475 Silvermine Rd
New Canaan, CT- 2025Electrical
The proposed project is an interior renovation of the existing bathroom located in the bonus room above the garage. The scope of work includes the removal and replacement of existing bathroom fixtures and finishes. Specifically, the project will involve replacing the shower heads, toilet, and vanity with new fixtures of similar type and in the same locations. Existing wall and floor tiles will be removed and replaced with new tile materials. No changes are proposed to the bathroom layout, framing, or structural components. Plumbing and electrical connections will remain in their current locations. All work will be performed in accordance with applicable Connecticut State Building and Plumbing Codes and the requirements of the Town of New Canaan Building Department.
$2K