Skip to content

Local provider profile

Danny G Frattaroli

Documented work across Connecticut based on attributed municipal records.

Reported work volume$4.9KDocumented jobs
Average project$980Where values are reported
First observed2018Available dataset
Categories2Observed work types
Used for work inNorwalk5 jobs

Contact information

Details found in public records

These details have not necessarily been claimed or independently confirmed by the provider.

No contact information was found in the available records.

Work history

Documented work by property

Individual records are grouped by address. Totals include only values reported in public records and may not equal final construction cost.

Satellite view of 11 Linden Hts, Norwalk, CTSatellite view
2020

11 Linden Hts

Norwalk, CT
  • 2020Plumbing

    Connect the generator from the meter (natural gas); install a new gas line.

    $900
Satellite view of 7 Point Rd, Norwalk, CTSatellite view
2020

7 Point Rd

Norwalk, CT
  • 2020Plumbing

    Lift and reset toilet in same location, relocate water lines 24" high to wall mount faucet and trim.

    $1.5K
Satellite view of 14 Point Rd, Norwalk, CTSatellite view
2020

14 Point Rd

Norwalk, CT
  • 2020Mechanical

    Mechanical: Underground gas line tied to existing propane manifold to gas firepit.

    $500
Satellite view of 30 Surrey Dr, Norwalk, CTSatellite view
2018

30 Surrey Dr

Norwalk, CT
  • 2018Plumbing

    Plumbing for kitchen and hall bath renovations; all fixtures remain in the same location.

    $1K