Skip to content

Local provider profile

David S. Wardell

Vice President · Belway Electrical Contracting Corp

Documented work across Connecticut based on attributed municipal records.

Reported work volume$5.2MDocumented jobs
Average project$372KWhere values are reported
First observed2014Available dataset
Categories2Observed work types
Used for work inGreenwich27 jobsNorwalk6 jobsWilton2 jobs

Enriched provider details

Provider information

Supplemental data supplied by FullContact and stored separately from public records.

Vice President at Belway Electrical Contracting Corp

FullContact query stored 2026.

Contact information

Details found in public records

These details have not necessarily been claimed or independently confirmed by the provider.

Phone
914-592-4744source record

Work history

Documented work by property

Individual records are grouped by address. Totals include only values reported in public records and may not equal final construction cost.

Satellite view of 1700 E Putnam Ave, Greenwich, CTSatellite view
2025

1700 E Putnam Ave

Greenwich, CT
  • 2025Electrical

    Electrical Work

  • 2024Electrical

    Electrical Work

    $21K
  • 2022Electrical

    Electrical Work

  • 2018Electrical

    148 devices installed: 86 light fixtures, 24 dimmers, 2 daylight sensors, 6 receptacles, 60 3 ft. Wireredos, 4 receptacles (ea.), 1 GFCI, 8 Conn u 3 om motors; 15 VAV boxes, 120 V, 1/3 hp; 2 new 150-amp panels; 3 om 4w, 8 smoke detectors, 11 duct detectors, 9 signal FA devices, 1 shutdown relay, and 74 telco data/outlets.

  • 2018Electrical

    50 devices installed; 12 duplex outlets, 1 floor outlet, 1 dimmer rated at 600 watts, 8 occupancy sensors, 16 light fixtures, and 12 signal outlets.

  • 2018Electrical

    34 devices installed; 2 3 om 30-amp outlets, 100 ft. 4000 wire mold, 7 double duplex outlets in walls, 25 double duplex outlets in wire mold, and 44 telephone/data signal outlets.

  • 2018Electrical

    180 devices installed; 180 4-port Cat 6 data outlets.

  • 2018Demolition

    27 devices installed; electrical demolition; 8 signal outlets, tele/data, 11 duplex, 1 floor furniture feed, and 15 fixtures.

  • 2017Electrical

    10 devices installed; remove and relocate lights and outlets for a new demising wall and closet relocation.

  • 2017Demolition

    28 devices installed; electrical work. Demolition: 14 hw. Lights, 5 new occupancy sensors, 8 new duplex, and 1 relocated fire alarm horn strobe.

  • 2017Electrical

    1 furniture feed; 3 double duplex; 1 duplex; 3 occupancy sensors; 6 2-by-4-foot lay-in; 1 2-by-2-foot lay-in; 2 horn/strobes; 1 heat detector; 1 smoke detector.

  • 2017Electrical

    36 devices installed; 1 new 200-amp, 120/208 V panel; 2 wall furniture feeds; 9 stations; 14 duplex receptacles; 3 GFCI receptacles; 1 208 V receptacle; 7 relocated fixtures; 2 wall occupancy sensors; 2 single-pole switches; 1 time clock; 2 smoke detectors; 1 heat detector; 1 fire alarm horn strobe.

  • 2017Electrical

    82 devices installed: 33 new fixtures, 19 relocated fixtures, 4 IP switches, 7 occupancy sensors, 1 dimmer, conn 2#12 at hot water heater, CT 2#12 at exhaust fan, 2 GFCI, 16 duplex, 1 floor outlet, 6 added or relocated fire alarm devices, and 1 CT at furniture systems.

  • 2017Electrical

    7 devices installed; 1 double duplex, 2 duplex, 1 telco, 3 relocate 2-by-4-foot floor, 1 floor outlet.

  • 2014Demolition

    211 devices installed; electrical. Demolition and temp. Lighting: 115 floor fixtures, 1 lighting control panel (12 circuits); 15 new occupancy sensors; 1 air conditioning Unit 2. 1/2-ton; 54 duplex; 2 wah feeds to modular furniture; 11 smoke detectors, 1 heat det., 4 fa strove, 7 fa horn strobes.

Satellite view of 1 Selleck St, Norwalk, CTSatellite view
2024

1 Selleck St

Norwalk, CT
  • 2024Electrical

    Building violation repairs, including covering exposed wiring, per fire marshal report.

    $1K
Satellite view of 675 Connecticut Ave, Norwalk, CTSatellite view
2024

675 Connecticut Ave

Norwalk, CT
  • 2024Electrical

    Electrical provisions for parking garage lighting, power, data wire, and switchgear. Low-voltage/data terminations by others; photovoltaic (PV) work by others.

    $1.6M
  • 2023Electrical

    Electrical provisions per plans for the foundation of a new parking structure that will service the adjacent new Wegmans Food Market. Scope of work includes sleeves and conduits for electrical only.

    $50K
Satellite view of 801 Main Ave, Norwalk, CTSatellite view
2022

801 Main Ave

Norwalk, CT
  • 2022Electrical

    Electrical work for 6th and 7th floor for "Financial Accounting Foundation".

    $39K
Satellite view of 10 Mason St, Greenwich, CTSatellite view
2021

10 Mason St

Greenwich, CT
  • 2021Electrical

    Renovations of the third floor. 3 switches, 93 outlets, and 73 light fixtures. Existing 1600 amps. 1 existing meter.

  • 2020Electrical

    Fourth-floor renovation: recircuit lighting and controls, relocate devices, and provide voice/data provisions; 2 switches, 2 light fixtures, and 4 outlets.

  • 2016Electrical

    Provide power to new sign on the face of the building by existing photocell-controlled circuit.

Satellite view of 100-101 N Water St, Norwalk, CTSatellite view
2019

100-101 N Water St

Norwalk, CT
  • 2019Electrical

    Electrical: install lights, floor receptacles, wall receptacles, fire alarm, BMS, and lighting control system for “Bloomingdales.”

    $3.2M
Satellite view of 200 Connecticut Ave, Norwalk, CTSatellite view
2018

200 Connecticut Ave

Norwalk, CT
  • 2018Electrical

    Electrical - conference room renovation - second floor - "Booth Financial".

    $3K
Satellite view of 10 Simmons Ln, Greenwich, CTSatellite view
2018

10 Simmons Ln

Greenwich, CT
  • 2018Electrical

    30 devices installed; wire new elevator; install 12 new lights, 3 GFCI receptacles, 6 receptacles, 4 new circuits, and 4 new switches.

Satellite view of 401 Old Church Rd, Greenwich, CTSatellite view
2017

401 Old Church Rd

Greenwich, CT
  • 2017Electrical

    40 devices installed; install control wiring for glass blackout system; 4 control panels, 18 terminal boxes, 8 exterior daylight sensors, and 10 switches.

Satellite view of 1 American Ln, Greenwich, CTSatellite view
2016

1 American Ln

Greenwich, CT
  • 2016Electrical

    50 devices installed: 8 4 ft. Fluorescent fixtures, 34 hi-hats, 2 wall scones, and 70 ft. LED strip lights.

Satellite view of 2 Greenwich Plz, Greenwich, CTSatellite view
2016

2 Greenwich Plz

Greenwich, CT
  • 2016Electrical

    Second floor: 16 devices installed; relocate trading desk 2 power feeds and data cables.

    $14.5K