Phase I: Legalization of dormer and rear staircase. Phase II: Create a connection from the attic to the second floor for storage only. Updated scope includes a legal connection to the first floor; finishing the basement with 1 bedroom, 1 full bath, and a wet bar. This will not be an accessory dwelling unit (ADU), just an extension of the first floor.
Legalize the basement (TV area, office, full bathroom, and laundry) with a connection to the first floor. (864 SF). Ceiling height: 6'-9". Ceiling height to the bottom of the white beam: 6'-3/4" (MOD approval).
Stop work for repair of the front porch, 90 SF, without permits; work done by owner, with no change to square footage. Revised to include: “Add interior renovation to existing kitchen, existing full bathroom and 2 half baths.” 5.8.
Roofing · 2024$10,000
Stop work – work done by the owner without a permit: Residing of 8 squares and reroofing of 8 squares.
Interior renovation of an existing 260 SF porch to convert it to habitable space. Scope includes new windows (being done by others), an exterior door, electrical work, expansion of the existing central air to the space, and an air-conditioning condenser added to the scope of work on 8/29/2023. MTC.
Construct a dividing wall for office space with a fire-rated door in an existing one-story, owner-occupied commercial building; renovate the existing bathroom and replace the garage door. Construct a demising wall with elc and a 90-minute-rated door, and renovate the existing bathroom (State Mod Attached). LT 6/1/2023.
Electrical · 2023$10,000
Propane tank dispensary with a pad for a 500-gallon propane tank and an electrical connection for a future connection of a 1,000-gallon tank.
Reinforce the existing retaining wall along the side of the property and extend its height to 9 ft. Work description updated to reflect that this is the “legalization of repair of an existing retaining wall.” Noted 6.3.22 MK.
Replace windows and sliding doors. First floor: Replace existing decking and railings. New ½ bathroom: Legalize and renovate powder room. Kitchen renovation. Renovate full hall bathroom. Renovate primary bathroom. Basement: New bar area, full bathroom, bedroom, and laundry room.
Installation of upgraded signage for gulf gas station as per plans. Revised, detailed scope of work provided: "1. Install GULF fascia on the existing gas station canopy over the gas dispensers 2. Install GULF fascia & MID signage on the gas dispensers 3. Install two Gulf illuminated signs on the canopy 4. Install two fascia signs on Kiosk 5. Install illuminated LED fascia accent lighting on three sides of the canopy fascia." (Noted 10/14/21: MK).
Stop Work Order: Exterior work (exterior staircase). Picture of stairs attached. Scope includes removing a window on the second floor and replacing it with an exterior door; same on the third floor. Survey, plans, and documents to be uploaded once received.
Remove 2 windows in the living room; remove the dividing wall between the living room and screened porch; construct a second screened porch above the deck; and repair hardwood floors.
Convert the existing unfinished attic, approximately 1427 SF, to add 2 bedrooms and 1 bath to the, 2 units below. Heating will be tied into the existing systems for each unit. This project will also require electrical, plumbing, and HVAC permits. Egress window sizes need to be shown.