Demolition of the existing first-floor framing, roof, and chimney while maintaining the existing foundation. Reconstruct the residence as a Colonial-style home consisting of 4 bedrooms and three-and-a-half bathrooms. Work will also include construction of a new deck, abandonment of the existing septic system, and connection to the municipal sewer system. All work will be performed in accordance with applicable building codes and approved plans.
Renovation of the master bedroom, bathroom #1, and laundry room; installation of the proposed window and closet doors in the master bedroom; and replacement of the roof, gutter, and downspout.
Guest Bathroom renovationProtect all traffic areas with Ramboard and drop cloth. Install plastic and zipper opening at doorway to contain dust Remove vanityRemove wall and floor tile from shower and bathroom floorRemove cement boardsFrame new shower stall curbPre-pitch shower floor with cementPour shower floor foundation pitch towards drain. Install ½” cement boards on shower walls. Install ¼” cement board on bathroom floor. Install mold resistant sheetrock where necessary. Install shower stall floor tile (tile provided by home owner). Install shower stall wall tile 1'x1' porcelain tile or equal lined by bullnose (tile provided by home owner). Install shower curve saddle (stone saddle provided by home owner). Install bathroom floor tile1x1' porcelain tile or equal Tile provided by owner). Install bathroom door saddle X1 (saddles provided by owner)Apply grout and grout sealer to shower walls, shower floor and bathroom floor. Install baseboard molding as needed. Install vanity (provided by owner). Install toilet paper holder, towel holder and hook (provided by owner). Install vanity (vanity provided by owner)Remove and dispose of all debrisRemove faucet, sink, and vanityRemove toiletRemove tub and fillerRemove shower valveCap toilet water supply and vanity cold and hot water suppliesProvide and install new shutoff valves for toilet water supply and vanity cold and hot water suppliesSupply and install vinyl shower sub-pan. Install new owner provided shower valve and head shower. Install new owner provided sink and faucet. Install new owner provided toiletAll plumbing fixtures will be connected to existing locations. All plumbing fixtures to be provided by owner.
Major alteration of a two-family dwelling. Install structural steel for the removal of load-bearing partitions. Add a new bathroom on the second floor. Remove the existing exterior stair at the side of the building. Build a new access stair to the second floor at the rear.
Remodel the first floor (electrical, HVAC, and plumbing). Add 3 support beams. State education fee: $52. HVAC: Reconfigure supply and return ductwork for the kitchen remodel and second floor. Laundry room remodel; all necessary ductwork for the kitchen, exhaust, supply, and returns. Replace 3 hydro heat air handlers. Electrical: Remodel the first floor. Electrical work includes 16 switches, 22 outlets, and 12 light fixtures. Existing 200-amp service and existing 1 meter. Plumbing: Renovation includes a new location for the powder room and new kitchen locations. Stove, gas line. First floor: move 1 water closet and dishwasher; move 3 sinks.
First-floor electrical fit-out and tenant fit-out. State education fee paid: $11.70. Receipt #20-0308. Electrical: 36 devices installed; provide and install lighting, receptacles, switches, and exit lights, as shown on attached drawings (A1).
Remove kitchen wall, install recessed lights, and replace baseboard heat with hydronic heating. State education fee paid: $7.80. Plumbing: run gas line to both fireplaces on the first floor. Electrical: remodel the family room, dining room, and library, including outlets and switches; install LED lighting strips in the library, 5 recessed lights in the family room, and 2 recessed lights in the dining room.
Remodel master bathroom, master bedroom and hallway. State ed fee paid $15.86 Amend #1: 3.29.21 val $14,400 fee $225.64 structural change electrical: remodel 2 bathrooms on second floor.; install new lights and extend some electrical outlets circuits. 6 switches, 7 outlets, and 12 light fixtures PLUMB: remodel 2 bathrooms., second floor. Hallway, bathroom. And second floor. Master; Second floor: 2 water closets, replace 1: shower, replace 1: sink, move 2: sinks,; 1 existing tub will remain.