2019Renovation
Repair and Replace roof, siding, exterior trim, windows, doors, wood floors and tile. State Ed Fee Paid $52 electrical: 150 devices installed; 1: rng., oven, clthsdryr, gasbrnr. Motor, pool equipment, wtr. Htr., dishwasher, 2 air conditioning motors, dshwshrs.; install electrical throughout home to meet NEC requirements; wire new appliances and mechanical equipment to meet NEC requirements electrical (2): 1 alarm panel, 3 kp's, 8 heats, 4 cm, 11 smokes, 2 motions, 2 door contacts HVAC: remove air fired furnaces; install 2 direct vent propane furnaces, gas piping, frig. Piping and ductwork; install dryer vent, kitchen exhaust. Bathroom. Vents. Amendment (2/4/20): install temp. heat furnace; install gas piping for stove, fireplace, grill and water htr.; install tankless water heater. Amendment (2/18/20): no longer installing gas piping for stove, fireplace, grill, and water htr.; no longer installing tankless water htr. PLUMB: First floor: 2 water closets, basins, 3 hose bibs; 1 sink, dishwasher; Second floor: 3 water closets, 2 showers, 5 basins, 1 tub, sink, laundry tub, clothes washer; gas stove, fireplace, barbecue, water htr.
$200K