Skip to content

Local provider profile

Dimeo Construction Company

Documented work across Connecticut based on attributed municipal records.

Reported work volume$331.2MDocumented jobs
Average project$41.4MWhere values are reported
First observed2019Available dataset
Categories4Observed work types
Used for work inNorwalk5 jobsDarien1 jobsGreenwich1 jobsStamford1 jobs

Contact information

Details found in public records

These details have not necessarily been claimed or independently confirmed by the provider.

No contact information was found in the available records.

Work history

Documented work by property

Individual records are grouped by address. Totals include only values reported in public records and may not equal final construction cost.

Satellite view of 125 Roxbury Rd, Stamford, CTSatellite view
2026

125 Roxbury Rd

Stamford, CT
  • 2026Demolition

    New construction of a 425,000 SF high school facility, with associated site work, utilities, ball fields, and demolition of the existing structure, to be done in two phases. Phase One: foundation; demolition of the 2006 Freshman Gym, Coaches’ Offices, Freshman Locker Rooms, and the Maintenance Garage portion; and demolition of the old VOAG Building. Phase One only approved on 4/22/26. Phase Two will be approved at a later date. Phase Two: superstructure.

    $306M
Satellite view of 48 Noah S Ln Ext, Norwalk, CTSatellite view
2023

48 Noah S Ln Ext

Norwalk, CT
  • 2023Renovation

    Structural repairs to the main LVL beam only in the garage. Phase I. Future garage permit required.

    $21K
Satellite view of 10 Plymouth Rd, Darien, CTSatellite view
2021

10 Plymouth Rd

Darien, CT
  • 2021Repalce Wall with Structural Beam

    Replace wall with structural beam.

    $10K
Satellite view of Raymond St, Norwalk, CTSatellite view
2020

Raymond St

Norwalk, CT
  • 2020Build New Const Comm

    Superstructure for Building E — 58 units.

    $11.9M
  • 2020Build New Const Comm

    Construct the superstructure for Building D, comprising 50 units.

    $11.1M
  • 2019Mechanical

    Foundation only - building. D - 50 Units; E20-0675-Ele Alt Comm: Project known as Washington Village Phase 3 as per prints - 50 units; E20-0676-Ele Alt Comm: 400-amp temp service to feed two separate 200-amp 3 phase. Panels for building construction; H20-0669-Mech Alt Comm: Mechanical and HVAC work plans and specifications; H20-0712-Mech Alt Comm: Gas distribution for 50 apartments from meters; Bas gas and generator lines to be run; P20-0397-plumbing Alt Comm: Podium style four story 50 unite complete plumbing system; H21-0505-Mech No Fee: Washington Village Phase III - Building "D" - 5th floor - AHU duct and hydronic and refrigeration tie ins condenser piping and hookups on roof; H21-0544-Mech No Fee: Building D - Phase III ductwork, heating and piping.

    $1M
  • 2019Mechanical

    Foundation only - building. E - 58 units; P20-0438-plumbing Alt Comm: Podium style four story 60 unity complete plumbing system; E21-0308-Ele Alt Comm: Wiring for superstructure of building E; H21-0557-Mech No Fee: Building E floors 2 and 3 - air handler installs, heating piping, refrigeration and ductwork for heating cooling systems; H21-0573-Mech No Fee: BUILDING E MECHANICAL AND HVAC WORK PER PLANS; H21-0606-Mech No Fee: Heating piping, refrigeration piping and sheet metal - Blg E 5th floor, and all hookups.

    $804K
Satellite view of 50 Guards Rd, Greenwich, CTSatellite view
2020

50 Guards Rd

Greenwich, CT
  • 2020Renovation

    Remodel 5 bathrooms (no structural work needed). Modify section of kitchen. No layout changes; plumbing and electrical fixtures to remain in the same place. State education fee paid: $123.50.

    $475K