Replace asphalt shingles with a standing-seam metal roof on the portico only.
Replace the asphalt roof with new asphalt shingles (27 squares). No plans to replace the roof deck unless evidence of rot. Replace 15 existing windows in existing openings with new construction windows.
Replace asphalt roofing shingles with new asphalt shingles (approximately 25 sq). Replace 5 existing skylights with new VELUX skylights in the same openings (no reframing).
Replace asphalt shingles on one section of the rear roof (18 sq). No roof deck changes are planned unless there is evidence of rot. Replace 6 existing skylights in the same openings; no new openings or reframing are needed.
Roofing · 2022$8,952
Tear off and haul away roofing and one skylight on the right main only left, center and rear mains excluded. install one new velux fixed skylight install 2 courses of ice and water barrier systems from all drip edges, 4 in tape on all exposed seams with wynthetic underlayment. Single course around penetrations and valleys. install swift start starter shingles on all rake and drip edges. install all new aluminum perimeter drip and rake edge metals. install all new aluminum roof boots with neoprene gaskets. install new asphalt shingles best color match available install new shingle vent ii ridge vent on main ridgeline. install matching ridge shinglesremove all burr rsw related construction debris.
Replacing asphalt roof shingles with new asphalt roof shingles (approximately 38 sq). No plans to change the roof deck unless evidence of rot is discovered.
Temporarily support the existing roof structure. Tear out and haul away the deck, posts, and footing due to unrepairable rot. No change to footprint. Install new helical piles to support the entire structure. Frame and finish a new pressure-treated deck with composite decking to support the existing screen porch and roof structure.
Frame and finish a new second-floor bedroom over the kitchen on the existing footprint, with a new en suite bath. Tear down the existing screened porch and rebuild it on the same footprint with a full foundation contiguous to the existing basement and a sunroom above. Tear down the existing deck.
Replace existing exterior siding with James Hardie siding. Replace asphalt shingles on the existing portico, garage apron roof, and screen porch roof only, for a total of 7 sq.
Tear off and haul away roofing on the main house, attached garage, and screen porch. Install two courses of ice and water barrier systems from the drip edge, 4in tape on all exposed seams, and synthetic underlayment. Install new 16oz copper chimney flashings and new 16 oz copper roof-to-sidewall flashings. Remove and re. Install siding as needed. Install Swift Start starter shingles on all rake and drip edges. Install aluminum perimeter drip and rake edge metals, new aluminum roof boots with neoprene gaskets, new asphalt shingles of your choice, and matching ridge shingles.
PERMIT WITHDRAWN on 11/29/22 TEAR OFF ALL EXISTING WOOD SIDING and TRIM ON MAIN HOUSE FULL WINDOW TEAR OUT - HAUL AWAY, and INSTALL 23 DH WINDOWS, 1 PICTURE WINDOW AND 2 CASEMENTSUvalues Casement 0.29 DH 0.30marvin signature windows – white wood interior/clad exterior – 21 6/1 sdl, 2 4/1 sdl- dh windows with spacer bars, 1 picture window and 2 casements no sdl. install all new interior primed window casings to best match existing. install 5/4 x 6 PVC as a capillary break on porches/decks. install custom aluminum capillary break on roof to sidewall. install 5/4 x 4 and 5 hardie-trim corner boards on all corners. install 5/4 x 5/4 PVC inside corner boards on inside corners install 5/4 x 4 hardie trim window casings on all windows and doors. install 1 x 8 hardie-trim on all fascia and rake edges. install smooth surface hardie soffit on eaves. install new gable vents on main and garage extension. install 5/4 x 4 hardie as a cornice crown molding. install James Hardie panel shingle all hardie window and door casings to utilize hidden fastener systeminstallation will conform with current hardie best practice manual. install new 5’ k style gutters and leaders on complete houseremove all related construction related debris.
Roof first for and siding replacement bathroom-demo jaccuzi tub, rough and install new tub and diverter. Rough double vanity. Second bathroom-new diverter for shower. Install fixture for.
Tear Off and Haul Away All Existing Wood Siding, Trim, and Roofing Full Tear-out, Haul Away, and Install Only 4 Customer Supplied Windows And 2 Doors – No Interior Trim/finish Work. Install And Flash New Velux Solar Venting Skylight. Install Ice and Water Barrier Systems On Entire Roof Deck. Install Four New 16oz Copper Chimney Flashings. Install New 16 Oz Copper Roof To Sidewall Flashings. Install Swift Start Starter Shingles On All Rake and Drip Edges. Install All Aluminum Perimeter Drip And Rake Edge Metals. Install All New Aluminum Roof Boots With Neoprene Gaskets. Install New Asphalt Shingles. Install New Shingle Vent Ii Ridge Vent On Main Ridgeline. Install Matching Ridge Shingles. Install New Vp100 Blueskin Wrap On All Sidewall Areas. Install 5/4 x 8 Pvc As A Skirt On The Entire Home. Install 5/4 x 6 Pvc As A Capillary Break On Porches. Install Custom Aluminum Capillary Break On Roof To Sidewall. Install 5/4 x 4 and 5 Hardie-trim Corner Boards On All Corners. Install 5/4 x 5/4 Pvc Inside Corner Boards On Inside Corners. Install 5/4 x 4 Hardie Trim Window Casings On All Windows and Doors. Install 5/4 And 1x Casing On Porch Openings and Finish With Screen Ez System. Install 1x Jambs and 5/4 x 4 Pvc Casing On Garage Doors. Install 1 X Hardie-trim On All Fascia and Rake Edges. Install Smooth Surface Hardie Soffit With Continuous Vent On Eaves. Install T and g Azek Beadboard On Porch Ceiling And Knee Walls. Install 5/4 x 4 Hardie As A Cornice Molding. Install James Hardie Siding.