195 Bedford Rd
Greenwich, CTInterior renovation of master bathroom. New fixtures, tile, and trim. No change to building footprint and no exterior work. State education fee: $13.
$50KLocal provider profile
Documented work across Connecticut based on attributed municipal records.
Work history
Individual records are grouped by address. Totals include only values reported in public records and may not equal final construction cost.
Interior renovation of master bathroom. New fixtures, tile, and trim. No change to building footprint and no exterior work. State education fee: $13.
$50KRemodel existing kitchen; change cabinetry, lighting, appliances, and countertops. State education fee paid: $10.40. Plumbing: First floor: move 1 sink; relocate kitchen sink and retie in gas range. Electrical: Rewire kitchen to code. Existing 200-amp service. 4 switches, 10 outlets, and 5 light fixtures.
$40KInterior renovation of the kitchen and minor interior modifications; replace the HVAC system. State education fee paid: $28.60. Amendment #1, dated 9.9.19: value $20,000; fee $345.20; extend retaining wall. Wall section on sheet D-3 is in our file. HVAC: Install 2 new gas-fired furnaces in the attic and basement; 1 new 50-gallon gas-fired hot water heater (direct vent); and new ductwork. Electrical: 80 devices installed; wire the kitchen and minor interior renovations; wire new HVAC systems; 1 clothes dryer and 2 air-conditioning motors. Plumbing: Basement: 1 clothes washer. First floor: 1 sink. Clean up traps and valves; relocate basement laundry connection; gas pipe to new attic furnace.
$110KRenovate interior of existing house including kitchen, all bathrooms, repartition first floor and replace windows. Construct 111sq.ft. Addition per plans. State ed fee paid $124.80.
$480KInternational Building Code (IBC)–remodel kitchen, with new cabinetry and appliances. Upgrade lighting throughout the house. State education fee paid: $19.50. Electrical: new kitchen; lighting in existing rooms. Plumbing: first floor–replace 1 sink and dishwasher; waterline to refrigerator; repipe rough for 1 second-floor tub; move gas line for kitchen stove 5 ft. HVAC: reconnect existing kitchen exhaust duct in a new location.
$75KInternational Building Code (IBC) 2015. Replace asphalt roof. State education fee paid: $3.12.
$12KAddition to the main dwelling and garage accessory structure via an enclosed breezeway. Improvements to the existing laundry space and powder room, and to the open space above the garage. State education fee paid: $123.50.
Addition to the main dwelling and garage accessory structure via an enclosed breezeway. Improvements to the existing laundry space and powder room, and to the open space above the garage. State education fee paid: $123.50.
Addition of main dwelling and garage accessory structure via enclosed breezeway. Improvements to existing laundry space and powder room and open space above garage. State Ed. Fee paid.: $123.50 In accordance with Section R314.2, CSBC the Household Fire Alarm System installed under this permit is required to be owned by owner and owner is responsible for having the system maintained in accordance with NFPA 72 and monitored by an approved supervising station in accordance with NFPA 72.
$475KRepair of the existing deck and stairs at the rear of the house. The deck is to remain exactly the same size as previously built. State education fee paid: $5.20.
$20KNew construction of a pool house. State education fee paid: $22.60.
New construction of a pool house. State education fee paid: $22.60.
New construction of a pool house. State education fee paid: $22.60.
$86.7KConstruct 1 story master bedroom suite. State ed fee paid $29.90 PLUMB: First floor: 1 nw: water closet, basin, shower HVAC: misc. Ductwork repairs and mods, no new equipment electrical: general lighting and power for master bed and bath.
$115KConstruct 1 story master bedroom suite. State ed fee paid $29.90 PLUMB: First floor: 1 nw: water closet, basin, shower HVAC: misc. Ductwork repairs and mods, no new equipment electrical: general lighting and power for master bed and bath.
$115KConstruct 1 story master bedroom suite. State ed fee paid $29.90 PLUMB: First floor: 1 nw: water closet, basin, shower.
Interior only renovation remodel kitchen, l full bath and 1 half bath. State ed fee paid $39 HVAC: repair return duct; replace broken air unit; replace broken existing air conditioning unit; replace cooling coil on furnace; replace misc. Grills, no condenser electrical: 40 devices installed; remodel kitchen and 2 bathrooms. PLUMB: First floor: 1 nw: water closet, basin, 2 nw: sinks, dshwshrs.; Second floor: 3 nw: water closets, 4 nw: basins, 2 nw: tubs, 1 nw: shower, clothes washer, floor-drn (laundry room.); install 1 gallon. Indirect ht. Wtrl-htr.; relocate gas piping for 1 kitchen stove.
$150KConstruct new master bedroom addition within existing building foot print; convert existing first floor and living room to game room State Ed Fee paid.$52.00 Amend #1: 11.2.18 val $80,000 fee $1,100.80 expand breakfast room under existing roof line Amend #2: 7.12.19 val $22,000 fee $351.72 convert existing first floor bedroom suite to game room; theatre; guest suite with bump out; structural changes electrical: install wiring for master bed/area and house renovation; expand breakfast room, conversion of first floor. PLUMB: basement: move 1: water closet, basin, 1 nw: water closet, basin; Second floor: 1 nw: water closet, tub, shower, 2 nw: basins; relocate gas pipe for new meter location. Amendment (10/8/19): first floor: replace 1: sink, move 1: sink, 2 nw: dshwshrs.; relocate gas pipe for kitchen stove. Amendment (11/5/19): Third floor: 1 nw: water closet, basin, shower HVAC: add 1 new zone on boiler and piping to new air handlers in attic HVAC (2): 1 nw: hydro and air conditioning new master bedroom; 1 new ductless mini split new theater; supply new ducts and zone for finished third floor. Playroom; relocate 3 returns, first floor., relocate 7 supplies, first floor.; 2 new exhaust. Fans; install kitchen exhaust. And makeup air.
$200KRenovate 2 bathrooms and kitchen. No exterior work and no change in building footprint. State education fee paid: $39.00.
$150KRemodel kitchen and powder room. State education fee paid: $23.40. HVAC: Relocate 4 existing supply registers to accommodate the new kitchen area.
$90KConstruct a bedroom dormer under the 2012 IRC. State education fee paid: $3.90. Electrical: 2 devices installed; reattach 2 boxes to new frames; install new outlets and new wiring. HVAC: reconnect existing ductwork at the dormer.
$15KDEMO Pool Disposal Site: AMEC Carting State Ed. Fee paid.: $. 78.
$3KDEMO Pool Disposal Site: AMEC Carting State Ed. Fee paid.: $. 78.
$3KNew Construction of a 1 Story Pool House with partial walk-out Basement; Structural Retaining Walls. State Ed. Fee paid.: $312.00 HVAC: install 3-ton hydro air system; install gaspfired boiler and indirect water heater; install radiant floor warming for garage, sports closet and first floor. Lining space; install steam humidifier and bathroom exhaust. Fan; install all nec. Piping, ductwork and final rgd's PLUMB: basement: 1 water closet, sink 2 hose bibs.; install ejector pump for bsement water closet and sink Amendment (11/30/17): basement: 1 water closet, basin, sink, 2 hose bibs; First floor: 1 water closet, basin, tub, shower, sink, dishwasher; install ejector pump for basement water closet and sink; also install wall-hung water htr. And radiant tubing in floor for basement and first floor. Amendment (2/6/18): basement: 1 nw: water closet, basins, sink, 2 nw: hose bibs; First floor: 1 nw water closet, basin, shower, sink, dishwasher; 2 outside showers, underground water service from main house to poolhouse; underground gas from generator pad to poolhouse; gas piping for boiler and pool heater; sewer ejector and under slab radiant tubing; install indirect hot water heater electrical: 800-amp proposed service; install second 800 a transformer and new electrical service to poolhouse; new electric for poolhouse, receptacles, lighting. Amendment (3/16/18): install low voltage wiring for: 1: thermostat, 4 speakers, 2 tleephone and 4 data, 1 catv; connect fire alarm from main house; install 4 smoke and 2 heat detectors electrical (2): install 50 low voltage fixtures and 4 ground transformers HVAC: - install 3-ton hydro-air system; install gas-fired boiler and indirect water htr.; install radiant floor. Warming for garage, sports closet and first floor. Living space; install steam humidifier and bathroom. Exhaust. Fan; install all nec. Piping, ductwork and final RGD's.
$1.2MNew Construction of a 1 Story Pool House with partial walk-out Basement; Structural Retaining Walls. State Ed. Fee paid.: $312.00.
Remodel kitchen and 1 bath; install a mini-split air conditioning system. State education fee paid: $28.60.
$110KInterior demolition only. State education fee paid: $91.00. Amendment #1: 11.16.16, valuation $477,000, fee $6,365.02; add 2-bay garage at ground level with master suite above, new front entry, and rear terrace. Amendment #2: 7.18.17, fee $60; retaining wall details. Amendment #3: 9.30.19, valuation $60,000, fee $895.60; structural repairs and additional plumbing, electrical, and HVAC work. 8.1.19 change of contractor; $40. In accordance with Section R314.2, CSBC, the household fire alarm system installed under this permit is required to be owned by the owner. The owner is responsible for having the system maintained in accordance with NFPA 72 and monitored by an approved supervising station in accordance with NFPA 72.
$350K