Diaz And Lopez Construction Inc.

Documented work across Connecticut based on attributed municipal records.

Reported work volume$1.9MDocumented jobs
Average project$648KWhere values are reported
First observed2019Available dataset
Categories2Observed work types
Used for work inStamford3 jobs

Contact information

Details found in public records

These details have not necessarily been claimed or independently confirmed by the provider.

No contact information was found in the available records.

Work history

Documented work by property

Individual records are grouped by address. Totals include only values reported in public records and may not equal final construction cost.

Satellite view of 101 Broad St, Stamford, CTSatellite view
2022

101 Broad St

Stamford, CT
  • 2022Building Permit

    Landmark Square, Building #5, Bow-Tie Cinemas: Renovate the arcade and small concession stand (hand sink and counter equipment).

    $200K
Satellite view of 118 Summer St, Stamford, CTSatellite view
2019

118 Summer St

Stamford, CT
  • 2019Electrical

    Permit issued under Section 107.3.3 (Phased Approval) of the 18 Connecticut State Building Code [under IBC 2015]. Revised 8/1/19 to add: Phase #2: renovation of the kitchen and concession area. Phase #1: renovation of Auditorium #6; new party room and bathrooms; common areas and corridors; renovation of existing exterior wall finishes and the underside of the existing canopy. Does not require WPCA approval. Phase #2: renovation of the kitchen and concession area. Trades needed for this permit: electrical, sprinkler, and framing.

    $894K
  • 2019Electrical

    Luxury renovation of auditoriums 1,2,3,4 and 5. Removal of existing auditorium seating, aisle lighting, floor finish, partial wall removal of auditoriums 1,2,3,4 and 5. Over-frame retrofit for new seating layout, inclusive of platforms, stadium risers and ramps. Modify entrances of entrances to auditoriums 1,2,3,4 and 5. New seats, acoustical wall coverings and floor finishes. Trades needed for this permit: electrical, sprinkler and framing. *2/26/19 permit made inactive for non-pick up smp.

    $849K