130 Henry St
Stamford, CT- 2021Demolition
Demolition of building.
$24K
Local provider profile
Documented work across Connecticut based on attributed municipal records.
Contact information
These details have not necessarily been claimed or independently confirmed by the provider.
No contact information was found in the available records.
Work history
Individual records are grouped by address. Totals include only values reported in public records and may not equal final construction cost.
Demolition of building.
$24KDemolition of building.
$24KPhase 1: demolition of three 3 story steel framed structure (blickensderfer typewriter building) constructed of concrete slab (first floor) and wood decking supported on structural steel framing members not to exceed 50 feet from easterly end. (Issued on 10/22/2021)PHASE 2: TBD.
$70KDemolition of structure. E-mail sent 1/15/2020 with letter and check list. Applicant changed to Strazza Consulting. 2 26 2020 BG.
$35KDemolition of garage.
$5KDemolition of structure.
$21.5KDemolition of building. OK to continue with this application. BG 2 13 2020.
$41.9KDemolition of building Remove when accepted. Before we can issue a permit to demolish this structure please complete following steps: 1. Review demolition check list, demo letter and associated requirements. 2. Review general permit conditions. 3. Prepare required documents and have them scanned as PDF documents. 4. Upload required documents in PDF format. 5. Once your application is received, it will be reviewed for completeness. 6. If everything is in order, you will receive an email advising you to obtain approvals from EPB and Health 7. If your project requires construction documents, you will be advised via email to upload such documents. 8. Please send an email to [email protected] once you have obtained necessary approvals and paid appropriate fees. 9. The demolition permit will be processed and sent to you via email. 10. If your application is deemed incomplete, you will be notified by email advising you to submit missing information. 11. All open permits must be closed out prior to permit issuance. Thank you very much. Building Department.
$24KDemolition of building Remove when accepted. Before we can issue a permit to demolish this structure please complete following steps: 1. Review demolition check list, demo letter and associated requirements. 2. Review general permit conditions. 3. Prepare required documents and have them scanned as PDF documents. 4. Upload required documents in PDF format. 5. Once your application is received, it will be reviewed for completeness. 6. If everything is in order, you will receive an email advising you to obtain approvals from EPB and Health 7. If your project requires construction documents, you will be advised via email to upload such documents. 8. Please send an email to [email protected] once you have obtained necessary approvals and paid appropriate fees. 9. The demolition permit will be processed and sent to you via email. 10. If your application is deemed incomplete, you will be notified by email advising you to submit missing information. 11. All open permits must be closed out prior to permit issuance. Thank you very much. Building Department.
$24KConstruct sidewalk sheds approximately 245 feet long. This project will also require an electrical permit. Engineered drawing on file.
$5KPartial interior demolition to probe and determine the building’s existing conditions. No exterior or interior alterations are approved at this time. Additions or alterations will require a revision.
$1KReduce to core to prepare for demolition. Made inactive; work is covered under Demo Permit Application TB-19-625.
$250K