10 devices installed; reconfigure existing branch and lighting; install new tele/data.
2018Electrical
1689 devices installed; 3 air conditioning motors, 2: dshwshrs., 2: wtr. Htrs. Motors; controls for lights, branch power, receptacles, 1 new 75 kva tx 5 non panel boards, frokm exist. panels, expand and modify existing alarm system; lv tele/ldata stub-vps; security cablings and pathways; supply and install new sound masking system; line voltage wiring to relocated and new hvac equipment.
2nd + third floor renovation to in patient behavioral + AC unit.
$1.3M
2025Electrical
Data and equipment wiring.
$84K
2024Electrical
1 st tenant space Lights and outlets for tenant fit out, select fire alarm relocations.
$80K
2023Ele Alt Comm
Disconnect and reconnect of 3 air handlers being replaced, connection of 2 temp fans, replace 3 VFD's.
$14K
2022Electrical
Interior renovations to 3rd and fourth floor for SPD modifications Installation of 4 new quad receptacles, 2 new EM quad receps relocation of 4 normal quad receps, install 2 new cat 6 data outlets.
$7K
2021Demolition
Select electrical demo, disconnect existing lineac and reconnect with new power conditioner, RJB, main breaker, extend/add conduits and cables to new locations as required, relocate one FA wall device.
$31K
2019Electrical
Electrical - 3 rd floor Pulmonary add 4 new lights and receptacles.
$10.5K
2019Electrical
Electrical: install lights and receptacles in the pharmacy on the second floor.
$18K
2019Electrical
Electrical: Change feeder on the second floor; install new VFD, fire alarm, smokes, and feeds.
$10.9K
2018Electrical
Electrical work: lighting, switches, receptacles, panels, and feeders; add to existing fire alarm and tele/date stub.
$65K
2017Mechanical
Electrical - Install light fixtures, switches, receptacles, hvac wiring, add to existing fire alarm system, add to existing nurse call system.
Lights and outlets, 1 transformer, 2 new panels, fire alarm relocations, data stubs and select demo - Neurosurgery.
$220K
2024Demolition
Lights and outlets, 1 transformer, 2 new panels, fire alarm relocations, data stubs and select demo - Women's Health.
$100K
2024Demolition
Lights and outlets for new space, fire alarm relocations, and selective demolition.
$87K
2022Electrical
Lights and outlets for tenant fit-out.
$300K
2022Demolition
Select electrical demo - modify and add new distribution equipment, new lighting, light controls, branch wiring, modify existing fire alarm for new devices, new Cat6A tele/data cabling for space, add 14 PA speakers and cabling.
$270K
2021Demolition
Select electrical demo, modify and add new equipment, new 60 JW genset on roof and panel, new lighting, light controls, branch wiring, modify existing fire alarm new tele/data cabling.
$612K
2021Demolition
Demolition electrical, temporary lights, and power.
2 30 kW generators feeding 50 kW fire pump and 14 kW lighting and pumps.
$40K
2019Electrical
Change service to 1600 amps. Install 1139 devices. Install 26 gas ranges, gas clothes dryers, dishwashers, and water heaters. Install 30 2-ton air conditioning units. Install new wiring to receptacles, lights, panel, fire alarm, telephone, data, and cable TV. Install a new elevator and a new feeder to the common area panel.
Electrical: Install new MRI feeder and lights; wire a new receptacle, MRI chiller, and AC units at “Vet Caner Center.”
$110K
2019Electrical
Electrical: Install lighting for tele/data, add to the existing fire alarm, and install 2 new panels off the existing distribution. Veterinary Cancer Center - 02.
$100K
2019Electrical
Electrical - install wiring for hew accelator and CT Scanner, new feeders trench and lighting, add to exist. fire alarm.
Select electrical demolition: 1 new panel from existing new branch wiring and lighting, empty telco and security stub-ups, and new receptacles. 14 switches, 60 outlets, and 8 light fixtures.
2018Demolition
386 devices, 1 water heater, and 18 electrical heaters; selective electrical demolition. Install lighting and occupancy controls as shown; supply new branch wiring for lighting and receptacles; modify the existing fire alarm system for additional devices; provide power wiring for new HVAC heat pumps; supply and install 1 new 75 kVA transformer and feeder with 4 new panel boards.
Install new 120 a 120/208 v service, 1 1200 a main sw., 1 4-gang 400 a meter bank, 1 4 gang 200-amp meter bank; reconnect existing loads to new meters., new 1200-amp service.
2423 devices installed; selective electrical demolition on the second and third floors. Modify 2 panelboards to add 4 panels, new branch lighting, lighting controls, empty tele/data stub-ups, modify existing nurse call for new devices, modify existing fire alarm for new devices, and empty security stub-ups for card access.
2019Electrical
28 devices installed. Install 1 2 1/2-inch conduit from CRSB4B 200A breaker to mobile dock; disconnect and ressoerstall outlet; install 2 new heaters in mobile dock; modify existing fire alarm for 2 smokes, 1 speaker strobe, and tie into mobile dock trailer; install 3 empty sleeves to mobile dock for future use; install 4 new 2-by-2-foot lights, 2 exit signs, and occupancy controls from existing; install 6 new receptacles at dock.
2019Electrical
Watson Pavillioin–Second floor: 381 devices installed. Supply and install non-lighting and lighting controls, new branch wiring and devices; modify existing fire alarm for relocated and new devices; empty telephone/data and security sleeves; junction box for exam room light only supplied and installed by others, along with additional supports.
2019Demolition
215 devices installed; select electrical. Demo, new lighting and lighting controls, new branch wiring; modify existing fire alarm for new a/v devices and smoke detectors, relays, empty tele/data snb-ups in walls, empty security sub-ups in walls.
2019Demolition
478 devices installed; 1 large fan; selective electrical demolition; add 1 new panel from existing; new branch wiring, HR's, lighting, lighting controls, receptacles, empty telco sleeves, empty security sleeve, local call-for-aid units, and modification of the existing fire alarm for new devices; 1 Lutein Graffir Eye system for Hyde Browell conference room; relocate 3 pendant lights supplied by owner; 1 rooftop fan; replace/add branch 120v 20 a wiring for.
Install light fixtures, controls, and receptacles; disconnect and reconnect heat pump; install low-voltage sleeves and 4 telephone/data drops; add to existing fire alarm.
CAT 6 cabling for the 2nd and 3rd floors: 114 CAT 6 telco cables for 57 stations; 1 RG6 TC with 2 CAT6 cables; 10 CAT 6 WAP ceiling cable locations; and 3 CAT6 48-port patch panels. Pre-cable for nurse call on the 2nd and 3rd floors: 19 CAT3 cables for call stations and 7 CAT3 25-pair cables to stations. Nurse call equipment by others. J-hook supports for cabling and firestopping by code. Utilize existing telco racks and cabinets.
Lessee: Marblegate. Replace 1 125 kilowatt diesel generator on ground level next to parking garage; install 1 400-amp Transfer outlets as tenant space electrical closed fourth floor.
$33K
2019Electrical
Install lighting, switches, light controls, receptacles, and telephone/data stubs; repair the generator and add to the existing fire alarm.
38 devices installed; select electrical. Demolition for existing bathrooms. Supply and install new lighting and motion controls, and supply and install new receptacles; re. Install existing fire alarm in new ceiling system.
2018Demolition
2 devices installed; 2 200 watt J-boxes for security; select electrical. Demo third floor. Corridor; install security stub-ups at new partition entry for card access and mag locks; provide 120 v J-box in ceiling for new card access at 2 locations.
2018Electrical
Lighting, switches, lighting controls, receptacles, HVAC equipment, and empty tele/data; add to existing fire alarm.
Building 9, First floor: 65 devices installed; 53 Cat6 cables to new office locations; 2 Cat6 48-perf patch panels; 1 2-post rack in the IDF room; 3 Cat6 WAP locations above the ceiling; 1 Cat6 cable for a camera location above the ceiling; 1 6-strand OM4 fiber from the first floor to the second floor; and 4 Cat6 cables from the first floor to the second floor. IDF cable supports as required.
2019Electrical
Lessee: ONS. 33 devices installed; rework 20 CAT se tele data cables to non-furniture locations; existing cables to be reused. Install 2 12-port CAT 6 patch panels in existing racks; install 6 new CAT 6 cables in existing IDF rack to non-expansion IDF; install 3 CAT 6 cables for WAP locations; install 2 CAT 6 cables for camera locations; secure existing rack to floor and ground to steel.
42 devices installed; 2 ovens and dishwashers; renovate existing kitchen and laundry; reuse existing circuitry; install 6 new ceiling lights, 6 new under-cabinet lights, and 4 new island plugs; reorganize existing outlets in kitchen; install 4 new outlets in office; install 6 new switches.
2019Electrical
14 devices installed; renovate 2 Boys Bathrooms: new lighting, new exhaust. Fan, new GFI's.
Electrical: Install a light fixture, receptacles, telecommunications/data stubs and wiring, add to the existing fire alarm, and install occupancy sensors.
451 devices installed; 1: qa/c motor, wtr. Htr., 13 electrical. Htrs., select electrical. Demo, nav lighting fixtures, nav lighting controls, timelock controller; new wall type and floor. Receptacles, tele/data stlub-ups, 1 non 45 kva tx with 2 new panelboards; renovate existing fire alarm.