73 Weed Hill Ave
Stamford, CT- 2026Roofing
Construct a one-story rear addition (~100 SF) to expand the existing mudroom into a four-season conditioned pantry/mudroom. Work includes new reinforced concrete footings, crawlspace foundation walls, an insulated crawlspace slab, and new exterior wood-framed walls with sheathing, weather barrier, insulation, and wood shingle siding to match existing. Install new roof framing, sheathing, and asphalt shingles tying into the existing structure. Install a new exterior door, new windows per schedule, and new composite rear-entry stairs with railing. Interior work includes an insulated floor system, finishes, shelving, and storage. Electrical work includes new lighting, outlets, and switches per plan. Install a new mini-split HVAC unit to condition the space. No change to the number of stories.
$50K