138 Ledge Rd
Darien, CT- 2024Addition
Commercial additions and alterations.
$6M
Local provider profile
Documented work across Connecticut based on attributed municipal records.
Contact information
These details have not necessarily been claimed or independently confirmed by the provider.
No contact information was found in the available records.
Work history
Individual records are grouped by address. Totals include only values reported in public records and may not equal final construction cost.
Commercial additions and alterations.
$6MCommercial additions and alterations.
$70KBusiness Building.
$4.7MAccessory Structure.
$430KConstruct a 110-residential-unit complex out of the ground, with 2 levels of parking and 4 levels of residential space above.
$20.1MSuperstructure for "Garavel Subaru".
$3.1M"Garavel Subaru" 2 story building - FOUNDATION ONLY; B21-1361-Build New Const residence: Superstructure for "Garavel Subaru"; E21-1212-Ele No Fee: Wiring of new car dealership - including lighting, fire alarm, power, and tel data; P21-0567-plumbing No Fee: Water, drain, and vent piping for 11 toilets, 10 lavs, 4 urinals, 1 shower, 4 sinks, 1 washing machine, 2 ice makers, 1 dishwasher, 1 water cooler, 4 water heaters, 13 hose bibs, 16 floor drains, 7 trench drains, and 7 roof drains,; H21-1007-Mech No Fee: Gas piping for 1 wate rheater, fireplace, generator and 13 RTUs; P22-0033-plumbing Alt Comm: Installation of new wet-pipe fire sprinkler system; H22-0172-Mech No Fee: HVAC install - 11 new trane gas electric RTU; s, one split cooling system, 5 exhaust fans, metal fabricated ductwork, metal grills, thermostats and refrigeration piping.
$725K136003 (B-19-526): Construct a 3-story self-storage facility.
$6.2MOwners Address: 347 STILLWATER AVE, STAMFORD, CT 06902 Description: 2 Story Addition, 2 story ~8,802 SF (A3)first floor with ~4,468 SF of second floor addition, renovation ~2,268 SF of first floor, Renovate existing locker room into a meeting room and office space ~1044 SF and 1,090 S. F. of second floor incl. 2 story Elevator Construction Type: IIB Use/Occupancy: B, A-3, S-1 Design Occupancy Load: Total Building (B) 22, (A-3) 1,593, (S-1) 3 Applicable Code 2018 CSBC 2015 IBC.
$2.9M