16 Pleasant View Pl
Greenwich, CT- 2026Electrical
Electrical Work
- 2026Plumbing
Plumbing Work
Local provider profile
Documented work across Connecticut based on attributed municipal records.
Contact information
These details have not necessarily been claimed or independently confirmed by the provider.
Work history
Individual records are grouped by address. Totals include only values reported in public records and may not equal final construction cost.
Electrical Work
Plumbing Work
Interior renovation of kitchen, bathroom relocation laundry, remove non-bearing. Wall and stairs storage loft. Amended to replace dry wall and insulate due to water damage.
$70KAlteration
Plumbing Work
Add To & Alter
$400KAdd To Alter
New second floor over existing. New 2.5-story addition at rear. New utilities and renovation of existing house. HVAC: Provide 2 new hydro systems, boiler, and indirect ductwork. Plumbing: Basement: 1 water closet, shower, and sink. First floor: 1 tub, shower, clothes washer, dishwasher, 4 sinks, and 2 water closets. Second floor: 3 water closets, 4 sinks, 2 tubs, 1 shower, and clothes washer. Third floor: 1 water closet, shower, and 2 sinks. Gas pipe for 2 fireplaces and dryers, 1 kitchen range, boiler, generator, and grill. Electrical: 100-amp overhead temporary service. Amendment (5/18/21): New 400-amp underground service, CRS? 5642584; wire new construction house. 120 switches, 120 outlets, and 100 light fixtures.
$926KRenovate house. New 1 story kitchen/family room addition at rear, new 2.5 story garage addition to side. Add 1 bedroom and 1.5 baths to house. Upgradae siding, windows, utilities. State ed fee paid $83.20.
$320KRenovate house. New 1-story kitchen/family room addition at rear and new 2.5-story garage addition to side. Add 1 bedroom and 1.5 baths to house. Upgrade siding, windows, and utilities. State education fee paid: $83.20.
$320KRenovate the kitchen, dining room, and sunroom. Interior alterations. State education fee paid: $18.20.
$70KAdd'tn of new roof over exist'g first floor to relocate mstr bdrm and inerior renovations @exist'g bsmt, 1st and 2nd floors State ed fee paid $62.40 electrical: renovation of dining room., powder room., family room. Master bedroom., mstr. Bathroom.; new switches, outlets, recessed lights, new dedicated circuits; 22 switches, 38 outlets, 40 lt. Fixtures. NEC PLUMB: install new master bathroom. On second floor.: 2 nw: sinks, 1 nw: shower, tub, water closet; First floor: move 1: water closet, sink IPC electrical (2): alarm work due to renovations: 1 motion sensor, 4 heat dets., 5 combo co/smoke detectors, 5 co dets. NEC HVAC: install ductless heating and cooling system for master bedroom.; relocate misc ductwork to accommodate construction; perform nec. Ventilation of master bathroom. Ductwork.
$240KAddition to include a first-floor family room and second-floor master suite. State education fee paid: $72.80.
$280KNew construction of a two-car garage. State education fee paid: $23.62.
New construction of a two-car garage. State education fee paid: $23.62. Electrical: Wire garage with 5 outlets, 3 lights, and switches.
$87KRenovation of 2 bathrooms and kitchen; Installation of HVAC System; Installation of insulation at roof and walls; Removal of wall to make residence Single Family; Reinforcing a beam; Removal of one of 2 electrical. Meters. State Ed. Fee paid.: $24.10 electrical: 75 devices installed; 1: rng., clthsdryr, air conditioning motor, dishwasher; ; 200-amp o.h. service; smoke/co to code; receptacle to code, air handlers controls, recess/wall/ceiling fixtures; recess under conduit/outdoor fixtures; kitchen and laundry equipment PLUMB: first floor: replace 2: water closet, tubs, replace 1: clothes washer, replace 3: sinks HVAC: install new 150000 btu gas boiler and 3-ton ducted hydro heating and air conditioning system (Note: gas pipe, electric by others).
$93KPastor's Residence: Removal of windows, doors, partitions, plumbing, electrical., etc. State Ed. Fee paid.: $2.60 Amend #1: 3.27.17 val $637,000 fee $8,486.62 renovations and additions; new porch and mudroom Amend #2: 6.22.17 fee $60 switch location of screen porch HVAC: install: wallhung nat. Gas boiler; indirect hot wtr. Htr., hydro air handlers 1st and 2nd floors.; ductless split for third floor; ductless split for third floor.; all supply and return ducting; all ductwork of ventilation fans electrical: 120 devices installed; new wiring of entire house. 120 devices installed; new wiring of entire house. Amendment (6/26/17): upgrade service to 200-amp electrical (2): security, fire and co2 alarm system PLUMB: first floor: replace 1; water closet, dishwasher, replace 3: sinks; Second floor: replace 2: water closets, replace 1: tub, shower, replace 4; sinks.
$10K